modular lightweight car park solutions prefab nz · 2019. 9. 24. · 3 parkd’s technology cvbtm...

Post on 25-Sep-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1

Modular Lightweight Car Park Solutions

PREFAB NZFASTER, CHEAPER, SMARTER CAR PARKS

PARKD LIMITED (ASX: PKD)

Australia’s only relocatable, modular multilevel parking solution

Validated, cost competitive technology that allows for off-site fabrication and minimal on-site works and disruption

Scalable, low capital intensity business model with low corporate overheads and a compelling growth strategy

One of very few publicly listed car parking enterprises worldwide

Highly credentialed management and board with significant construction, commercialisation and ASX experience

Revenue generating company entering commercial inflection point at an extremely attractive market capitalisation

22

3

PARKD’s Technology

CVBTM Continuously Voided Beam - Hollowcore

PTP PARKD Transportable Panels - Speedfloor

SpecificationDesign Life: 25 – 100 Years

Fire: 120 mins

Lateral: EQ + Wind

SWDL : 2.7 kN/m2

Height: Up to 6 Levels

Spans: Up to 17m

Floor to Floor Up to 3m

The Parkd System is a marriage between existing construction technology, designed to be assembled in a variety of configurations and meets all Australian safety specifications

The BENEFITS

PARKD’s system is based on fundamental advantages over conventional construction

MODULAR CONSTRUCTION

OFFSITE MANUFACTURE

COST EFFICIENT FLEXIBLE AND MOBILE

ECO-CLEVER

REUSABLE & LIGHTER

4

FAST ONSITE

ASSEMBLY

PERMANENT SYSTEM

PARKD’s system based on fundamental advantages over conventional construction

MODULAR CONSTRUCTION

OFFSITE MANUFACTURE

COST EFFICIENT FLEXIBLE AND MOBILE

ENVIRONMENTALLY CLEVER

REUSABLE & LIGHTER

FAST ONSITE

ASSEMBLY

5

RELOCATABLE SYSTEM

COMMERCIAL DIVERSIFICATION

OWN ANDOPERATECAR PARKS

LEASE CAR PARKS

DELIVER SERVICES

for electric and autonomous car markets

FUTURE

86

PARKD’s PATENTED CVB™ CONTINUOUSLY VOIDED BEAM

• PARKD has the patent in the use of Hollowcore as a beam

• Uses prestressed hollowcore sections

• Typ. Spans of 7.2 - 8.2m, up to 17m with standard sections

• Lighter than an equivalent traditional precast design

7

PTP – PARKD Transportable Panels

8

• Precast Panel

• 90mm concrete slab spanning over cold formed joists

• Composite section

• Conventional reinforcement

• Fibre reinforcement

• Lightweight

PTP – PARKD Transportable Panels

• Modular

• Standard width panels, spans up to 8.2m

• Suits car park geometry

• Quick installation, covers large surface area

• Finished surface, no topping99

PTP – PARKD Transportable Panels

• Strength and serviceability performance data through testing

• Precast panel manufacturing and transportation efficiencies

10

Case Study – City Subaru, Victoria Park

First Transportable Car Park in Australia

Minimized Business Interruption

Challenging site conditions

Construction modelling

11

Audi Centre, Perth

Status: Contracted feasibility

Estimated project value: $4.2m

Area: 2,500m^2 (Approx.)

Number of Bays: 250 Approx.

Structure Type: Permanent Showroom

Project Achievements

•Assembly of PARKD System completed ahead of construction program

•Total project cost demonstrates competitive market position

•Performance of supply chain exercised and proven

•Cost and construction efficiencies benchmarked

•PARKD System Evolution in response to lessons learnt on site

PRE-CONTRACTS AND DESIGN

Mount Waverly, Melbourne

Status: Submitted for Planning Approval

Estimated project value: $3.5m

Area: 5,300m2 (Approx.)

Number of Bays: 184

Structure Type: Permanent

712

Toyota Motor Car Company

Status: Contracted feasibility

Estimated project value: $10m

Structure Type: Permanent/RelocatableProject Achievements

•Assembly of PARKD System completed ahead of construction program

•Total project cost demonstrates competitive market position

•Performance of supply chain exercised and proven

•Cost and construction efficiencies benchmarked

•PARKD System Evolution in response to lessons learnt on site

PRE-CONTRACTS AND DESIGN

Level Crossing Removal Projects

Status: Feasibility

Estimated project value: $Not disclosed

Area: 11,200m^2 (Approx.)

Number of Bays: 400

Structure Type: Temporary

613

OUR BUSINESS UNITS

CAR PARKS

Turnkey delivery

DESIGNCONSULTING

SERVICES

BUILD OWN ANDOPERATECAR PARKS

LEASE CAR PARKS

DELIVER SERVICES

for electric and autonomous car markets

514

PARKING INFRASTRUCTURETransformational car parks for a changing world.

15

15

LEADERSHIP in Parking Solutions

16

• Multi pass opportunities• Premium parking & valet• Security• EV charging• Convenience

Commuter Operation

Community • Centralised residential parking• General storage• Community events• Urban gardens

• Solar collectors• Rainwater harvest• EV & grid battery

Environment

• Uber Air• Autonomous depots• Last km travel• Ride share facilities• Storage

Multi User Flexibility

Federal commitment to spend $650m on infrastructure improvements including commuter parking

State Government commitment to increase the number of multi-level commuter car parks

Planned infrastructure projects impacting on local communities on the increase with a solution desperately required to accommodate workers and commuters

Changing commercial activation of car parks will drive private development and multi-use applications such as:

- Electric Vehicle Charging- Drone Delivery- Child care - Autonomous vehicles

Transfer of public car parks to private groups to meet the demand of private enterprise to delivery energy, convenience and urban planning

NATIONAL COMMUTER PARKING PROJECTS

17

AHEAD of the BOOM in

•$100b spend in the next 10 years

•$650m specifically allocated for commuter car parks

Infrastructure

•11,000 new commuter bays in Victoria

•2,300 new commuter bays in Brisbane

•4,000 new commuter bays in Sydney

•Total projects in excess of $400m

•Forecast increase of 16,500 bays in Brisbane over 10Y

•Planned 2,500 bay increase in Melbourne

•Planned 3,000 bay increase in Perth

•Planned 16,500 bay increase (inc. West Sydney)

Retail

•Proposed 2,000 spaces Port of Melbourne

•Proposed 3,000 spaces Port of Fremantle

1018

top related