mc wap molten-carbonate fuel cells for waterborne application project coordinator: cetena s.p.a....
Post on 02-Jan-2016
223 Views
Preview:
TRANSCRIPT
MMolten-carbonate fuel CCells for WWaterborne APAPplication
www.mc-wap.cetena.it
Project coordinator: CETENA S.p.A. – Italian Ship Research Centrewww.cetena.it
5 OEMs
Programme: FP6 Joint Call 2004-Hydrogen-1 Coordinator: CETENATotal Budget: 17,2 M€EU funding: 9,9 M€Partners: 16 + 1 additionalCountries: 7Duration: 5 years (2005 to 2010)
3 Research centres
1 Shipyard
1 Engineering consultant
5 Universities 1 Class society
The Consortium
MC-WAP at a GlanceMC-WAP at a Glance
Improvement of MC Fuel Cells and Fuel Processing Unit performance and relevant components, to allow an efficient, reliable and safe use on board
Best integration between the MC Fuel Cells and the Fuel Processor
Design, construction, installation on board and testing of a 150 kWe Auxiliary Power Unit (APU)
Safe, efficient and reliable operation and integration of the APU prototype
Concept design of new merchant/passenger ships lay-out. The aim is to partially replace the traditional Diesel generators with multi-MW Fuel Cells power plants with diesel reforming units
Project ObjectivesProject Objectives
The main objective of MC-WAP project is to give to the maritime industry a benchmarking based on real-life and real-size tests on board of MCFC performance in terms of efficiency, volumes / weight and costs to be comparable to existing power units, providing a timeline for possible future availability of the fuel cells as a commercial product to be installed on board.
Major MilestonesMajor Milestones
2009 2010
Year 1 Year 2 Year 3 Year 4 Year 5
2005 2007 2008
Selection of diesel oil for system development
Requirements definition and concept design of 500 kW APU
Long-term test on MCFC-NG plant completed
• Desulphurization unit upgraded• FP unit components upgraded• MCFC unit upgraded
Final design of 150 kW APU
APU installation
APU testing phase completed
2006
• APU for marine applications
• Development of reformer systems
• Fuel Cell system integration
• “Full scale” operational demonstration
MC-WAP project HIGHLIGHTSMC-WAP project HIGHLIGHTS
Fuel Processing UnitSulphur sequestration (down to 0,1 ppm)Porous burnerFuel dosing and vaporizationATR catalyst…
MCFCTests on MCFC-NG plant Small scale bench tests Auxiliaries
Requirements definition
Electrical power profiles
EnvironmentalConditions
Ship motions & vibrations
Diesel oil
R&DR&D Components enhancement
Endurance/Performance
testsBoP and integration on-boardBoP and integration on-board
Design, construction and installation on boardof the APU
Design, construction and installation on boardof the APU
Prototype DevelopmentPrototype Development
• Valuable first experience with application and test of high power (150 kW) FC APU prototype on board ships
• A stepping stone in the difficult way to the expansion of FC Multi-MW systems in maritime sector
• A group of European Companies will achieve knowledge and experience like no other in FC application on large merchant and passenger ships
• An Italian-born technological platform, developed in the MCFC-NG project, has decided to open itself to a number of European partners
• MC-WAP wants to acquire leading position in world’s run to fuel cells marinization
Project PerspectivesProject Perspectives
• SotA in MC-FC rules and in Fuel Cells rules in marine applications• SotA in desulphurisation and fuel reforming in marine applications• Set of data concerning power profiles expected on board and needs by ships’
auxiliary plants• Set of data concerning expected operating conditions on board for the Fuel Cells
(motions, vibrations and environmental conditions)• Selection of Diesel Oil for the APU development• Partners agreement on preliminary APU architecture, including FC and FPM
schemes• Extensive tests on existing on-shore 500kW Research Plant in Marmara research
centre (Turkey) and data analysis• Design and optimisation activities for FCM and FPM• Remarkable volume and weight savings• Final design of target MCFC APU power and architecture• Identification of sites for FCM and FPM development• Contacts and project promotion for the selection of the ship on which to install
and test the APU – solution identified for a hired ship, interest expressed by one important ship-owner
• Dissemination/Training activities
MC-WAP Results after 4 years in briefMC-WAP Results after 4 years in brief
FCM FPM
Exhaust
Fuel
Syngas Process Fuel
MTG
kWel
Fuel to MTG
kWel
SteamGenerator
kWel
150 kWel
Steam
MC-WAP Basic SchemeMC-WAP Basic Scheme
VideoVideo
MC-WAP paper leaflet printed in hundreds of copies to be distributed to interested contacts during exhibitions and meetings
LeafletLeaflet
MC-WAP video produced with professional quality to be distributed before the end of the project
Articles & Articles & PublicationsPublicationsMC-WAP partners will select a number of
specialized magazines and newspapers
where MC-WAP Project will have the
opportunity to publish and inform about
its results
Public AwarenessPublic Awareness
NewsletterNewsletterMC-WAP periodic newsletter to be sent in electronic format to a selected industrial and research mailing list
For more information, please have a look at:For more information, please have a look at:
Project websiteProject websitehttp://www.mc-wap.cetena.ithttp://www.mc-wap.cetena.it
Project emailProject emailmc-wap@cetena.itmc-wap@cetena.it
Contacts:Contacts:Marco Schembri - CETENA S.p.A.Marco Schembri - CETENA S.p.A.
marco.schembri@cetena.itmarco.schembri@cetena.it