SL.NO Description of Item UOMExecuted
Qt .
Coefficient
Ba
Qty. of Cement
Ba s
1 RCC M25 (M3) cum 321.18 7.200 2312
2 PCC M15 (M3) cum 52.84 5.800 306
3 SCREED M20 (M3) cum 46.32 6.480 300
4 Brick Work/M3(1:4) cum 86.50 1.900 164
5 Slurry for Roof water proofing slurry sqm 1000 0.039 39
6 Ancillary Work 410 7 work in ro ress 150
Total cement consumption as per theoretical Bags 3,532 Total cement consumed as per actual Bags 3,740 Total extra cement consumed more than theoretical Bags 58 Balance quantity of cement available Bags 2,420 Total cement received till 31.08.2012 Bags 6,160 Cement wastage in % 1.629%
CEMENT CONSUMPTION STATEMENT 8/17/2013
Name of Work “Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA sys tem at Bhagirathi WTP & Distribu
Agency M/s Larsen & Toubro Ltd
R/A Bill No./CEMENT CONSUMPTION STATEMENT-01
SL.NO Description of Item Unit Unit CC/Cum or Sqm Executed Qty.Qty. of Cement
Ba s
Executed
t .
1 RCC M25 (M3) cum 360Kg/M3 7.20 321.18 2312.50 571.90
2 RCC M30 (M3) cum 360Kg/M3 7.20 0.00 0.003 PCC M15 (M3) cum 290Kg/cum 5.80 52.84 306.47 57.84
4 SCREED M20 (M3) cum 324Kg/M3 6.48 46.32 300.12 109.41
5 Guniting/M3(1:2:2) cum 600Kg/M3 12.00 0.00 0.00 13.20
6 Brick Work/M3(1:4) cum 95Kg/M3 1.90 86.50 164.35 161.50
7 Plasterin /M2(1 4) sqm 8 51K /M2 0 17 4000 00
CEMENT RECONCILATION STATEMENT
(Up to 31.08.2012)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system
at Bhagirathi WTP & Distribution Area.” Delhi.
Aug'12
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 3/54
Name of
PROJECT
Agency
SL.NO Descri tion of Item UOM Executed Coefficient t . of Cement
1 RCC M25 (M3) cum 596.84 7.200 4297
2 PCC M15 (M3) cum 62.84 5.800 364
3 SCREED M20 (M3) cum 257.61 6.480 1669
4 Guniting/M3(1:2:2) cum 83.20 12.000 998
5Brick Work/M3(1:4) cum
176.501.900 335
6 Plastering/M2(1:4) cum 4300.00 0.170 732
7 Dholpur Stone/M2 sqm 100.00 0.306 31
8 Slurry for Roof water proofing slurry sqm 1900 0.039 74
9 work in ro ress 425
Total cement consumption as per theoretical Bags 8,501
Total cement consumed as per actual Bags 9,088
Total extra cement consumed more than theoretical Bags 162
Balance quantity of cement available Bags 1,552
Total cement received till 31.10.2012 Bags 10,640
Cement wastage in % 1.901%
CEMENT CONSUMPTION STATEMENT8/17/2013
CEMENT RECONCILATION STATEMENT
(Up to 31.10.2012)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA
system at Bhagirathi WTP & Distribution Area.” Delhi.
M/s Larsen & Toubro Limited, Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 4/54
Name of
PROJECT
“Design, Construction, Supply, Testing,
Commissionin Trial run O eration and
Agency M s Larsen & Toubro Limited Delhi.
SL.NO Descri tion of Item UOM Executed Coefficient Qt . of Cement
1 RCC M25 (M3) cum 724.72 7.200 5218
2 PCC M15 (M3) cum 67.84 5.800 393
3 SCREED M20 (M3) cum 282.59 6.480 1831
4 Guniting/M3(1:2:2) cum 83.20 12.000 998
5 Brick Work/M3(1:4) cum 186.50 1.900 354
6 Plastering/M2(1:4) cum 4500.00 0.170 766
7 Dholpur Stone/M2 sqm 110.00 0.306 34
8 Tapecrete/M2 sqm 400.00 0.013 5
9 Slurry for Roof water proofing slurry sqm 2200 0.039 86
11 work in ro ress 450
Total cement consumption as per theoretical Bags 9,686
Total cement consumed as per actual Bags 10,318
Total extra cement consumed more than theoretical Bags 182
Balance quantity of cement available Bags 2,602 Total cement received till 30.11.2012 Bags 12,920
Cement wastage in % 1.879%
CEMENT CONSUMPTION STATEMENT
CEMENT RECONCILATION STATEMENT
(Up to 30.11.2012)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 5/54
Name ofPROJECT
“Design, Construction, Supply, Testing,
Commissionin Trial run O eration and
Agency M s Larsen & Toubro Limited Delhi.
SL.NO Descri tion of Item UOM Executed Coefficient Qt . of Cement
1 RCC M25 (M3) cum 858.13 7.200 6179
2 PCC M15 (M3) cum 107.84 5.800 625
3 SCREED M20 (M3) cum 322.59 6.480 2090
4 Guniting/M3(1:2:2) cum 120.00 12.000 1440
5 Brick Work/M3(1:4) cum 236.50 1.900 449
6 Plastering/M2(1:4) cum 5500.00 0.170 936
7 Dholpur Stone/M2 sqm 1110.00 0.306 340
8 Tapecrete/M2 sqm 4900.00 0.013 64
9 Slurry for Roof water proofing slurry sqm 2600 0.039 101
11 work in ro ress 520
Total cement consumption as per theoretical Bags 12,225
Total cement consumed as per actual Bags 12,958
Total extra cement consumed more than theoretical Bags 213
Balance quantity of cement available Bags 1,338 Total cement received till 31.12.2012 Bags 14,296
Cement wastage in % 1.746%
CEMENT CONSUMPTION STATEMENT
CEMENT RECONCILATION STATEMENT
(Up to 31.12.2012)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 6/54
Name of “Design, Construction, Supply, Testing,
A enc M s Larsen & Toubro Limited Delhi.
