lhc first lhc emittance measurements at 6.5 tev ibic15 melbourne, australia 2015 maria kuhn 1,2 –...

Post on 03-Jan-2016

217 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

LHC

First LHC Emittance Measurements at 6.5 TeV

IBIC15 Melbourne, Australia 2015

Maria Kuhn1,2 – September 16, 2015

F. Antoniou2, E. Bravin2, B. Dehning2, J. Emery2, V. Kain2, A. Langner1,2, Y. Papaphilippou2, E. Piselli2, G. Trad2

,

1Hamburg University, Hamburg, Germany,2CERN, Geneva, Switzerland

LHC

M. Kuhn - Sept. 16, 2015

Introduction: LHC Cycle and Beam Parameters

o Injection

o Ramp

o Squeeze

o Collisions

2

450 GeV injection plateau (30min)

Energy ramp (20.2 min)

b* squeeze (12.5 min)

o Two circulating beams.

− Beam 1 rotating clockwise, beam 2 counter-clockwise.

o Collisions in four interaction points in the LHC.

− ATLAS and CMS are the two large multi purpose detectors.

LHC

M. Kuhn - Sept. 16, 2015

Introduction: LHC Cycle and Beam Parameters

o Injection

o Ramp

o Squeeze

o Collisions

3

450 GeV injection plateau (30min)

Energy ramp (20.2 min)

b* squeeze (12.5 min)

Proton beam parameters LHC Design 2012 LHC Early 2015 LHC

# bunches/ beam 2808 1374 3 - 458Bunch spacing [ns] 25 50 25 and 50Mean bunch length [ns] 1.3 1.2 1.2Bunch intensity [1011 p] 1.15 1.1 - 1.7 1.0 – 1.2Emittance at injection [mm] 3.5 1.5 – 2.0 1.5 – 3.0Collision energy/beam [TeV] 7 4 6.5Emittance at collision [mm] 3.75 2.4 1.5 – 4.0b* at ATLAS/CMS [m] 0.55 0.6 0.8

LHC

M. Kuhn - Sept. 16, 2015

o In 2012 LHC was operated with high brightness beams.

− Transverse emittance could not be preserved during the LHC cycle.

− ~ 0.4 – 0.9 mm normalized emittance growth from LHC injection to start of collisions.

− But emittance measurement precision during LHC Run 1 doubtful.

Reminder: 2012 Emittance Blow-up

4

2012 LHC performance

LHC

M. Kuhn - Sept. 16, 2015

LHC Wire Scanner Intensity Limitations

o Several types of beam profile measurement systems in the LHC.

− The wire scanners are the most precise and versatile instruments.

− Two operational wire scanners per beam.

• Horizontal and vertical.

o Wire scanners cannot be used with high intensity physics fills.

− Synchrotron light telescope (BSRT) is used for that purpose.

o BSRT cross calibrated with wire scanners.

o Currently, wire scanners are the only instrument to measure beam sizes through the LHC energy ramp.

− Low intensity test fills (a few bunches) are measured to evaluate emittance preservation during the LHC cycle.

5

LHC

M. Kuhn - Sept. 16, 2015

Run 2 LHC Wire Scanner Accuracy

o Transverse normalized emittance e:

− (For location with no dispersion)

LHC Run 2 optics measured with k-modulation at 450 GeV and turn-by-turn phase advance method at 6.5 TeV.

− b function accuracy better than 3 %.

6

𝜺𝒙 ,𝒚=𝜸𝝈 𝒙 , 𝒚

𝟐

𝜷𝒙 ,𝒚

Wire scanner beam size s accuracy

− Wire position measurement precision

• Estimated position measurement potentiometer precision: 50 mm

− Wire position measurement calibration

• Verified with beam by orbit bump scans at the wire scanner location

Lorentz factor g (beam

energy)

LHC

M. Kuhn - Sept. 16, 2015

Wire Position Measurement Calibration

o Using local orbit bumps to verify the wire position measurement calibration of the wire scanners.

− Beam position measured with LHC orbit system and extrapolated to wire scanner.

− Compared to mean position obtained from Gaussian fit to measured transverse beam profile.

− Measurements at 450 GeV and 6.5 TeV are consistent.

Overestimating B2V emittances by 6.6 %.

7

Example B2V1: slope of linear fit shows + 3.3 % calibration

error.

LHC

M. Kuhn - Sept. 16, 2015

Wire Scanner Emittance Measurement Errors

o Wire scanner position calibration verification results (Decalibration):

− Another set of orbit bumps foreseen for the near future to check reproducibility of obtained results.

− The results in this talk do not include a correction of the calibration.

o All wire scanner measurements show large s spread from scan to scan (De450GeV and De6.5TeV).

− Depending on scanner and energy.

