maruti steel fab (1)
Post on 22-Jul-2015
149 Views
Preview:
TRANSCRIPT
www.marutisteelfab.com
FORMWORK IN PLYWOOD SHUTTERING PLA TESLAB & COLUMN FORMS
LAUNCHING GANTRY
I-GIRDER,
PLATE GIRDER / STEEL GIRDER
STRUCTURAL WORK
MSF PRODUCTS TRUSTED FOR GENERATION
In the same Tunnel Gantry after Completion, removed Side Shutter and fixed Crown Shutter thus reducing cost of Tunnel Formwork
top related