SL.NO Description of Item UOMExecuted Coefficient Qty. of Cement
RCC M25 (M3) cum 7.200 7297
RCC M30 (M3) cum 7.200 427
3 PCC M15 (M3) cum 155.49 5.800 9024 SCREED M20 (M3) cum 379.83 6.480 2461
5 Guniting/M3(1:2:2) cum 120.00 12.000 1440
6 Brick Work/M3(1:4) cum 344.50 1.900 655
7 Plastering/M2(1:4) sqm 6260.00 0.170 1065
Dholpur Stone/M2 sqm 0.306 529
Tapecrete sqm 0.013 77
10 Slurry for Roof water proofing slurry sqm 3200.00 0.039 125
11 work in ro ress 250
Total cement consumption as per theoretical Bags 14,978
Total cement consumed as per actual Bags 15,504 Total extra cement consumed more than theoretical Bags 276
Balance quantity of cement available Bags 1,132
Total cement received till 31.01.2013 Bags 16,636
Cement wastage in % 1 844%
CEMENT RECONCILATION STATEMENT
(Up to 31.01.2013)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 7/54
Name of
PROJECT
A enc
1 RCC M25 (M3) cum 1087.45 7.200 7830
2 RCC M30 (M3) cum 241.85 7.200 1741
3 PCC M15 (M3) cum 224.92 5.800 1305
4 SCREED M20 (M3) cum 415.12 6.480 2690Guniting/M3(1:2:2) cum 12.000 1440
Brick Work/M3(1:4) cum 1.900 831
Plastering/M2(1:4) sqm 0.170 1321
8 Dholpur Stone/M2 sqm 1870.00 0.306 572
9 Tapecrete sqm 6100.00 0.013 79
10 Slurry for Roof water proofing slurry sqm 4000.00 0.039 156
11 work in ro ress 300
Total cement consumption as per theoretical Bags 17,965
Total cement consumed as per actual Bags 18,564
Total extra cement consumed more than theoretical Bags 299
Balance quantity of cement available Bags 1,112
Total cement received till 28.02.2013 Bags 19,676
Cement wastage in % 1.664%
CEMENT RECONCILATION STATEMENT
(Up to 28.02.2013)“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system
at Bhagirathi WTP & Distribution Area.” Delhi.
M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOMExecuted
Qty.
Coefficient
(Bag)
Qty. of Cement
(Bags)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 9/54
Name of
PROJECT
A enc
1 RCC M25 (M3) cum 1300.45 7.200 9363
2 RCC M30 (M3) cum 433.12 7.200 3118
3 PCC M15 (M3) cum 253.57 5.800 1471
SCREED M20 (M3) cum 6.480 3663Guniting/M3(1:2:2) cum 12.000 1800
6 Brick Work/M3(1:4) cum 487.50 1.900 926
7 Plastering/M2(1:4) sqm 10460.00 0.170 1780
8 Dholpur Stone/M2 sqm 2770.00 0.306 848
9 Tapecrete sqm 6100.00 0.013 79
10 Slurry for Roof water proofing slurry sqm 5200.00 0.039 203
work in ro ress 500
Total cement consumption as per theoretical Bags 23,252
Total cement consumed as per actual Bags 24,184
Total extra cement consumed more than theoretical Bags 432 Balance quantity of cement available Bags 1,922
Total cement received till 30.04.2013 Bags 26,106
Cement wastage in % 1.860%
CEMENT RECONCILATION STATEMENT
(Up to 30.04.2013)“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system at
Bhagirathi WTP & Distribution Area.” Delhi.
M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOMExecuted
Qty.
Coefficient
(Bag)
Qty. of Cement
(Bags)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 10/54
Name of
PROJECT
A enc
1 RCC M25 (M3) cum 1425.35 7.200 10263
2 RCC M30 (M3) cum 458.12 7.200 3298
3 PCC M15 (M3) cum 268.23 5.800 1556
SCREED M20 (M3) cum 6.480 3702Guniting/M3(1:2:2) cum 12.000 1860
6 Brick Work/M3(1:4) cum 517.50 1.900 983
7 Plastering/M2(1:4) sqm 11960.00 0.170 2036
8 Dholpur Stone/M2 sqm 3270.00 0.306 1001
9 Tapecrete sqm 6100.00 0.013 79
10 Slurry for Roof water proofing slurry sqm 5500.00 0.039 215
work in ro ress 325
Total cement consumption as per theoretical Bags 24,992
Total cement consumed as per actual Bags 25,690
Total extra cement consumed more than theoretical Bags 373 Balance quantity of cement available Bags 1,936
Total cement received till 31.05.2013 Bags 27,626
Cement wastage in % 1.494%
CEMENT RECONCILATION STATEMENT
(Up to 31.05.2013)“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system at
Bhagirathi WTP & Distribut ion Area.” Delhi.
M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOMExecuted
Qty.
