modular house february 2012 kombine trade company limited 255 pattanakarn 53, suanluang, bangkok...

Post on 29-Mar-2015

218 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Modular House

February 2012KOMBINE TRADE COMPANY LIMITED255 Pattanakarn 53, Suanluang, Bangkok 10250, Thailand | Tel: (66) 2 7224484, (66) 81 9029987

Our Product

mobile home

1. Quality : prefabricated in factory under controlled environments, preventing materials and the craftsmen from being exposed to harsh weather conditions.  

       2. Speed: completed in 2-4 weeks depending on model and deliver to customer 1-

3 days depending on location.

3. Value: generates tremendous savings from factory efficiencies, speed, weather impacts, and more.

Our Target CustomersPerfect suit for customers with limited budget who looking to downsize, new families looking to grow,

those intends to secure land rights, and those stay on rental land with tendency to relocate to other places.

Suit for resort owners who looking to start up business or customers looking for second home

close to the beach.

Suit for middle income customers who love space and private home office.

budget home

resort

space home

4+ Features

+ Response to Local RequirementAttractive exterior designNatural ventilation designMaximize natural lightingLife time non-corrosion structure

++ Health & Environmental FriendlyNon toxic material Noise protectionHeat protection Mosquito-borne diseases preventionTermite prevention

+++ Green ProductSteel structure: recycled material transformed with less energy consumption.Green product: non-asbestos, wood substituteIndoor air quality: designed to protect occupant health, promote comfort and productivity, and enhance the durability of structures.

++++ Cost EffectiveStructural warrantee 10 yearsMaterial grade A warrantee by manufacturer Complete installation within 1 week.

Movable & Re-installable

Standard &Compliance

Structure design complied to “International Building Code 2000”.

Production standard ISO9001:2008

Noncorrosive hot dip galvanized steel lasts for min. 20 years. (ASTM A123).

Warrantee

Main structure 10 years***distance from sea> 50 meter

Roof --- no leakage 5 years

Other furnished material 1 year

budget home

budget home18m2 / 3x6 m2

1 bathroom

SpecificationCOMPONENT MATERIAL (or EQUIVALENT) STANDARD

Structure Galvanized Steel (Hot Dip) ASTM A53/A123

Roof SCG Fiber Cement

Door/window Aluminum/glass

Floor Shera Board / Rubber brick

Internal wall Gypsum

External wall Shera BS 476, ASTM C 1185

Ceiling Gypsum

Painting Acrylic Paint

BathroomWater pipe system/tie in, Sanitary ware : Toiler, sink and shower

ElectricityOptional:Electrical wiring , Control board , switch/plug , lighting

Foundation

Exclude:1. Concrete foundation 2. Pumping 3. Plan lay-out 4. Wiring from power line to control board5. Water pipe from utility line to bathroom6. Septic/waste tank and tie-in pipe to cesspool

Design

Features

Endure to harsh weather conditions.

All round wind flows.

3D

side elevation

blank

resort

resort18m2 / 3x6 m2

1 bathroom

SpecificationCOMPONENT MATERIAL (or EQUIVALENT) STANDARD

Structure Steel with coat hot dip galvanized ASTM A53/A123

Roof Metal Sheet (with PE Foam)

Door/window Aluminum/glass

Floor Shera Board /Laminate

Internal wall SCG Gypsum TIS 219-2524

External wall Shera BS 476, ASTM C

1185

Ceiling SCG Gypsum TIS 219-2524

Painting Acrylic Paint

BathroomWater pipe system/tie in, Sanitary ware : Toiler, sink and shower

ElectricityOptional:Electrical wiring , Control board , switch/plug , lighting

Foundation

Exclude:1. Concrete foundation 2. Pumping 3. Plan lay-out 4. Wiring from power line to control board5. Water pipe from utility line to bathroom6. Septic/waste tank and tie-in pipe to cesspool

design

3D view18m2 / 3x6 m2

1 bathroom

plan view18m2 / 3x6 m2

1 bathroom

T.O.S_+800T.O.S_+3933

side elevation18m2 / 3x6 m2

1 bathroom

side elevation A,B18m2 / 3x6 m2

1 bathroom

side elevation 1,218m2 / 3x6 m2

1 bathroom

blank

space home

SpecificationCOMPONENT MATERIAL (or EQUIVALENT) STANDARD

Structure Steel with coat hot dip galvanized ASTM A53/A123

Roof SCG Fiber Cement TIS 1407-2540

Door/window Aluminum/glass

Floor Shera Board /Laminate

Internal wall SCG Gypsum TIS 219-2524

External wall Shera BS 476, ASTM C

1185

CeilingShera BS 476, ASTM C

1185

Painting Acrylic Paint

BathroomWater pipe system/tie in, Sanitary ware : Toiler, sink and shower

ElectricityOptional:Electrical wiring , Control board , switch/plug , lighting

Foundation

Exclude:1. Concrete foundation 2. Pumping 3. Plan lay-out 4. Wiring from power line to control board5. Water pipe from utility line to bathroom6. Septic/waste tank and tie-in pipe to cesspool

space home36m2 / 6x6 m2

1 bedroom & 1 bathroom

space home36m2 / 6x6 m2

1 bedroom & 1 bathroom

3D view36m2 / 6x6 m2

1 bedroom & 1 bathroom

space home36m2 / 6x6 m2

1 bedroom & 1 bathroom

side elevation36m2 / 6x6 m2

1 bedroom & 1 bathroom

blank

Price & Contact

price

Price exclusion:1. Plan layout2. Logistics, warehouse, crane and handling cost from factory to installation site3. Foundation work include concrete foundation & footing4. Pumping 5. Electrical system inside the house, and wiring from power line to control board6. Water pipe from utility line to bathroom7. Septic/waste tank and tie-in pipe to cesspool8. All permits required to deliver and complete the construction and installation of the house.9. Value added tax (VAT)

MODEL EX-FACTORY PRICE (BAHT) ASSEMBLY & INSTALLATION

Trex budget home 300,000 1-2 weeks

Trex resort 450,000 1-2 weeks

Trex space home 650,000 2-3 weeks

Optional• Electrical system

contact

top related