Sec. : Louvre RoofDate : Aug 2018
ISSU
E: L
R-01
-001
Louvre Roof
SPEC
IFIC
ATIO
NS
.
www.window-treatments.co.nz
ISSU
E: L
R-01
-001
SPEC
IFIC
ATIO
NS
.
www.window-treatments.co.nz
Measuring Guide & General System InformationSize Limits:• Minimum overall width: 1800mm• Maximum overall width: 4185mm• Minimum overall projection 2000mm• Maximum overall projection without
additional centre post on the projection beams: 5200mm
• Maximum overall projection with additional centre posts on the projection beams: 7000mm
Note: Projection measurement can only be in multiples of 200mm as this is the spacing between the louvres. Examples: Projection of 2200mm, 4800mm & 5400mm are acceptable however 2100mm, 4900mm & 6300mm are not.
• Maximum overall height: With Posts: 2700mm, Without Posts: no maximum
• Clear space of 100mm is required over the top of the aluminium projection beam and cross beams to allow for the rotation/opening of the louvres and clearance for the motor.
• Maximum size possible without requiring a building consent: 20m2 providing the louvre roof is at ground level or 1st storey level.
• Sizes exceeding 20m2 will require a building consent. • Louvre Roofs, irrespective of size installed on the 2nd storey level or
above will require a building consent.• The customer is responsible to apply and obtain a building consent
if it’s required. Window Treatments NZ Ltd do not apply for building consents if required.
• Irrespective of whether a building consent is required, all installations and fixings must meet NZ building code standards.
Louvre Roof - Overview
Sec. : Louvre RoofDate : Aug 2018
ISSU
E: L
R-02
-001
4 TECHNICAL CATALOGUE The producer reserves the right to intoduce product changes at any time without prior notice
available colours RALelectric drive yesmanual drive nomaximum projection 7 mmaximum width 4 mrainproof system yesroof drainage yesmodular system yescover sunbreaker blades
Solid Sunbreaker System
TECHN
ICALCATALO
GUE
5The
producerreservesthe
righttointoduce
productchangesatany
timewithout
priornotice
Solid Sunbreaker System
78
1
2
10
63
10
8
54
8
8
9
Isometric exploded view
- single module
11
11
Window Treatments Louvre Roof:Available Colours : Gunmetal, Perla & SpecialElectric Drive : YesManual Drive : NoMaximum Projection : 7000mmMaximum Width : 4185mmRainproof system : YesRoof Drainage : YesModular System : Yes
Back
Front
Window Treatments Louvre Roof:1. Projection Beam (bearing side)2. Cross Beam (back)3. Cross Beam (front)4. Projection Beam (drive side)5. Back Post6. Front Post7. Blade8. Gutter9. Motor10. Drip profile11. Pivot Side Rails (2 parts)
Front
Back
SPEC
IFIC
ATIO
NS
.
www.window-treatments.co.nz
Multi-modular Louvre Roofs
• For areas requiring coverage wider than the 4185mm maximum overall width, two or more modules can be connected together. In this case the projection beams and posts are shared between the modules.
• Where an area longer than the 7000mm maximum length (projection) is required, additional modules can be installed but they are to be self-supporting which means that they cannot share cross beams or end posts.
Louvre Roof- Multi-modular
Sec. : Louvre RoofDate : Aug 2018
TECHNICAL CATALOGUE 7The producer reserves the right to intoduce product changes at any time without prior notice
Isometric view modular system
Solid Sunbreaker System
Back
Front
Window Treatments Louvre Roof:1. Projection Beam (bearing side)2. Gutter3. Projection Beam (drive side)4. Cross Beam (back)5. Drip Profile6. Cross Beam (front)7. Blade8. Front post (modular)9. Front Post10. Projection Beam (modular)11. Back Post12. Motor13. Pivot Side Rails
8TECH
NICAL
CATALOG
UEThe
producerreservesthe
righttointoduce
productchangesatany
timewithout
priornotice
Solid Sunbreaker System
1
9
8
9
5
6 2
5
6 2
3
12
2
2
4
2 10
2
11
25
11
4
25
11
7
13
13
13
Back
Front
ISSU
E: L
R-02
-001
SPEC
IFIC
ATIO
NS
.
www.window-treatments.co.nz
Gutters & Drainage
• The louvre roof and posts must be installed level.• The gutters are installed level.• Gutters are installed onto both projection beams (one each side).• Water from the gutters drain through a hole at the back of the gutter into the post. The post is hollow which
allows the water to drain and dissipate at the base of the post. No additional drainage fittings are provided by Window Treatments NZ Ltd.