Coefficient
(Bag)
Qty. of Cement
(Bags)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 11/54
Name of
Agency
RCC M25 (M3) cum 7.200 10908
2 RCC M30 (M3) cum 510.73 7.200 3677
3 PCC M15 (M3) cum 306.04 5.800 1775
SCREED M20 (M3) cum 6.480 37845 Guniting/M3(1:2:2) cum 160.00 12.000 1920
6 Brick Work/M3(1:4) cum 542.50 1.900 1031
7 Plastering/M2(1:4) sqm 13460.00 0.170 2291
Dholpur Stone/M2 sqm 0.306 1160
9 GRANITE FLOORING(1:4) sqm 125.00 0.248 31
10 VITRIFIED FLOORING(1:4) sqm 250.00 0.248 62
Tapecrete sqm 0.013 79
12 Slurry for Roof water proofing slurry sqm 6300.00 0.039 246
13 work in ro ress 200
Total cement consumption as per theoretical Bags 26,965 Total cement consumed as per actual Bags 27,622
Total extra cement consumed more than theoretical Bags 457
Balance quantity of cement available Bags 4
Total cement received till 30.06.2013 Bags 27,626
CEMENT RECONCILATION STATEMENT
(Up to 30.06.2013)“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system at B
WTP & Distribution Area.” Delhi.
M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOMExecuted
Qty.
Coefficient
(Bag)
Qty. of Cement
(Bags)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 12/54
Name of
Agency
RCC M25 (M3) cum 7.200 11628
RCC M30 (M3) cum 7.200 3845
PCC M15 (M3) cum 5.800 2291
4 SCREED M20 (M3) cum 585.00 6.480 3791
5 Guniting/M3(1:2:2) cum 172.60 12.000 2071
6 Brick Work/M3(1:4) cum 558.00 1.900 1060
7 Plastering/M2(1:4) sqm 16080.00 0.170 2737
8 Dholpur Stone/M2 sqm 4242.60 0.306 1298
9 GRANITE FLOORING(1:4) sqm 250.00 0.248 62
10 VITRIFIED FLOORING(1:4) sqm 500.00 0.248 124
11 Tapecrete sqm 6200.00 0.013 81
Slurry for Roof water proofing slurry sqm 0.039 265
86
Total cement consumption as per theoretical Bags 29,253
Total cement consumed as per actual Bags 29,854 Total extra cement consumed more than theoretical Bags 515
Balance quantity of cement available Bags 1,572
Total cement received till 31.07.2013 Bags 31,426
Cement wastage in % 1.761%
CEMENT CONSUMPTION STATEMENT8/17/2013
Name of Work “Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA system at Bhagirathi WT
Agency M/s Larsen & Toubro Ltd
R/A Bill No./CEMENT CONSUMPTION STATEMENT-01
Q f
(Up to 31.07.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years of SCADA syst
Bhagirathi WTP & Distribution Area.” Delhi.M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOM Executed Qty. Coefficient (Bag)Qty. of Cement
(Bags)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 13/54
Name of
PROJECTAgency
1 RCC M25 (M3) cum 1615.00
2 RCC M30 (M3) cum 534.003 PCC M15 (M3) cum 395.00
4 SCREED M20 (M3) cum 585.00
5 Guniting/M3(1:2:2) cum 172.60
6 Brick Work/M3(1:4) cum 558.00
7 Plastering/M2(1:4) sqm 16080.00
8 Slurry for Roof water proofing slurry sqm 12616.00
9 Pre Cast slab cum 22.50
10 Dholpur Stone/M2 sqm 4242.60
11 GRANITE FLOORING(1:4) sqm 250.00
12 VITRIFIED FLOORING(1:4) sqm 500.00
13 Tapecrete sqm 6200.00
14 WIP to be measured
Total cement consumption as per theoretical Bags
Total cement consumed as per actual Bags
Cement consumed for ancilary work 31.07.2013 BagsTotal Cement consumed as on 31.07.2013 Bags
Balance quantity of cement available Bags
Total cement received till 31.07.2013 Bags
CEMENT RECONCILATION STATEMENT
(Up to 31.07.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai
system at Bhagirathi WTP & Distribution Area.” Delhi.M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOM Executed Qty.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 14/54
3 PCC M15 (M3) cum 306
4 SCREED M20 (M3) cum 584
5 Guniting/M3(1:2:2) cum 160
6 Brick Work/M3(1:4) cum 543
7 Plastering/M2(1:4) sqm 13460
8 Slurry for Roof water proofing slurry sqm 11000.00
9 Pre Cast slab cum
10 Dholpur Stone/M2 sqm 3792.00
11 GRANITE FLOORING(1:4) sqm
12 VITRIFIED FLOORING(1:4) sqm
13 Tapecrete sqm 6100.00
14 WIP to be measuredTotal cement consumption as per theoretical Bags
Total cement consumed as per actual Bags
Cement consumed for ancilary work 30.06.2013 Bags
Total Cement consumed as on 30.06.2013 Bags
Balance quantity of cement available Bags
Total cement received till 30.06.2013 Bags
Bags
Cement wastage in %
Name of
PROJECT
Cement wastage in bags
CEMENT RECONCILATION STATEMENT
(Up to 31.05.2013)“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai
system at Bhagirathi WTP & Distribution Area.” Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 15/54
12 VITRIFIED FLOORING(1:4) sqm
13 Tapecrete sqm 6100.00
14 WIP to be measured
Total cement consumption as per theoretical Bags
Total cement consumed as per actual Bags
Cement consumed for ancilary work 31.05.2013 Bags
Total Cement consumed as on 31.05.2013 Bags
Balance quantity of cement available Bags
Total cement received till 31.05.2013 Bags
Bags
Cement wastage in %
Name of
PROJECT
Agency
1 RCC M25 (M3) cum 1300
2 RCC M30 (M3) cum 433
3 PCC M15 (M3) cum 254
SL.NO Description of Item UOM Executed Qty.
Cement wastage in bags
CEMENT RECONCILATION STATEMENT
(Up to 30.04.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai
system at Bhagirathi WTP & Distribution Area.” Delhi.
