October 26 to 31 2015 Technical/Design Meetings - Engineer's Office, Lahore

Date Start Time Meeting Parties Participants from Engineer Remarks

26

9:0011:00 Technical/Design Lot 4.1 and 4.2 ENG, PES Maurizio, Sardar, Santos, Sinh, PES representative, Georg Internal meeting13:3015:30

27

9:00 Technical/Design Lot 4.1 and 4.2 ENG, PES Maurizio, Sardar, Santos, Sinh, PES representative, Georg Internal meeting11:0013:3015:30

28

9:00 Technical/Design Lot 4.1 and 4.2 ENG, WAP Maurizio, Sardar, Santos, Sinh, Georg Mr. Georg to invite WAP personally11:0013:30 Technical/Design Lot 4.1 and 4.2 ENG, NET, WAP Maurizio, Sardar, Santos, Sinh, Georg Reescheduled from November,30 (Mr. Georg to invite NET personally)15:30

29

9:00Technical/Design Interface 3.1/3.2 ENG, AND, SAM, WAP Wazir, Santos, Sinh, GeorgTechnical/Design Lot 4.1 and 4.2 ENG, NET, WAP Maurizio, Sardar

11:0013:3015:30

30

9:00Technical/Design Interface 3.1/3.2 ENG, AND, SAM, WAP Wazir, Santos, Sinh, GeorgTechnical/Design Lot 4.1 and 4.2 ENG, NET, WAP Maurizio, Sardar

11:0013:3015:30

31

9:0011:0013:3015:30

Meetings can be done in parallel. Mr. Santos and Mr. Sinh should stay on the Interface 3.1/3.2 meeting and participate on the Lot 41/4.2 meeting if called

Meetings can be done in parallel. Mr. Santos and Mr. Sinh should stay on the Interface 3.1/3.2 meeting and participate on the Lot 41/4.2 meeting if called