Logistics for P5
• Underground visit of CMS Detector with CMS Technical coordination– We are in the middle of LS1 … what is going on on the detector?
• Tour of surface infrastructure and P5 site– What is behind getting a huge experiment like CMS to work– Control Room, Labs, power, cryo, cooling, PC farm etc
• Run Coordination, Technical Coordination and BRIL – We are in the middle of the Weekly Global Run #2– Take advantage of chance to ask questions and participate in getting
the experiment ready, tuning the CMS engine for Run II.– Ask questions about CMS and LHC
• Many experts will be in P5, your guides are special chosen, please take advantage of interacting with them
Outline of the afternoon
• General program– 12:45-13:15 - travel to P5– 13:15-14:20 lunch (tent +picnic)– 14:20-14:30 group photo – 14:30-17:30 talks/visits groups 1,2,3– 18:00 bus return to CERN
• Special program summer students: – As above except– 14:30-15:45 talks/visits summer students– 16:00 bus return to CERN for summer students
Bus to P5• Bus 1 = group 1 + summer students• Bus 2 = group 2• Bus 3 = group 3
• Follow Umbrellas• Buses parked close to entrance A• Picnic lunch P5
Doga GulhanCMS Young Scientist Committee
Zsuzsanna GaraiCMS Secretariat
Pavel JezCMS Young Scientist Committee (Chair)
Restaurant 1
Arrival P5, program begins with picnic lunch
Afternoon visit in P5; Groups 1a,1b,2,3,
Summer students = 1a
Summer students = 1a
1b
1b
1b
Session 1; Groups Groups 1a,1b,2,3
Group 3 ~ 45 people
Surface Guides:
3a: Sergei Lusin 3a Martin Gastal 3a: Ken Bell3b: Andrea Gaddi3b Jean Fay 3b: Dragoslav Lazic
Support:
Jorgen D’Hondt (time keeper)
Benoit Cure stationed in compressor plant to explain magnet (session 1 only)
Summer students (1a) ~ 30
Guides:
Mick StorrMilena Quittnat (CMS YSC)
Support:
Gianluca CerminaraFrank Hartmann
Group 1b ~ 25 people
Speakers:
Christoph SchwickNiels Dupont
Support:
Kersin BorasSilvia Goy
Group 2 ~ 45 people
Guides:
2a Austin Ball2a Francesco Palmonari2b Wolfram Zeuner 2b Zoltan Szillasi
Support:
Luca MalgeriPavel Jez
1b
Session 2; Groups 1a,1b,2,3
Group 3 ~ 45 people
Speakers:
Christoph SchwickNiels Dupont
Support:
Silvia GoyJorgen D’Hondt
Summer students (1a) ~ 30
Guides:
Mick StorrMilena Quittnat (CMS YSC)
Support:
Frank Hartmann, Gianluca Cerminara
Group 1b ~ 25 people
Guides:
1b Austin Ball1b Wolfram Zeuner 1b) Francesco Palmonari
Support:
David SticklandZoltan Szillasi
Group 2 ~ 45 people
Surface Guides:
2a: Sergei Lusin2a: Martin Gastal2b: Andrea Gaddi2b: Jean Fay
Support:
Dragoslav Lazic Ken BellPavel Jez
1a
1b
Session 3; Groups 1a,1b,2,3
Group 2 ~ 45 people
Speakers:
Christoph SchwickNiels Dupont
support:
Silvia GoyRoberto CarlinKen Bell
Group 3 ~ 45 people
Guides:
3a Austin Ball3a Wolfram Zeuner 3b Zoltan Szillasi3b David Stickland
Support:
Frank HartmannJorgen D’Hondt
Group 1b ~ 25 people
Surface Guides:
1b: Sergei Lusin 1b: Martin Gastal1b: Andrea Gaddi
Support
Jean FayDragoslav Lazic
2 Cooling & HVAC1.Dump resistor
3. Gas mixing 4.Gas dewars
5. CMS He dewars
6.Cooling towers
7. LHC He dewars
8. He compressors & dry gas
9. Pixel cold lab plant
10.Main workshops11.Detector labs overlook
Pit head cover etc
12.Electrical supply & diesel
14.Control rooms
13. Exhibition tent
No entry in SGX, SF, SRQuick look in SUX,SH. (work permitting).
Induction tours: P5 Surface ItineraryStart at Dump resistorEnd in control room
CMS Technical Coordination16 Jul 2014 DHLast change 16 Jul 2014 AB
Induction tours: P5 Surface ItineraryStart at Dump resistorEnd in control room
CMS Technical Coordination16 Jul 2014 DHLast change 16 Jul 2014 AB
1. Dump resistor2. Cooling and HVAC3. Gas mixing4. Gas dewars5. CMS He Dewars6. Cooling Towers7. LHC He Dewars8. He compressors & dry gas9. Pixel cold lab plant10. Main Workshops11. Detector labs overlook12. PIT head cover13. Electrical supply & diesel
• on way to tent explain orientation of tunnel, structure of Point 5 caverns, location of Points 4 & 6
14. Exhibit tent• view CMS Scale model as preparation for
underground visit15. Server room upstairs, Control Room
No entry in SGX, SF, SRQuick look in SUX,SH. (work permitting).
Other Logistics
• Lunch, Juice breaks & general P5 logistics– Noemi Beni– Tom Dodington
• Tent, photograph logistics– Marzena Lapka, Achintya Rao
top related