M/s Larsen & Toubro Limited, Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 16/54
Bags
Cement wastage in %
Name ofPROJECT
Agency
1 RCC M25 (M3) cum 1164
2 RCC M30 (M3) cum 350
3 PCC M15 (M3) cum 247
4 SCREED M20 (M3) cum 553
5 Guniting/M3(1:2:2) cum 148
6 Brick Work/M3(1:4) cum 458
7 Plastering/M2(1:4) sqm 84608 Slurry for Roof water proofing slurry sqm 5000.00
9 Pre Cast slab cum
10 Dholpur Stone/M2 sqm 2270.00
Cement wastage in bags
CEMENT RECONCILATION STATEMENT
(Up to 31.07.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maisystem at Bhagirathi WTP & Distribution Area.” Delhi.
M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOM Executed Qty.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 17/54
Name of
PROJECT
Agency
1 RCC M25 (M3) cum 10872 RCC M30 (M3) cum 242
3 PCC M15 (M3) cum 225
4 SCREED M20 (M3) cum 415
5 Guniting/M3(1:2:2) cum 120
6 Brick Work/M3(1:4) cum 438
7 Plastering/M2(1:4) sqm 7760
8 Slurry for Roof water proofing slurry sqm 4000.00
9 Pre Cast slab cum
10 Dholpur Stone/M2 sqm 1870.00
11 GRANITE FLOORING(1:4) sqm
12 VITRIFIED FLOORING(1:4) sqm
13 Tapecrete sqm 6100.00
14 WIP to be measured
Total cement consumption as per theoretical Bags
Total cement consumed as per actual BagsCement consumed for ancilary work 28.02.2013 Bags
Total Cement consumed as on 28.02.2013 Bags
Balance quantity of cement available Bags
SL.NO Description of Item UOM Executed Qty.
CEMENT RECONCILATION STATEMENT
(Up to 28.02.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai
system at Bhagirathi WTP & Distribution Area.” Delhi.
M/s Larsen & Toubro Limited, Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 18/54
1 RCC M25 (M3) cum 1013.00
2 RCC M30 (M3) cum 59.00
3 PCC M15 (M3) cum 155.00
4 SCREED M20 (M3) cum 380.00
5 Guniting/M3(1:2:2) cum 120.00
6 Brick Work/M3(1:4) cum 345.00
7 Plastering/M2(1:4) sqm 6260.00
8 Slurry for Roof water proofing slurry sqm 3200.00
9 Pre Cast slab cum
10 Dholpur Stone/M2 sqm 1730.0011 GRANITE FLOORING(1:4) sqm
12 VITRIFIED FLOORING(1:4) sqm
13 Tapecrete sqm 5900.00
14 WIP to be measured
Total cement consumption as per theoretical Bags
Total cement consumed as per actual Bags
Cement consumed for ancilary work 31.01.2013 Bags
Total Cement consumed as on 31.01.2013 BagsBalance quantity of cement available Bags
Total cement received till 31.01.2013 Bags
Bags
Cement wastage in %
Cement wastage in bags
CEMENT RECONCILATION STATEMENT
SL.NO Description of Item UOM Executed Qty.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 19/54
8 Slurry for Roof water proofing slurry sqm 2600.00
9 Pre Cast slab cum
10 Dholpur Stone/M2 sqm 1110.00
11 GRANITE FLOORING(1:4) sqm
12 VITRIFIED FLOORING(1:4) sqm
13 Tapecrete sqm 4900.00
14 WIP to be measured
Total cement consumption as per theoretical Bags
Total cement consumed as per actual Bags
Cement consumed for ancilary work 31.12.2012 Bags
Total Cement consumed as on 31.12.2012 Bags
Balance quantity of cement available BagsTotal cement received till 31.12.2012 Bags
Bags
Cement wastage in %
Name of
PROJECT
Agency
Cement wastage in bags
CEMENT RECONCILATION STATEMENT
(Up to 30.11.2012)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai
system at Bhagirathi WTP & Distribution Area.” Delhi.
M/s Larsen & Toubro Limited, Delhi.
SL NO Description of Item UOM Executed Qty
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 20/54
Cement consumed for ancilary work 30.11.2012 Bags
Total Cement consumed as on 30.11.2012 Bags
Balance quantity of cement available Bags
Total cement received till 30.11.2012 Bags
Bags
Cement wastage in %
Name of
PROJECT
Agency
1 RCC M25 (M3) cum 597
2 RCC M30 (M3) cum
3 PCC M15 (M3) cum 63
4 SCREED M20 (M3) cum 258
5 Guniting/M3(1:2:2) cum 836 Brick Work/M3(1:4) cum 177
7 Plastering/M2(1:4) sqm 4300
8 Slurry for Roof water proofing slurry sqm 1900.00
M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOM Executed Qty.
CEMENT RECONCILATION STATEMENT(Up to 31.10.2012)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai
system at Bhagirathi WTP & Distribution Area.” Delhi.
Cement wastage in bags
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 21/54
Name of
PROJECT
Agency
1 RCC M25 (M3) cum 572
2 RCC M30 (M3) cum
3 PCC M15 (M3) cum 58
4 SCREED M20 (M3) cum 109
5 Guniting/M3(1:2:2) cum 13
6 Brick Work/M3(1:4) cum 162
7 Plastering/M2(1:4) sqm 4000
8 Slurry for Roof water proofing slurry sqm 1500
9 Pre Cast slab cum 22.50
10 Dholpur Stone/M2 sqm 4242.60
11 GRANITE FLOORING(1:4) sqm 250.00
12 VITRIFIED FLOORING(1:4) sqm 500.00
13 Tapecrete sqm 6200.00
14 WIP to be measured
Total cement consumption as per theoretical Bags
Total cement consumed as per actual Bags
Cement consumed for ancilary work 30.09.2012 Bags
CEMENT RECONCILATION STATEMENT
(Up to 30.09.2012)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Mai
system at Bhagirathi WTP & Distribution Area.” Delhi.