• A selection needs to be made at the time of the order, which posts will be used to drain water from the gutters to the ground.
• Small drip profiles are installed on both cross beams of the louvre roof. The small drip profiles are designed to deflect any drips from the last louvre closest to the cross beams.
• Flashings or other special fittings are to be supplied by the customers.• The louvre roof is weather proof but is not guaranteed to be water tight in adverse or storm conditions. The
louvres must be opened when wind exceeds 65km/hr and or when snowing. Note: When installing a louvre roof into an existing pergola structure, the customer will need to arrange drainage alternatives given that there will be no pole/posts which normally provide drainage to the ground (See picture A for special drainage example completed by the customer)
Louvre Roof- Gutters & Drainage
6 TECHNICAL CATALOGUE The producer reserves the right to intoduce product changes at any time without prior notice
B A
maximum projection 7000mm
front back
Side view
Detail A
200
25
Detail A Detail B
200
50
15
200
50
15
C
maximum width max 4185mm
motor
heig
ht 270
0mm
3058
15
30
Solid Sunbreaker System
Picture A
10 TECHNICAL CATALOGUE The producer reserves the right to intoduce product changes at any time without prior notice
220
200
75
Ø8.2
45
805030
Drive - Picollo XL motor
Drive rod bracket
Motor bracket
66.6
2
48
65
blade end cap (drive)
blade end cap(bearing)
Solid Sunbreaker System
Sec. : Louvre RoofDate : Aug 2018
ISSU
E: L
R-03
-001
SPEC
IFIC
ATIO
NS
.
www.window-treatments.co.nz
Installation Types
1. Free standing Louvre Roof with 4 or 6 posts: The louvre roof is not attached to a wall, house or building and is free standing. If the projection exceeds 5200mm, middle posts on the projection beams will be required (total 6 posts).
2. Existing Pergola structure: Installing a louvre roof within (face mounting) an existing pergola structure into Steel, Timber or Concrete. In this case unless requested, the louvre roof is supplied only with the “pivot side rails” which are fixed onto the existing structure. This means that standard 150mm x 85mm cross beams, projection beams and posts are not provided as part of the louvre roof order. Installing a louvre roof within an existing pergola structure is possible provided:
1. The structure corners are square, 2. Both ends are the same width, 3. Both projections are the same length. 4. Both diagonal measurements are the same.
3. Installing against an existing house or wall structure: Standard face mounting brackets are available when installing onto an existing house or wall structure. Additional costs will apply for any special engineered wall mounting brackets required.
Note for 2. & 3. : When installing a louvre roof into an existing pergola structure or against an exisiting house or wall, the customer will need to arrange drainage alternatives given that there will be no posts supplied (which would normally provide drainage to the ground).
Louvre Roof- Installation Types
Sec. : Louvre RoofDate : Aug 2018
1.
2.
3.
3. 3.
ISSU
E: L
R-03
-001
SPEC
IFIC
ATIO
NS
.
www.window-treatments.co.nz
Choosing the Louvre Direction
In New Zealand it is generally recommended that louvres lie on an East to West axis irrespective of the rotation direction. This means that the projection beams lie on the North to South axis.
Louvre Roofs are primarily designed to provide rain and wind shelter. However, it is important to also consider the shading effect the louvre roof may have over an adjacent building or space and then to maximise or minimise this effect depending on the customers preference.
If sun shading to an adjoining building or space is not desired, we recommend the louvres rotate from the closed position to opening, with the sharp edge of the louvre (side without the drain), rising to the North, North/West or Westerly direction. This means that the maximum amount of direct sunlight possible will penetrate through the louvres to the ground below. This louvre opening direction is defined as opening to the FRONT of the louvre roof.
If sun shading to an adjoining building or space is desired, then the louvres should be facing opposite to the above which will block most direct sunlight. This louvre opening direction is defined as opening to the BACK of the louvre roof.
Louvre Roof- Louvre Direction
TECHNICAL CATALOGUE 9The producer reserves the right to intoduce product changes at any time without prior notice
Solid Sunbreaker SystemDimensioning of multi-modular system.
In multi-modular pergola dimensioning of one module follows the same pattern as in single-module pergola. The difference lies in specyfying the width.
