mnems4448paed-2cl150 magnum ms4448pae … diagram dual...magnum ms4448pae dual inverters with 2...
Post on 08-May-2018
228 Views
Preview:
TRANSCRIPT
MAGNUM MS4448PAE DUAL INVERTERS WITH 2 CLASSIC 150'S
ON
OFF
ON
OFF
ON
OFF
ON
OFF O
N
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
LOADS 120 V
Utility Main panelor generator.
120/240VAC
Dashed Lines indicateWiring done by customer
System must be grounded per NEC specifications
ON
OFF
ON
OFF
5050
ON
OFF
ON
OFF
3030
ON
OFF
ON
OFF
3030
ON
OFF
ON
OFF
5050
INP
UT
BR
EAK
ERM
NEA
C3
0Q
ZD-2
P
INP
UT
BR
EAK
ERM
NEA
30
-2P
OU
TPU
T B
REA
KER
MN
EAC
50
-2P
OU
TPU
T B
REA
KER
MN
EAC
50
-2P
ON
LO
WER
DIN
RA
IL
#8 #8#8#8
#8#8
#8#8
#8
#8
#8
#8
AC HOT OUT L2
AC HOT IN L2
NEUTRAL
GROUND
AC HOT OUT L1
AC HOT IN L1
GROUND
ON
OFF
ON
OFF
ON
OFF
ON
OFF
60 60
NO
RM
AL
BYP
ASS
BYP
ASS
BR
EAK
ER
OU
TPU
T B
REA
KER
60 60
#8
#8
#6
#6
#6 #6#6
#6#8 #8
#8 #8
#8
#8
#8
MNEMS4448PAED-2CL150RevA – 12/22/2013
Page 1
Customer should remove this wire if this is a grid connected home or if the AC neutral to ground bond is already made in the electrical
system. If you are unsure please consult with your electrician.
175ON
OFF
175ON
OFF
GROUND
PV1 Pos In
BATT PLUS BUS
BATTERY NEGATIVE
GROUND
BATTERY NEGATIVE
BATT PLUS BUS
PV2 Pos In
MASTER SLAVE
70
ON
ON
90
70
ON
ON
90
CLASSIC 150 CLASSIC 150
PV
INP
UT
CH
AR
GE C
ON
TRO
LLER O
UT
CH
AR
GE C
ON
TRO
LLER O
UT
PV
INP
UT
INV
ERTER
MA
IN B
REA
KER
INV
ERTER
MA
IN B
REA
KER
DC Wiring done by MidNite SolarDashed Lines
indicates Field wiring done by Customer
PV Array 1
PV Array 2
48 Volt Customer supplied
battery bank
MNEMS4448PAED-2CL150RevA – 12/22/2013
Page 2
All Midnite installed Battery cables are 2/0.
Customer should use minimum of 4/0 cable to the
battery bank
Communications cabling, BTS Cables, Surge
Protection ETC
SELECT
TECHAGS METER SETUPSHOREINVERTER
CHARGER
INV
CHG
FAULT
PWR
ON/OFF
ON/OFF
STACK
MAGNUM RTR
NETWORK
GROUND
PV 1 Pos In
BATT PLUS BUS
BATTERY NEGATIVE
GROUND
BATTERY NEGATIVE
BATT PLUS BUS
PV 2 Pos In
MAGNUM BMK
ON
OFF
1A
BTS
MASTER SLAVE
BTS
CLASSIC 150 CLASSIC 150
BM
K B
REA
KER
AC HOT OUT L2
AC HOT OUT L1 NEUTRAL
AC HOT IN L2
AC HOT IN L1
SPD 300
SPD 300
SPD 300
SPD 300
MNEMS4448PAED-2CL150RevA – 12/22/2013
Page 3
Build Notes
1- Use 2 Classic 150's2- Use 4 SPD300's3- Requires 2 an MNE175STM-240 E-Panels4- Requires MidNite Back Plate5- Use 2 MNEDC90 Breakers for the Battery side 1 for each Classic. 6- Use 2 MNEDC70 Breakers for the PV side 1 for each Classic.7- Put Each Classics breakers in that E-panel above the respective Classic8- Install and wire the Magnum BMK and power it through a MNEPV2 Breaker9- Put PV breaker towards the Top/Front of the E-Panel10-Use MNEDC175s for the battery Main Breakers11- Wire the WBjr to Aux2 Positive in Classic 1 (Left side Classic)12- Make sure to label the PV inputs 1 and 2. Classic 1 is on the left13- Install Follow Me Cables and Classic BTS14- Install Magnum Energy BTS 15- Use #4 wire from Battery Main breaker to the Battery Positive bus bar16- All AC wiring to be #8 except Bypass wiring that is #6. 17- ByPass breakers to be 60 amp 2 pole18- Input Breakers are 30 amp 2 pole, Output breakers are 50 amp 2 pole.19- Make sure to set the Magnum back to factory default battery chemistry.20- Program the classics for Follow-Me, BTS Slave/Master, Nominal Battery voltage etc.21- Follow proper test procedures to confirm Sunny Island and Classic functionality22- Send all Pages to the Customer.
Signed by Builder___________________________________________
Page 4
MNEMS4448PAED-2CL150RevA – 12/22/2013
top related