M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOM Executed Qty.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 22/54
1 RCC M25 (M3) cum 321
2 RCC M30 (M3) cum
3 PCC M15 (M3) cum 53
4 SCREED M20 (M3) cum 46
5 Guniting/M3(1:2:2) cum
6 Brick Work/M3(1:4) cum 87
7 Plastering/M2(1:4) sqm
8 Slurry for Roof water proofing slurry sqm 1000
9 Pre Cast slab cum
10 Dholpur Stone/M2 sqm11 GRANITE FLOORING(1:4) sqm
12 VITRIFIED FLOORING(1:4) sqm
13 Tapecrete sqm
14 WIP to be measured
Total cement consumption as per theoretical Bags
Total cement consumed as per actual Bags
Cement consumed for ancilary work 31.08.2012 Bags
Total Cement consumed as on 31.08.2012 BagsBalance quantity of cement available Bags
Total cement received till 31.08.2012 Bags
Bags
Cement wastage in %
Cement wastage in bags
SL.NO Description of Item UOM Executed Qty.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 24/54
5.800 1775 4
6.480 3784 5
12.000 1920 6
1.900 1031 7
0.170 2291 8
0.039 429 9
8.100 0 10
0.306 1160 11
0.248 0 12
0.248 0 13
0.013 79 Total cem
390 Total cem27055 Total extr
29854 Balance q
31426 Total cem
61670 Cement
4
34,136
2799
4.539%
Name of
Project
ntenance for 10 years of SCADA
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 25/54
0.248 0 Total extr
0.013 79 Balance q
390 Total cem
25128 Cement
29854
31426
61670
1,936
34,136
4726
7.663%
Name of
Project
Agency
SL.NO
1
2
7.200 9363 3
7.200 3118 4
5.800 1471 5
Coefficient (Bag)Qty. of Cement
(Bags)
ntenance for 10 years of SCADA
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 26/54
6513
10.561%
Name ofProject
Agency
SL.NO
1
27.200 8378 3
7.200 2524 4
5.800 1432 5
6.480 3585 6
12.000 1776 7
1.900 869 8
0.170 1440 9
0.039 195 10
8.100 0 11
0.306 695 Total cem
Qty. of Cement
(Bags)
ntenance for 10 years of SCADA
Coefficient (Bag)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 27/54
Name of
Project
Agency
SL.NO
1
2
7.200 7830 37.200 1741 4
5.800 1305 5
6.480 2690 6
12.000 1440 7
1.900 831 8
0.170 1321 9
0.039 156 10
8.100 0 110.306 572 Total cem
0.248 0 Total cem
0.248 0 Total extr
0.013 79 Balance q
390 Total cem
17965 Cement
29854
31426
61670
1,112
Coefficient (Bag)Qty. of Cement
(Bags)
ntenance for 10 years of SCADA
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 28/54
1
2
7.200 7294 3
7.200 425 4
5.800 899 5
6.480 2462 6
12.000 1440 7
1.900 656 8
0.170 1065 9
0.039 125 10
8.100 0 11
0.306 529 Total cem
0.248 0 Total cem
0.248 0 Total extr
0.013 77 Balance q
390 Total cem
14972 Cement
29854
31426
616701,132
34,136
14882
24.132%
Qty. of Cement
(Bags)Coefficient (Bag)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 29/54
0.039 101 10
8.100 0 Total cem
0.306 340 Total cem
0.248 0 Total extr
0.248 0 Balance q
0.013 64 Total cem
390 Cement
12228
29854
31426
61670
1,338
34,136
17626
28.581%
Name of
Project
Agency
SL.NO
1
Qty. of Cement
ntenance for 10 years of SCADA
Coefficient (Bag)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 30/54
31426
61670
2,602
34,136
20164
32.696%
Name of
Project
Agency
SL.NO
1
2
7.200 4297 3
7.200 0 4
5.800 364 5
6.480 1669 6
12.000 998 7
1.900 335 8
0.170 732 9
0.039 74 Total cem
Coefficient (Bag)Qty. of Cement
(Bags)
ntenance for 10 years of SCADA
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 31/54
Name of
Project
Agency
SL.NO
12
7.200 4118 3
7.200 0 4
5.800 335 5
6.480 709 6
12.000 158 7
1.900 307 8
0.170 681 Total cem0.039 59 Total cem
8.100 182 Total extr
0.306 1298 Balance q
0.248 62 Total cem
0.248 124 Cement
0.013 81
390
8114
29854
31426
ntenance for 10 years of SCADA
Coefficient (Bag) Qty. of Cement(Bags)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 32/54
1
2
7.200 2312 3
5.800 0 4
5.800 306 56.480 300 6
12.000 0 7
1.900 164 Total cem
0.170 0 Total cem
0.039 39 Total extr
8.100 0 Balance q
0.306 0 Total cem
0.248 0 Cement
0.248 0
0.013 0
390
3122
29854
31426
616702,420
34,136
26732
43.346%
Coefficient (Bag)Qty. of Cement
(Bags)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 33/54
M/s Larsen & Toubro Limited, Delhi.
Description of Item UOMExecuted
Qty.
