MIDDLE SCHOOL RENOVATION

WEEKLY PROGRESSJULY 5 THRU JULY 9

7/6/10 NEW GYM WALL BEING

CONSTRUCTED

7/6/101ST FLOOR SOUTH SIDE REMOVAL OF

OLD STUDENT ENTRANCE DOORS

7/6/10A-POD 1ST FLOOR NORTH SIDE

7/6/10F-POD 2ND FLOOR SOUTH SIDE

DRYWALL IN PROGRESS

7/6/10F-POD 2ND FLOOR SOUTH SIDE

7/6/10D-POD 2ND FLOOR EAST SIDE INSULATING OF

WALLS

7/6/10

NEW LIBRARY ENTRANCE ON SOUTH SIDE

STEPS LEADING TO LIBRARY 2ND FLOOR

WERE REMOVED

7/6/10

REMOVAL OF 2ND FLOOR ENTRANCE LANDING IN LIBRARY

NEW LIBRARY ENTRANCE ON NORTH SIDE

7/6/10REMOVAL OF LIBRARY 2ND

FLOOR ENTRANCES

7/6/10OFFICE AREA

7/6/10FOOD STORAGE / CUSTODIAL

STORAGE ROOM WALLS REMOVED

7/7/10D-POD 2ND FLOOR EAST SIDE

INSULATING OF WALLS

7/7/10OLD LIBRARY ENTRANCE

SOUTH SIDE WALLS BLOCKED

NEW LIBRARY ENTRANCE SOUTH SIDE IN

PROGRESS

7/7/10LIBRARY 2ND FLOOR ENTRANCE &

STEPS WERE REMOVED

7/7/10OLD PIT FILLED WITH STONE TO

PREPARE FOR NEW STORAGE AREA

7/7/10NEW STAIR RAILS INSTALLED

7/8/10C-POD 1ST FLOOR SOUTH SIDE ROOMS ARE BEING

PAINTED

7/8/10OPENINGS AT EACH END OF HALL FOR NEW RESTROOMS

NEAR GYM

7/8/10E-POD 2ND FLOOR NORTH SIDE WALL

INSULATION STARTED

7/8/10

LIBRARY NEW ENTRANCE SOUTH SIDE

LIBRARY NEW ENTRANCE NORTH SIDE

7/8/10LIBRARY NORTH SIDE OLD ENTRANCE ENCLOSED

7/8/10A-POD 1ST FLOOR NORTH SIDE