8

Wire Scanner Decalibration [%]De450GeV [%]

De6.5TeV [%]

B1H2 + 7.2 25 20B1V2 - 5.2 20 10B2H1 + 9.0 25 15B2V1 + 6.6 15 10

LHC

M. Kuhn - Sept. 16, 2015

Photomultiplier Working Point Investigations

o Wire scanner shower product amplified by photomultiplier (PM).

− Amplification settings (gain + filter) can alter obtained beam profile.

o LHC Run 1: strong dependence of measured s on PM settings.o Optimum PM working point has to be established!

− Scan through all available gain and filter setting combinations.

9

Bunches with different beam sizes were injected.

To remove natural e growth, scans with fixed reference settings done after each settings change.

Exponential fit

Example: B2V1 at 450 GeV

LHC

M. Kuhn - Sept. 16, 2015

Photomultiplier Working Point Investigations

o Wire scanner shower product amplified by photomultiplier (PM).

− Amplification settings (gain + filter) can alter obtained beam profile.

o LHC Run 1: strong dependence of PM settings on measured .s

o Optimum PM working point has to be established!

− Scan through all available gain and filter setting combinations.

10

Measured beam sizes minus the fitted growth.

Measurements with same gain + filter settings are averaged.

No sign of PM saturation at 450 GeV could be detected.

Same for 6.5 TeV.

LHC

M. Kuhn - Sept. 16, 2015

First Emittance Measurements (1)

o Example Fill 4284 (August 28, 2015):

− 3 bunches with different initial emittances, intensities (0.6 – 1.1 x 1011 ppb) and bunch lengths (1.0 – 1.25 ns).

11

IBS simulations with MADX IBS module include measured initial beam parameters, dispersion, and radiation damping.

Measurements in the horizontal planes match IBS simulation.

LHC

M. Kuhn - Sept. 16, 2015

First Emittance Measurements (2)

o Example Fill 4284 (August 28, 2015):

− 3 bunches with different initial emittances, intensities (0.6 – 1.1 x 1011 ppb) and bunch lengths (1.0 – 1.25 ns).

12

IBS simulations with MADX IBS module include measured initial beam parameters, dispersion, and radiation damping.

Measurements in the horizontal planes match IBS simulation.

e450GeV [mm]

e6.5TeV

[mm]De [%] Desim [%]

B1H 1.90 2.08 9 8B1V 1.71 2.04 19 -2B2H 1.50 1.65 10 10B2V 1.58 1.95 23 -2

Emittance growth through the cycle of bunch 3

Vertical emittance growth through the cycle could not be reproduced with IBS simulations.

LHC

M. Kuhn - Sept. 16, 2015

Emittance Growth during the LHC Ramp

o Measured b during ramp not yet available.

− Using linear interpolation of measured b at injection + flattop.

o Current b knowledge results in unphysically growing/shrinking e.

− Run 1 experience: non-monotonically changing b functions during the ramp.

13

Measurements in the horizontal planes consistent with IBS simulations during the ramp.

Beam 2 vertical emittances grow 20 % (~ 0.3 mm).

LHC

M. Kuhn - Sept. 16, 2015

Emittance Preservation during the Squeeze

o Within measurement accuracy emittances are conserved during the b* squeeze.

− Result is reproducible.

14

Emittances measured with BSRT and averaged over several hundred measurements.

Also need measured b functions during the squeeze.

LHC

M. Kuhn - Sept. 16, 2015

Emittance at Start of Collisionso Comparison of emittance from wire scans

and luminosity:

− Fill 3954 (July 4, 2015), one bunch in collision.

− According to experts ATLAS luminosity low by ~10 % with uncertainty±10 %.

• 5 % error on crossing angle

• ±1 cm error on measured bunch length.

• b* measured with k-modulation with 1 % uncertainty.

o Preliminary: ATLAS and wire scanner results agree within errors.

− Better than during Run 1.

15

Injection Collision GrowthWS e [mm] 2.51 ± 0.10 2.75 ± 0.20 0.24 10 %ATLAS e [mm] n.a. 2.97 ± 0.36 0.46 19 %

L …. Luminosityk …. # bunchesN …. # protons / bunchf …. Revolution freq.F …. Luminosity reduction factor

𝐿=𝑘𝑁 2 𝑓 𝛾4 𝜋 𝛽∗𝜀

∙𝐹

LHC

M. Kuhn - Sept. 16, 2015

Radiation Damping at 6.5 TeVo At high energies protons circulating in the LHC emit enough

synchrotron radiation to modify the beam parameters

− First observed during LHC Run 2

− Counteracts IBS: reduction of vertical emittance

16

Simulations with MADX IBS module.

Simulation predicts slightly faster emittance decrease than measured with BSRT.

Additional emittance growth from proton collisions + beam–beam effects not included in the simulation.