Coefficie
nt (Bag)
Qty. of
Cement
(Bags)
RCC M25 (M3) cum 1615 7.200 11628
RCC M30 (M3) cum 534 7.200 3845
PCC M15 (M3) cum 395 5.800 2291
SCREED M20 (M3) cum 585 6.480 3791Guniting/M3(1:2:2) cum 173 12.000 2071
Brick Work/M3(1:4) cum 558 1.900 1060
Plastering/M2(1:4) sqm 16080 0.170 2737
Dholpur Stone/M2 sqm 4243 0.306 1298
GRANITE FLOORING(1:4) sqm 250 0.248 62
VITRIFIED FLOORING(1:4) sqm 500 0.248 124
Tapecrete sqm 6200 0.013 81
Slurry for Roof water proofing slurry sqm 12616 0.039 492work in progress 86
nt consumption as per theoretical Bags 29480
nt consumed as per actual Bags 29854
cement consumed more than theoretical Bags 288
antity of cement available Bags 1,572
nt received till 31.07.2013 Bags 31,426
astage in % 0.978%
CEMENT RECONCILIATION STATEMENT
(Up to 31.07.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and
Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 34/54
SCREED M20 (M3) cum 584 6.480 3784
Guniting/M3(1:2:2) cum 160 12.000 1920
Brick Work/M3(1:4) cum 543 1.900 1031
Plastering/M2(1:4) sqm 13460 0.170 2291
Dholpur Stone/M2 sqm 3792 0.306 1160GRANITE FLOORING(1:4) sqm 125 0.248 31
VITRIFIED FLOORING(1:4) sqm 250 0.248 62
Tapecrete sqm 6100 0.013 79
Slurry for Roof water proofing slurry sqm 11000 0.039 429
work in progress 200
nt consumption as per theoretical Bags 27148
nt consumed as per actual Bags 27622
cement consumed more than theoretical Bags 274
antity of cement available Bags 4
nt received till 30.06.2013 Bags 27,626
astage in % 1.010%
CEMENT RECONCILIATION STATEMENT
(Up to 31.05.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and
Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”
Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 35/54
cement consumed more than theoretical Bags 237
antity of cement available Bags 1,936
nt received till 31.05.2013 Bags 27,626
astage in % 0.942%
M/s Larsen & Toubro Limited, Delhi.
Description of Item UOMExecuted
Qty.
Coefficie
nt (Bag)
Qty. of
Cement
(Bags)
RCC M25 (M3) cum 1300 7.200 9363
RCC M30 (M3) cum 433 7.200 3118
PCC M15 (M3) cum 254 5.800 1471
SCREED M20 (M3) cum 565 6.480 3663
Guniting/M3(1:2:2) cum 150 12.000 1800
CEMENT RECONCILIATION STATEMENT
(Up to 30.04.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and
Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 36/54
M/s Larsen & Toubro Limited, Delhi.
Description of Item UOMExecuted
Qty.
Coefficie
nt (Bag)
Qty. of
Cement
(Bags)
RCC M25 (M3) cum 1164 7.200 8378
RCC M30 (M3) cum 350 7.200 2524PCC M15 (M3) cum 247 5.800 1432
SCREED M20 (M3) cum 553 6.480 3585
Guniting/M3(1:2:2) cum 148 12.000 1776
Brick Work/M3(1:4) cum 458 1.900 869
Plastering/M2(1:4) sqm 8460 0.170 1440
Dholpur Stone/M2 sqm 2270 0.306 695
Tapecrete sqm 6100 0.013 79
Slurry for Roof water proofing slurry sqm 5000 0.039 195
work in progress 550
nt consumption as per theoretical Bags 20973
(Up to 31.03.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation andMaintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”
Delhi.
CEMENT RECONCILIATION STATEMENT
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 37/54
M/s Larsen & Toubro Limited, Delhi.
Description of Item UOMExecuted
Qty.
Coefficie
nt (Bag)
Qty. of
Cement
(Bags)
RCC M25 (M3) cum 1087 7.200 7830
RCC M30 (M3) cum 242 7.200 1741
PCC M15 (M3) cum 225 5.800 1305
SCREED M20 (M3) cum 415 6.480 2690
Guniting/M3(1:2:2) cum 120 12.000 1440
Brick Work/M3(1:4) cum 438 1.900 831
Plastering/M2(1:4) sqm 7760 0.170 1321
Dholpur Stone/M2 sqm 1870 0.306 572
Tapecrete sqm 6100 0.013 79
Slurry for Roof water proofing slurry sqm 4000 0.039 156
work in progress 300 nt consumption as per theoretical Bags 17965
nt consumed as per actual Bags 18564
cement consumed more than theoretical Bags 299
antity of cement available Bags 1,112
nt received till 28.02.2013 Bags 19,676
astage in % 1.664%
CEMENT RECONCILIATION STATEMENT
(Up to 28.02.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and
Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”
Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 38/54
RCC M25 (M3) cum 1013 7.200 7297
RCC M30 (M3) cum 59 7.200 427
PCC M15 (M3) cum 155 5.800 902
SCREED M20 (M3) cum 380 6.480 2461
Guniting/M3(1:2:2) cum 120 12.000 1440Brick Work/M3(1:4) cum 345 1.900 655
Plastering/M2(1:4) sqm 6260 0.170 1065
Dholpur Stone/M2 sqm 1730 0.306 529
Tapecrete sqm 5900 0.013 77
Slurry for Roof water proofing slurry sqm 3200 0.039 125
work in progress 250
nt consumption as per theoretical Bags 14978
nt consumed as per actual Bags 15504
cement consumed more than theoretical Bags 276
antity of cement available Bags 1132
nt received till 31.01.2013 Bags 16636
astage in % 1.844%
CEMENT RECONCILIATION STATEMENT
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 39/54
work in progress 520
nt consumption as per theoretical Bags 12225
nt consumed as per actual Bags 12958
cement consumed more than theoretical Bags 213
antity of cement available Bags 1338 nt received till 31.12.2012 Bags 14296
astage in % 1.746%
M/s Larsen & Toubro Limited, Delhi.
Description of Item UOM ExecutedQty.
