modular building systems international (mbsi) modular buildings and construction
Post on 01-Nov-2014
851 Views
Preview:
DESCRIPTION
TRANSCRIPT
Key Contact
Patricia Berk - President & Owner of MBSI• Patricia Berk incorporated MBSI in April of 2000.
• MBSI has become the leading environmentally consciousmodular company in the State of Florida.
• Prior to MBSI, Ms. Berk held positions as Executive VicePresident and was a shareholder of ASAP Office Buildings
in Orlando, Florida, 1996-1999.• Branch Manager for the Central Florida branch of Space
Master International, 1993-1996.• Account Executive for Diamond Engineered Space, 1989-
1993.
• Phone 888-320-8050GUATEMALA HOUSING REVITALIZATION
About MBSI
• MBSI is a solely owned corporation based in theState of Florida, United States.
• MBSI is a certified general contracting firm,specializing in modular construction with Turn KeyServices.
• The Company was established April 10, 2000 withit’s primary business in the South East, USA.
• MBSI has established themselves in the alternativebuilding marketplace as a leader with energy
efficient and environmentally friendly buildings.
GUATEMALA HOUSING REVITALIZATION
MBSI’s Mission
• To exceed client expectations throughhonest communication, quality construction
and sensitivity for the environment, whilefostering a safe, creative and ethicalworkplace that provides unlimitedopportunities.
• To be major contributor to the developmentand quality of modular construction whileproviding impeccable customer service and
communication.GUATEMALA HOUSING REVITALIZATION
MBSI Business Philosophy
• To attain successful long-term relationshipsthrough truthful and honest business
procedures.
- Utilize proven manufacturers, qualitymaterials, and provide cost effective
construction.
- Committed to meeting all clientrequirements, for total customer satisfaction.
GUATEMALA HOUSING REVITALIZATION
Environmental Focus• Provider of the first platinum-levelLeadership, Energy and Environmental
Design (LEED) Certified modular school inthe State of Florida
• Introduced green building practices in allaspects of MBSI as standard practices.
• We use use certified green products in ourmodular buildings in order to minimize offgassing and conserve energy
GUATEMALA HOUSING REVITALIZATION
Market Sectors• Commercial Housing
- Group treatment homes, Dormitories, Military Housing,Worker Camps
• Schools- Charter, Public and Private, Gymnasiums, Classrooms,
Auditoriums• Medical
- CT/MRI Buildings, X-Ray Storage, AdministrativeBuildings, Doctors Offices, Hospitals, Laboratories
• Churches/Places of Worship - Daycare & Child Care, Offices, Fellowship Halls,Sanctuary's, Business Offices
• Government- Administrative Offices, dormitories, field
stations,Grelocatable medical centers
Types of Products Provided
• Factory Built Modular Structures
• Pre-engineered Steel Buildings
• Turn Key Site Services
• Building Accessories
GUATEMALA HOUSING REVITALIZATION
Recent Completed Projects
• Shands Hospital MRI/CT Scan ModularFacility
• Learning Gate Community School, PlatinumLevel LEED Certified Hillsboro CountyPublic Charter School.
www.learninggate.org• Terrace Community Charter Middle School-Hillsboro County Public Charter School
• 50,000 sq. ft. classroom space EmbryRiddle Aeronautical University
GUATEMALA HOUSING REVITALIZATION
Jacksonville Medical Center• MRI/CT can, type II non
combustible modularmedical facility.
• 5000 Square feet.• Contracted November2007• Finished March 2008
To know about MBSI’s other medical buildings and projects, visit http://mbsi.com/building-types/medical.html
Learning Gate School
• 9 Classrooms, 8000Sq. Feet
• First Platinum LEEDCertified ModularSchool in U.S.• Receiving National
Attention• www.learninggate.org
To know about MBSI’s other educational buildings and projects,visit http://mbsi.com/building-types/education.html
Terrace CommunityCharter School
• Built in 2007• Two Buildingstotaling 36,000 sq.feet.• Administrative
Offices• Gymnasium
• 30 Classrooms• Cafeteria
An Overview of thePermanent/Relocatable Modular Construction
Engineering & SubmittalsSite Development
Modular ConstructionStaging & Installation
Interior & Exterior FinishesProject Completion
2000 Modular Building Systems Intl.
Design Engineering• Unlimited Design Assistance
• FL Engineered Blueprints
• PE /Architect Coordination
• Local Permitting Administration
Design Site Development
Modular Construction
Staging and Installation Finishout Completion
2000 Modular Building Systems Intl.
Site Development
• Site preparation
• Foundations
• Logistics and receiving for staging
Design Site Development
Modular Construction
Staging and Installation Finishout Completion
2000 Modular Building Systems Intl.
Modular Construction Process• Begin Manufacturing Modules• Quality control/Documentation• State of FL building approval
• Delivery to Site
Design Site Development
Modular Construction
Staging and Installation
2000 Modular Building Systems Intl.
Finishout Completion
Staging & Installation
• Foundation Development prior toDelivery
• Staging on or near existing site• Set-up and installation• Begin on-site finishes
Design Site Development
Modular Construction
GUATEMALA
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Finishout Completion
Begin On Site Finishes• As modular building is installed, on site Interior &
Exterior finishes Begin
• Full Time Construction Management
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
On Site CompletionFinishes
Interior Finishes• Interior finishes are completed
• Full Time Construction Management and Coordination of Interior Contractors
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Interior CompletionFinishes
Finish Out•Exterior finishes completed:
•Exterior siding, sidewalks, canopies, etc
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Exterior CompletionFinishes
Completion• Final walkthrough of building
• Test HVAC, Electrical & Plumbing
• Substantial Completion Signed Off
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Finishout Completion
Project Completed
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Finishout Completion
top related