H - clear height under front barXL - width of the extreme left module (max 4000 mm) XC - width of the central modules (max 4000 mm) XR - width of the extreme right module (max 4000 mm)
motor motormotor
XL X XP
200mm
Blades cross section - closed position
40mm
215mm
Blade
FRONT BACK
TECHNICAL CATALOGUE 9The producer reserves the right to intoduce product changes at any time without prior notice
Solid Sunbreaker SystemDimensioning of multi-modular system.
In multi-modular pergola dimensioning of one module follows the same pattern as in single-module pergola. The difference lies in specyfying the width.
H - clear height under front barXL - width of the extreme left module (max 4000 mm) XC - width of the central modules (max 4000 mm) XR - width of the extreme right module (max 4000 mm)
motor motormotor
XL X XP
200mm
Blades cross section - closed position
40mm
215mm
Blade
3.10mm
Sec. : Louvre RoofDate : Aug 2018
ISSU
E: L
R-04
-001
Unregistered Version - http://www.aidecad.com
UnregisteredVersion - http://www.aidecad.com
FRONT BACK
OPEN
CLOSED
Louvre
Unregistered Version - http://www.aidecad.com
Marine Grade Stainless Pivot Plate
Louvre Noise Damper
Unregistered Version - http://www.aidecad.com
Maximum 900 opening
mm DIRECTION OF OPENING
mm
RAL9007 MAT FRONT
FSM71319
WHITE
DARK GREY
BLACK
QUANTITY
DRIVE SIDE LEFT RIGHT
Switch
RTS SLIM receiver
RTS receiver
TELIS 1
TELIS 4
TELIS 4 SOLIRIS
SELT Sp. z o.o.FC / SELT / 087 - 3 - EN
REMARKSDRIVE OPERATION
DELIVERY ADDRESS
The Buyer hereby declares that they speak fluent English, understand the statements received and submitted in English, orders submitted, and to have read and accepted General Sales Terms and Conditions, General Warranty Terms and Conditions, Technical-operational documentation and Declaration of performance for external systems, Declaration of Conformity for systems with motor drive and information on safety elements installation for internal systems operated with cord and ball chain, available at www.selt.com/doc-en.COMPANY, DATE, SIGNATURE
Sunis WireFree Sensor RTS
SELT COLLECTION COLOURS
OTHER SELT COLLECTION COLOURS
PVC GASKETS
SUNBREAKER FOR PERGOLA SYSTEMSYSTEM PROJECTION
SYSTEM WIDTH
mm L 1500 ≤ L ≤ 5200
mm B
mm H1
RAL9007 MAT
FSM713195400 ≤ L ≤ 7000
WHITE
DARK GREY
BLACK
QUANTITY FRONT
DRIVE SIDE LEFT RIGHT
FREE STANDING FOOT WALL
Switch
RTS SLIM receiver
RTS receiver
TELIS 1
TELIS 4
TELIS 4 SOLIRIS
SELT Sp. z o.o.FC / SELT / 087 - 2 - EN
PERGOLA SUNBREAKER
PVC GASKETS
Sunis WireFree Sensor RTS
DELIVERY ADDRESS
The Buyer hereby declares that they speak fluent English, understand the statements received and submitted in English, orders submitted, and to have read and accepted General Sales Terms and Conditions, General Warranty Terms and Conditions, Technical-operational documentation and Declaration of performance for external systems, Declaration of Conformity for systems with motor drive and information on safety elements installation for internal systems operated with cord and ball chain, available at www.selt.com/doc-en.COMPANY, DATE, SIGNATURE
REAR FOOT NEAR THE WALL
SELT COLLECTION COLOURS
OTHER SELT COLLECTION COLOURS
SYSTEM HEIGHT
SYSTEM PROJECTION
SYSTEM WIDTH
REMARKSDRIVE OPERATION
DIRECTION OF OPENING
4.185m
2.7m
mm L 1500 ≤ L ≤ 5200
mm B
mm H1
RAL9007 MAT
FSM713195400 ≤ L ≤ 7000
WHITE
DARK GREY
BLACK
QUANTITY FRONT
DRIVE SIDE LEFT RIGHT
FREE STANDING FOOT WALL
Switch
RTS SLIM receiver
RTS receiver
TELIS 1
TELIS 4
TELIS 4 SOLIRIS
SELT Sp. z o.o.FC / SELT / 087 - 2 - EN
PERGOLA SUNBREAKER
PVC GASKETS
Sunis WireFree Sensor RTS
DELIVERY ADDRESS
The Buyer hereby declares that they speak fluent English, understand the statements received and submitted in English, orders submitted, and to have read and accepted General Sales Terms and Conditions, General Warranty Terms and Conditions, Technical-operational documentation and Declaration of performance for external systems, Declaration of Conformity for systems with motor drive and information on safety elements installation for internal systems operated with cord and ball chain, available at www.selt.com/doc-en.COMPANY, DATE, SIGNATURE
REAR FOOT NEAR THE WALL
SELT COLLECTION COLOURS
OTHER SELT COLLECTION COLOURS
SYSTEM HEIGHT
SYSTEM PROJECTION
SYSTEM WIDTH
REMARKSDRIVE OPERATION
DIRECTION OF OPENING
4.185m
2.7m
SPEC
IFIC
ATIO
NS
.
