mission planning
Post on 30-Dec-2015
27 Views
Preview:
DESCRIPTION
TRANSCRIPT
عملیات: Task or OBJ:
هدف و وظیفهLocations:موقعیت
ها
Asset / Elementو قطعهشعبات
Time / Phaseو وقتمرحله
Execution: Action or Resourceاجرااتضروری
Line of Effort 1: Information & Line of Effort 2: Protect the Population & Line of Effort 3: Enable ANSF
بخاطرتقویه کوشش و مردم حفاظت کوشش و معلومات کوششافغان } ملی امنیتی 1Identify and meet w/Mullahs ofنیروهای
4 x mosques in Pech Valley (see Area Assessment
at Mosques (see coord. in area assmnt
Kandak, BDE ANA and OCC-P involvement
Before operations • Plan transport and security for RCA• Task the local Kandakj for security• Organize key leaders/ mullahs
Conduct key leader Shura: engage key leaders; engage populace
Area of OPN Monagai DC
GEN Mohib/LTC Quadrodin/ & kandak
During operations (D-Day)
• contacting key leaders• plan Shura • coordinate with kandak for local participationLine of Effort 4:Support to Government Capacity/Credibility & Line of Effort 5: Support Socio-Economic Development
بخاطرحمایت کوشش و دولت واعتبار ظرفیت حمایه بخاطر کوشش{ واجتماعی اقتصادی رشد از 4Implement Poster and Handbillکردن
disseminationArea of OPN; plan in Gamberi
RCA and MISO (CF); Kandak
Leaflets – beforeHB – during
Identify the message; design or select products ; work with MISO; coordinate with PAO
Implement Radio messages to reach the Pech Valley
Watapur RIAB; other RIAB
RCA / MISO / PAO Before, During and After
Record the message or develop written message; coordinate msg to reach RIABs
Line of Effort 6: Neutralize Negative Influence
منفی } تاثیرات ساختن خنثی بخاطر 6کوششPromote/ introduce Guardians of Peace and Reintegration to Pech Valley population
Pech Valley AO • Introduce Reintegration Program to district leadership• Hand out Guardians of Peace products
School Supplies, Radios dissemination
Pech Valley AO Through RCA – to 2BDE and 2/2 kandak
TBD
MISSION PLANNING وظیفه پالنگذاریOperation:
UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO
top related