Coefficient (Bag)
Qty. of
Cement
(Bags)
RCC M25 (M3) cum 725 7.200 5218
CEMENT RECONCILIATION STATEMENT
(Up to 30.11.2012)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and
Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”
Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 40/54
M/s Larsen & Toubro Limited, Delhi.
Description of Item UOMExecuted
Qty.
Coefficie
nt (Bag)
Qty. of
Cement
(Bags)RCC M25 (M3) cum 597 7.200 4297
PCC M15 (M3) cum 63 5.800 364
SCREED M20 (M3) cum 258 6.480 1669
Guniting/M3(1:2:2) cum 83 12.000 998
Brick Work/M3(1:4) cum 177 1.900 335
Plastering/M2(1:4) cum 4300 0.170 732
Dholpur Stone/M2 sqm 100 0.306 31
Slurry for Roof water proofing slurry sqm 1900 0.039 74
work in progress 425
nt consumption as per theoretical Bags 8501
CEMENT RECONCILIATION STATEMENT(Up to 31.10.2012)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and
Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”
Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 41/54
M/s Larsen & Toubro Limited, Delhi.
Description of Item UOMExecuted
Qty.
Coefficie
nt (Bag)
Qty. of
Cement
(Bags)
RCC M25 (M3) cum 572 7.200 4118
PCC M15 (M3) cum 58 5.800 335
SCREED M20 (M3) cum 109 6.480 709
Guniting/M3(1:2:2) cum 13 12.000 158
Brick Work/M3(1:4) cum 162 1.900 307
Plastering/M2(1:4) cum 4000 0.170 681
Slurry for Roof water proofing slurry sqm 1500 0.039 59
work in progress 25
nt consumption as per theoretical Bags 6367 nt consumed as per actual Bags 6493
cement consumed more than theoretical Bags 101
antity of cement available Bags 1867
nt received till 30.09.2012 Bags 8360
astage in % 1.591%
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and
Maintenance for 10 years of SCADA system at Bhagirathi WTP & Distribution Area.”
Delhi.
CEMENT RECONCILIATION STATEMENT
(Up to 30.09.2012)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 42/54
RCC M25 (M3) cum 321 7.200 2312
PCC M15 (M3) cum 53 5.800 306
SCREED M20 (M3) cum 46 6.480 300
Brick Work/M3(1:4) cum 87 1.900 164
Slurry for Roof water proofing slurry sqm 1000 0.039 39Ancillary Work 410
work in progress 150
nt consumption as per theoretical Bags 3532
nt consumed as per actual Bags 3740
cement consumed more than theoretical Bags 58
antity of cement available Bags 2420
nt received till 31.08.2012 Bags 6160
astage in % 1.629%
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 43/54
Name of
Project
Agency M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOMExecuted
Qty.
Coefficient
(Bag)
Qty. of Cement
(Bags)
1 RCC M25 (M3) cum 321 7.200 2312
2 PCC M15 (M3) cum 53 5.800 306
3 SCREED M20 (M3) cum 46 6.480 300
4 Brick Work/M3(1:4) cum 87 1.900 164
5 Slurry for Roof water proofing slurry sqm 1000 0.039 39
6 Ancillary Work 410
7 work in progress 150Total cement consumption as per theoretical Bags 3532
Total cement consumed as per actual Bags 3740
Total extra cement consumed more than theoretical Bags 58
Balance quantity of cement available Bags 2420
Total cement received till 31.08.2012 Bags 6160
Cement wastage in % 1.629%
Authorised signatory
Larsen & Toubro Ltd
CEMENT RECONCILIATION STATEMENT
(Up to 31.08.2012)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years
of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 48/54
Name of
Project
Agency M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOMExecuted
Qty.
Coefficient
(Bag)
Qty. of Cement
(Bags)
1 RCC M25 (M3) cum 1013 7.200 7297
2 RCC M30 (M3) cum 59 7.200 427
3 PCC M15 (M3) cum 155 5.800 902
4 SCREED M20 (M3) cum 380 6.480 2461
5 Guniting/M3(1:2:2) cum 120 12.000 1440
6 Brick Work/M3(1:4) cum 345 1.900 655
7 Plastering/M2(1:4) sqm 6260 0.170 1065
8 Dholpur Stone/M2 sqm 1730 0.306 529
9 Tapecrete sqm 5900 0.013 77
10 Slurry for Roof water proofing slurry sqm 3200 0.039 125
11 work in progress 250
Total cement consumption as per theoretical Bags 14978
Total cement consumed as per actual Bags 15504
Total extra cement consumed more than theoretical Bags 276
Balance quantity of cement available Bags 1132
Total cement received till 31.01.2013 Bags 16636
Cement wastage in % 1.844%
Authorised signatory
Larsen & Toubro Ltd
CEMENT RECONCILIATION STATEMENT
(Up to 31.01.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years
of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 49/54
Name of
Project
Agency M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOMExecuted
Qty.
Coefficient
(Bag)
Qty. of Cement
(Bags)
1 RCC M25 (M3) cum 1087 7.200 7830
2 RCC M30 (M3) cum 242 7.200 1741
3 PCC M15 (M3) cum 225 5.800 1305
4 SCREED M20 (M3) cum 415 6.480 2690
5 Guniting/M3(1:2:2) cum 120 12.000 1440
6 Brick Work/M3(1:4) cum 438 1.900 831
7 Plastering/M2(1:4) sqm 7760 0.170 1321
8 Dholpur Stone/M2 sqm 1870 0.306 572
9 Tapecrete sqm 6100 0.013 79
10 Slurry for Roof water proofing slurry sqm 4000 0.039 156
11 work in progress 300
Total cement consumption as per theoretical Bags 17965
Total cement consumed as per actual Bags 18564
Total extra cement consumed more than theoretical Bags 299
Balance quantity of cement available Bags 1112
Total cement received till 28.02.2013 Bags 19676
Cement wastage in % 1.664%
Authorised signatory
Larsen & Toubro Ltd
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years
of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.
