THE�IMPORTANCE�OF�LOGISTYC�IN�TBM�TUNNELLING��

“ From the most remote sites to the crowded cities projects”“ From the most remote sites to the crowded cities projects”

2Ing. Remo Grandori

•TRANSPORT�TO/FROM�SITE•SITE�ASSEMBLY/DISASSEMBLY•SITE�INSTALLATIONS•TBM�OPERATION•EXTRAORDINARY�REPAIRS��AND�GEOLOGICAL�UNFORESEENS

•TRANSPORT�TO/FROM�SITE•SITE�ASSEMBLY/DISASSEMBLY•SITE�INSTALLATIONS•TBM�OPERATION•EXTRAORDINARY�REPAIRS��AND�GEOLOGICAL�UNFORESEENS

WHEN LOGYSTIC COUNTS

3Ing. Remo Grandori

TRANSPORTS��TO/FROM�SITE

•WEIGHT LIMITATIONS• SIZE LIMITATIONS•BRIDGES, TUNNELS, VILLAGES•SLOPE LIMITATIONS•NARROW CURVES•AUTHORIZATIONS

4Ing. Remo Grandori

CRITICAL ACCESS ROADS

ACCESSING�THE�HYMALAYA�WITH�KISHANGANGA�TBM

5Ing. Remo Grandori

REMOTE COUNTRIES

8�m�DSU/EPB�TBM�TRANSPORT�TO�BELES�(ETHIOPIA)

6Ing. Remo Grandori

SPECIAL TRANSPORTS

TURIN�METRO�TBM��TRANSPORTED�TO�NEXT�STATION

7Ing. Remo Grandori

CROSSING SMALL CITIES

������� �� ���������

8Ing. Remo Grandori

TBM�ASSEMBLY

CRAINES�CAPACITYCRAINES�CAPACITY

SPACE�

RESTRI

CTIONSSPA

CE�

RESTRI

CTIONS

CRAINES�POSITIONING

CRAINES�POSITIONING

ASSEMBLY

SEQUENCEASSEMBLY

SEQUENCE

SAFETY

SAFETY

NOISELIMITSNOISELIMITS

9Ing. Remo GrandoriLOS�BRONCHES�MINE�� CHILE

IN�CAVERN

10Ing. Remo GrandoriCOLLAPSIBLE�TBM�� NEW�YORK

UNDERGROUND�WITH�NO�CAVERN

11Ing. Remo Grandori

IN�LIMITED�OUTSIDE�SPACES�

S.FRANCISCO.�EQUADOR� ANDES

12Ing. Remo Grandori

IN�SHAFTS�WITH�LIMITED�SPACES�

METRO�B1�� ROME

13Ing. Remo Grandori

HEAVY�LITS�

ATHENS�METRO

14Ing. Remo Grandori

TBM�DISASSEMBLY

���������������������������������������������

15Ing. Rmo Grandori

LA�JOJACOSTARICA

DISMOUNTING�SEQUENCE�WITH�

LATERAL�DISPLACEMENT�OF�THE�TBM�

SHIELDS

IN�TRENCH�

VANCOUVER METRO

TBM DISASSEMBLY IN THE CITY CENTER

VANCOUVER METRO

TBM DISASSEMBLY IN THE CITY CENTER

IN�CONGESTED�CITIES�

17Ing. Remo Grandori

TBMS�SITE�INSTALLATIONSTBMS�SITE�INSTALLATIONS

CLIMATE

WORKSHOP

PORTAL�AREA

POWER�

MUCK�DISPOSAL

SPARES STORE

MATER.�STOCK

CAMP

WATERCRAINAGE

18Ing. Remo Grandori

REMOTE SITES

KISHANGANGA� INDIA� HYMALAYA

19Ing. Remo Grandori

SITES WITH RESTRICTED ACCESS

VAL�PASSIRIO�TUNNEL� ITALY

20Ing. Remo GrandoriLOS�BRONCHES�MINE�– CHILE�� 3400�M�ALTITUDE

SITES IN COLD CLIMATES

21Ing. Remo Grandori

TBM SITES OVER BRIDGES

BRENNER�BASIS�TUNNEL�� ITALY

22Ing. Remo Grandori

TBM SITES IN CONGESTED CITIES

SELI�DSU�TBM�SITE�IN�HONG�KONG�– TSUEN�WAN�

UMIRAY�ANGAT�TUNNELPHILIPPINES

SITE�INSTALLATIONS,�SEGMENTS�PRODUCTION�AND�TBM�OPERATION

ALL�SERVED�BY�HELICOPER

SITES WITH ONLY HELICOPTER ACCESS

24Ing. Remo Grandori

SITES WITH MULTIPLE TBMS

2�DS�TBM�10�M�DIAMETER�– PERTUS�–SPAIN�

25Ing. Remo Grandori

SPECIAL�REPAIRS/OVERHAULS

� GILGEL�GIBE�– ETHIOPIA�–TBM�DISMOUNTED�AND�TRANSPORTED�BACK�THROUGH�THE�

TUNNEL FOR REPAIR AND OVERHAUL

26

GILBE�GIBE�ETHIOPIA

SPECIAL�REPAIRS/OVERHAULS

TBM�RE�ASSEMLED�INSIDE�THE�TUNNEL

27Ing. Remo Grandori

STANDARD�TBM�DESIGN

�������

���������

�������

�����������������������

�������������������

��������������

�������������������

28Ing. Remo Grandori

SPECIAL�TBM�SYSTEM�DESIGN

COLLAPSABLE�SHIELDS�TBM

CONTAINERIZED�BACK�UP�DECKS

VERTICAL�CONVEYOR�TOWER

COMPACT�TBM�SYSTEM�– CREVOLA�PROJECT�� ITALY�

CONTAINERIZED�SITE��

INSTALLATIONS