BT Tan YKK AP FACADE PTE. LTD.

New York April 21, 2016

Facade Retrofitting Method with an inverted drainage system

2

High Street Centre Singapore

Built: 1974 Usage: Commercial Office Floors: 31 (7 story podium and 24

story tower) Height: 400 ft. (122m) Owner: Management Corporation

Strata Title

Surrounded by notable government buildings including the Parliament House and the High Court.

3

Work Challenges: •  Business as usual for existing tenants •  Safety of workers, tenants and the public •  Minimum disruption and noise •  Full weather-tightness during construction

Before

During

1.  Remove existing tower facade entirely. 2.  Install new Unitized Curtain Wall System. 3.  Extend roof crown 70 ft height.

Project Scope

4

A Retrofitting Method Solution

5

Comparison: Unitized Curtain Wall Drainage Systems

INVERTED Splice Plate

Conventional Unitized Bottom-up System

Conventional Splice Plate

Although a totally opposite installation method, the inverted splice plate performs and functions as a conventional system.

Innovative Unitized Top-Down System

6

Top-Down Bottom-up

Advantages of the Top-Down vs. Bottom Up Retrofit Method

7

4 floors at each period of time

Duration affecting tenant: 21 days

3 days

3 days

3 days

12 days 3 days

3 days

3 days

3 days

12 days

9 days

Duration affecting tenant: 33 days

6 floors at each period of time

1

2

3

4

5

6

1

2

3

4

Activity cycle turnaround time

Day

wor

k N

ight

wor

k Bottom-Up Method vs. Top-Down Method

Day w

ork N

ight work

Shorter

8

1

2

3

4 1

2

3

4

5

6

Less exposure to weather

Day

wor

k N

ight

wor

k Bottom-Up Method vs. Top-Down Method

Day w

ork N

ight work

Additional temporary rain screen barrier

9

1

2

3

4 1

2

3

4

5

6

Reduced risk of falling debris

Demolition BELOW

new cladding

Demolition ABOVE

new cladding

RISK!

Day

wor

k N

ight

wor

k Bottom-Up Method vs. Top-Down Method

Day w

ork N

ight work

10

1

2

3

4 1

2

3

4

5

6

TIME Shorter installation turn around time

Less exposure to weather

COST

SAFETY

Less temporary protection and cleaning

Additional safety

platform

Additional heavy duty protection

screen

Additional temporary rain screen

barrier

Day

wor

k N

ight

wor

k Bottom-Up Method vs. Top-Down Method

Day w

ork N

ight work

Reduced risk of falling debris

11

Mth 4 Mth 5 Mth 6 Mth 7 Mth 8

Mth 9 Mth 10 Mth 11

Mth 1

TOP-DOWN METHOD: Monthly Progress Pictures

Mth 14

12

Before and After: Internal

13

•  Aged building - Precondition survey ü  No proper as built record ü  Structure strength

•  Occupied building - Operational constraints ü  Working hours ü  Noise ü  Safety ü  Security ü  Interfacing finishes

•  Facade specialist - General contractor role ü  Liaison with authority ü  Total project management

Contractor Assumes All

Risk!

Why Facade Retrofitting Method Matters:

14

www.ykkapfacade.com

tanbt@ykkapfacade.com

YKK AP FACADE PTE. LTD. Headquartered in Singapore, YKK AP FACADE Pte. Ltd. specializes in architectural building facade projects throughout Asia.