CEMENT RECONCILIATION STATEMENT
(Up to 28.02.2013)
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 50/54
Name of
Project
Agency M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOMExecuted
Qty.
Coefficient
(Bag)
Qty. of Cement
(Bags)
1 RCC M25 (M3) cum 1164 7.200 8378
2 RCC M30 (M3) cum 350 7.200 2524
3 PCC M15 (M3) cum 247 5.800 1432
4 SCREED M20 (M3) cum 553 6.480 3585
5 Guniting/M3(1:2:2) cum 148 12.000 1776
6 Brick Work/M3(1:4) cum 458 1.900 869
7 Plastering/M2(1:4) sqm 8460 0.170 1440
8 Dholpur Stone/M2 sqm 2270 0.306 695
9 Tapecrete sqm 6100 0.013 79
10 Slurry for Roof water proofing slurry sqm 5000 0.039 195
11 work in progress 550
Total cement consumption as per theoretical Bags 20973
Total cement consumed as per actual Bags 21934
Total extra cement consumed more than theoretical Bags 411
Balance quantity of cement available Bags 1132
Total cement received till 31.03.2013 Bags 23066
Cement wastage in % 1.961%
Authorised signatory
Larsen & Toubro Ltd
CEMENT RECONCILIATION STATEMENT
(Up to 31.03.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years
of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 51/54
Name of
Project
Agency M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOMExecuted
Qty.
Coefficient
(Bag)
Qty. of Cement
(Bags)
1 RCC M25 (M3) cum 1300 7.200 9363
2 RCC M30 (M3) cum 433 7.200 3118
3 PCC M15 (M3) cum 254 5.800 1471
4 SCREED M20 (M3) cum 565 6.480 3663
5 Guniting/M3(1:2:2) cum 150 12.000 1800
6 Brick Work/M3(1:4) cum 488 1.900 926
7 Plastering/M2(1:4) sqm 10460 0.170 1780
8 Dholpur Stone/M2 sqm 2770 0.306 848
9 Tapecrete sqm 6100 0.013 79
10 Slurry for Roof water proofing slurry sqm 5200 0.039 203
11 work in progress 500
Total cement consumption as per theoretical Bags 23252
Total cement consumed as per actual Bags 24184
Total extra cement consumed more than theoretical Bags 432
Balance quantity of cement available Bags 1922
Total cement received till 30.04.2013 Bags 26106
Cement wastage in % 1.860%
Authorised signatory
Larsen & Toubro Ltd
CEMENT RECONCILIATION STATEMENT
(Up to 30.04.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years
of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 52/54
Name of
Project
Agency M/s Larsen & Toubro Limited, Delhi.
SL.NO Description of Item UOMExecuted
Qty.
Coefficient
(Bag)
Qty. of Cement
(Bags)
1 RCC M25 (M3) cum 1425 7.200 10263
2 RCC M30 (M3) cum 458 7.200 3298
3 PCC M15 (M3) cum 268 5.800 1556
4 SCREED M20 (M3) cum 571 6.480 3702
5 Guniting/M3(1:2:2) cum 155 12.000 1860
6 Brick Work/M3(1:4) cum 518 1.900 983
7 Plastering/M2(1:4) sqm 11960 0.170 2036
8 Dholpur Stone/M2 sqm 3270 0.306 1001
9 Tapecrete sqm 6100 0.013 79
10 Slurry for Roof water proofing slurry sqm 5500 0.039 215
11 work in progress 325
Total cement consumption as per theoretical Bags 24992
Total cement consumed as per actual Bags 25690
Total extra cement consumed more than theoretical Bags 373
Balance quantity of cement available Bags 1936
Total cement received till 31.05.2013 Bags 27626
Cement wastage in % 1.494%
Authorised signatory
Larsen & Toubro Ltd
CEMENT RECONCILIATION STATEMENT
(Up to 31.05.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years
of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.
8/10/2019 Monthly Cement 29.10.13
http://slidepdf.com/reader/full/monthly-cement-291013 53/54
Name of
Project
Agency M/s Larsen & Toubro L imited, Delhi.
1 RCC M25 (M3) cum 1515 7.200 10908
2 RCC M30 (M3) cum 511 7.200 3677
3 PCC M15 (M3) cum 306 5.800 1775
4 SCREED M20 (M3) cum 584 6.480 3784
5 Guniting/M3(1:2:2) cum 160 12.000 1920
6 Brick Work/M3(1:4) cum 543 1.900 1031
7 Plastering/M2(1:4) sqm 13460 0.170 2291
8 Dholpur Stone/M2 sqm 3792 0.306 1160
9 GRANITE FLOORING(1:4) sqm 125 0.248 31
10 VITRIFIED FLOORING(1:4) sqm 250 0.248 62
11 Tapecrete sqm 6100 0.013 79
12 Slurry for Roof water proofing slurry sqm 6300 0.039 246
13 work in progress 200
Total cement consumption as per theoretical Bags 26965
Total cement consumed as per actual Bags 27622
Total extra cement consumed more than theoretical Bags 457
Balance quantity of cement available Bags 4Total cement received till 30.06.2013 Bags 27626
Cement wastage in % 1.696%
Authorised signatory
Larsen & Toubro Ltd
CEMENT RECONCILIATION STATEMENT
(Up to 30.06.2013)
“Design, Construction, Supply, Testing, Commissioning, Trial run, Operation and Maintenance for 10 years
of SCADA system at Bhagirathi WTP & Distribution Area.” Delhi.
SL.NO Description of Item UOMExecuted
Qty.
Coefficient
(Bag)
Qty. of Cement
(Bags)
top related