www.window-treatments.co.nz
Fixing & Footings
All fixings and footings must meet NZ building code standards.• All foundations and or suitable footings are provided by the customer. Foundations and footings are required to meet the building code and need to be perfectly level. Typical
foundation/footing example drawings are attached as a guide for the customer.
• Window Treatments NZ Ltd will secure the louvre roof posts to the foundation/footings.
• The footing plates which are fitted onto the bottom end of the posts, are available in 9 variations. A footing plate needs to be selected for each post at the time of the final check measure.
• Face mounting brackets are available for standard installations.
• Additional costs will apply if any special wall mounting brackets or posts need to be engineered to suit a particular application – see pictures D & E
Louvre Roof- Fixing & Footings
6 TECHNICAL CATALOGUE The producer reserves the right to intoduce product changes at any time without prior notice
B A
maximum projection 7000mm
front back
Side view
Detail A
200
25
Detail A Detail B
200
50
15
200
50
15
C
maximum width max 4185mm
motor
heig
ht 270
0mm
3058
15
30
Solid Sunbreaker System
6 TECHNICAL CATALOGUE The producer reserves the right to intoduce product changes at any time without prior notice
B A
maximum projection 7000mm
front back
Side view
Detail A
200
25
Detail A Detail B
200
50
15
200
50
15
C
maximum width max 4185mm
motor
heig
ht 270
0mm
3058
15
30
Solid Sunbreaker System
1.
Wall Bracket - Mounting options:
1. 2. 3.6 TECHNICAL CATALOGUE The producer reserves the right to intoduce product changes at any time without prior notice
B A
maximum projection 7000mm
front back
Side view
Detail A
200
25
Detail A Detail B
200
50
15
200
50
15
C
maximum width max 4185mm
motor
heig
ht 270
0mm
3058
15
30
Solid Sunbreaker System
Projection Beam
Fixing Bolts
Wall BracketGutter
6 TECHNICAL CATALOGUE The producer reserves the right to intoduce product changes at any time without prior notice
B A
maximum projection 7000mm
front back
Side view
Detail A
200
25
Detail A Detail B
200
50
15
200
50
15
C
maximum width max 4185mm
motor
heig
ht 270
0mm
3058
1530
Solid Sunbreaker System
6 TECHNICAL CATALOGUE The producer reserves the right to intoduce product changes at any time without prior notice
B A
maximum projection 7000mm
front back
Side view
Detail A
200
25
Detail A Detail B
200
50
15
200
50
15
C
maximum width max 4185mm
motor
heig
ht 270
0mm
3058
15
30
Solid Sunbreaker System
C
D E
Sec. : Louvre RoofDate : Aug 2018
ISSU
E: L
R-04
-001
SPEC
IFIC
ATIO
NS
.
www.window-treatments.co.nz
Colour Options
Standard Colours: o Gun Metal o PerlaNote: - It is possible to have a mix of colours on a Louvre Roof. Example: Posts, cross beams, projection beams and
gutters in Perla and the louvres in Gun Metal. There is no surcharge with a mix of standard colours.- External durable powder coating system with 60-100 micrometers thickness of coating (Standard PN-EN ISO
2360).
Special (non standard) Colours: Available with a surcharge of 20% with an extra 12 working days lead time.
Louvre Roof- Colour Options & Motorisation
Motorisation
• All Louvre Roofs are motorised with a blank 240v Elero Picolla XL (Italian) Stainless steel motor (Manual control is not available)
• Motor can be installed on either projection side of the louvre roof but the selected side must be stated on the order.