LHC

M. Kuhn - Sept. 16, 2015

Current Performance of the LHCo Emittance in collisions

derived from luminosity.

o Injection emittance of first batch measured with SPS and LHC wire scanners.

Emittance blow-up through the cycle:

o 50 ns beams show very little blow-up (~ 10 %), much smaller than during Run 1.

o Large blow-up for 25 ns beams (25 % for most recent fills).

− Electron cloud effects

− Beam instabilities

17

LHC

M. Kuhn - Sept. 16, 2015

Summary & Conclusiono Good progress in understanding wire scanner emittance

measurements for LHC Run 2.

− Wire scanner calibration verified, no PM saturation effects detected.

Emittance growth during the LHC cycle:

− Horizontal emittance growth matches IBS simulations.

− Small growth in the vertical planes not yet understood.

• Caveat: single bunch fills.

− Synchrotron radiation damping observed for the first time at 6.5 TeV.

− With still not fully calibrated luminosity data: emittances from wire scans and ATLAS luminosity agree within errors.

o Smaller emittance blow-up (~ 10 %) through the cycle than during Run 1 for 50 ns beams.

o 25 ns physics beams show much larger growth.

− Electron cloud effects and beam instabilities. 18

LHC

M. Kuhn - Sept. 16, 2015

APPENDIX

19

LHC

M. Kuhn - Sept. 16, 2015

Outlineo LHC cycle and beam parameters

− LHC Run 1 transverse normalized emittance blow-up

o LHC wire scanner intensity limitations

o Run 2 LHC wire scanner accuracy

− Wire position measurement calibration

− Photomultiplier working point investigations

o First transverse normalized emittance measurements

− Emittance growth during the LHC ramp

− Emittance preservation during the squeeze

− Emittance at start of collisions

− Radiation damping at 6.5 TeV

o Current performance of the LHC

20

LHC

M. Kuhn - Sept. 16, 2015

CERN Accelerator Complex

21

Beam 1

TI2

Beam 2

TI8

LHC proton path

The LHC needs most of the CERN accelerators...

LHC

M. Kuhn - Sept. 16, 2015

Photomultiplier Saturation Studies Run 1

o Photomultiplier (PM) gain and filter can have a strong influence on measured beam size

− See measurements of 2012

22

PM saturation studies at 4 TeV in 2012.

PM saturation studies at 450 GeV in 2012.

Observed strong gain dependence at 450 GeV and 4 TeV during Run 1!

LHC

M. Kuhn - Sept. 16, 2015

Photomultiplier Working Point at 6.5 TeV

o Measurements at 6.5 TeV more difficult.

− Smaller range of possible PM settings before ADC saturation.

o No evident sign of PM saturation at 6.5 TeV could be seen.

o Run 1 investigations showed significant dependency of measured beam size on PM settings.

LHC wire scanner upgrade during Long Shutdown 1:

− One broken wire scanner replaced (beam 2).

− Power supply schematics upgraded.

− PM gain dependency on light intensity reduced.

23

LHC

M. Kuhn - Sept. 16, 2015

LHC Optics Measurementso Can use results from optics measurements with the turn-by-turn

phase advance method and k-modulation for:

o Outstanding measurements:

− K-modulation at 6.5 TeV and after the squeeze

− Turn-by-turn phase advance measurements at 450 GeV (repeated) and during the ramp!

o For emittance plots: using measured b where possible

− b function measurement error < 3 %

− Maximum measured beta beat is 5 % at the wire scanners

− Linear interpolation during the ramp and squeeze

24

IR4 IP1/2/5/8

Injection Ramp Flattop After Squeeze b*

K-modulation x xTurn-by-turn x x

LHC

M. Kuhn - Sept. 16, 2015

b* Measurementso Sinusoidal k-modulation in IP1/5 on August 8, 2015

25

I = 10 Af = 0.01 Hz

Measurement error on tune oscillation amplitude in sub-percent level b* meas. uncertainty ≤ 1 % Beta beat ≤ 1 % Compatible with turn-by-

turn measurements

Preliminary!

IP1 [m] IP5 [m]

B1 B2 B1 B2b* H 0.81 0.79 0.80 0.80DbH 0.01 0.004 0.001 0.01b* V 0.81 0.79 0.79 0.79DbV 0.01 0.01 0.01 0.002

LHC

M. Kuhn - Sept. 16, 2015

Bunch Length Measuremento Longitudinal bunch shape not Gaussian at 6.5 TeV

− Due to controlled longitudinal RF blow-up at flattop energy

o But LHC bunch length monitor publishes 4s bunch length values based on FWHM algorithm assuming Gaussian profiles

Bunch length error ±1 cm!

“True” emittance from luminosity should be larger by 0.1 mm

26

top related