method statement for butt fusion welding 13apr14
Post on 25-Nov-2015
641 Views
Preview:
DESCRIPTION
Detail of HDPE Wielding. This covers only Butt Fusion. it includes manpower required, the type of machine used, a very detailed process of butt fusion including precaution that need to be taken. It also contain technical manual of the machine itself.
top related