• Motor is installed on the top of the projection beam• Control options are: o Somfy Remote with Receiver o Hard wired to a wall switch• Electricity supply to the louvre Roof is by a registered Electrician provided by the customer
10 TECHNICAL CATALOGUE The producer reserves the right to intoduce product changes at any time without prior notice
220
200
75Ø8.2
45
805030
Drive - Picollo XL motor
Drive rod bracket
Motor bracket
66.6
2
48
65
blade end cap (drive)
blade end cap(bearing)
Solid Sunbreaker System
10 TECHNICAL CATALOGUE The producer reserves the right to intoduce product changes at any time without prior notice
220
200
75
Ø8.2
45
805030
Drive - Picollo XL motor
Drive rod bracket
Motor bracket
66.6
2
48
65
blade end cap (drive)
blade end cap(bearing)
Solid Sunbreaker System
10 TECHNICAL CATALOGUE The producer reserves the right to intoduce product changes at any time without prior notice
220
200
75
Ø8.2
45
805030
Drive - Picollo XL motor
Drive rod bracket
Motor bracket
66.6
2
48
65
blade end cap (drive)
blade end cap(bearing)
Solid Sunbreaker System
Sec. : Louvre RoofDate : Aug 2018
ISSU
E: L
R-05
-001
SPEC
IFIC
ATIO
NS
.
www.window-treatments.co.nz
Securo® Options
Motorised Securo’s in both PVC and Screen fabric can be installed on all four sides of the louvre roof. Power cables for the Securo’s can be hidden from view by feeding the cables through the hollow projection beams and hollow cross beams (not available with Crank operated Securo’s®).
Louvre Roof- Securo® & Securo® Side Roll
Securo®
Securo® Side Roll
Securo Side Roll (manual system) with Insect Screen mesh can be installed on all four sides of the louvre roof. As the maximum width possible on a Securo Side Roll is 4000mm, if the projection beams are longer than 4000mm, the Securo Side Roll would need to be split into two blinds with each side of the blind sliding away from the middle. Example: For a projection of 5000mm, the opening would have two Securo Side Rolls each 2500mm wide.
Sec. : Louvre RoofDate : Aug 2018
ISSU
E: L
R-05
-001
SPEC
IFIC
ATIO
NS
.
www.window-treatments.co.nz
Inclement Weather Operation
The louvre roof is weather proof but is not guaranteed to be water tight in adverse or storm conditions. The louvres must be opened when wind exceeds 65km/hr and/or when snowing.
Care & Maintenance
The effects of ultra violet light, pollution, dirt, grime and salt deposits can all accumulate on the powder coated surface over time. To extend the effective life of powder coating and protect any warranty requirements that may exist, a very simple regular maintenance program should be implemented for the removal of any residues.
As a general rule, cleaning should take place every six months. However, in areas where pollutants are more prevalent, especially in coastal or industrial regions, a cleaning program should be carried out on a more frequent basis (i.e. every three months).
To clean your powder coated surface:1. Carefully remove any loose deposits with a wet sponge2. Use a soft brush (non-abrasive) or cloth, and a mild household detergent solution to remove dust, salt and other deposits.3. Rinse off with fresh waterDetergents that recommend the use of gloves when handling should be avoided as this is a good indication that the detergent is harsh and therefore, unsuitable for cleaning your powder coating.
Although some strong solvents are recommended for removing sealants or other building residues, these may be harmful to the extended life of the powder coated surface and should be avoided as the damage may not be visibly immediately and may take up to twelve months to appear. Methylated Spirits, Turpentine or White Spirits may be used safely to remove paint splashes, sealants, or other residue as necessary.
It is important to regularly clean out the gutters. In addition, as the pole/posts carry the water from the gutters to the ground, the base of the pole/posts need to be cleared of debris on a regular basis. We recommend this work is done every month during the Autumn season and every 3-4 months throughout the rest of the year.
Warranty
Our louvre roof carries our standard three-year warranty*. This warranty covers the cost of repair or to make good of any defects in materials or workmanship. *Refer to our Guarantee & Product Care Guide for full detailsNote: This warranty will not apply if the louvre roof has not been regularly cleaned and maintained or operated in a way that it was not intended. This warranty will also not apply if the louvres are left in a closed position in winds exceeding 65km/hr or when snowing.