multilateral interoperability … document library/99...multilateral interoperability programme mip...
Post on 26-Jun-2018
233 Views
Preview:
TRANSCRIPT
MIR – SEAWG Edition: 3.0.9
MULTILATERAL INTEROPERABILITY PROGRAMME
MIP IMPLEMENTATION RULES (MIR)
14 May 2009, Greding Germany
This Multilateral Interoperability Programme (MIP) Implementation Rules (MIR) has
been reviewed and is hereby “Approved” by the Heads of Delegation of participating
nations. Release of this document to nations or agencies, who are not participants in
the Multilateral Interoperability Programme including the media and general public,
requires approval of the MIP Steering Group (MSG) in accordance with the policy
stated in the MIP Communications and Liaison Plan (MCLiP). This document is the
property of the MIP Participants and the information contained in this document shall
not be communicated, either directly or indirectly, to any person or agency not
authorised to receive it.
MIR – SEAWG 20090514
Edition: 3.0.9
i
RECORD OF CHANGES PAGE
MIR 3.0.9 (MIP WG-30 14 May 2009)
CP Number
Date Entered
Responsible individual
Remarks
14 May 2009
SEAWG Document version identifier changed from 3.9 to 3.0.9 in preparation for release of MIP baseline 3.0 documentation.
14 May 2009
SEAWG Revised format and content of MIR Main document to conform with MIP Boiler Plate Text 3.0.3
CP-SEAWG-30475-MIR-V2
14 May 2009
SEAWG Rules for semantic encapsulation of OIGs involving ACTION
CP-SEAWG-30476-MIR-V4
14 May 2009
SEAWG Recommendations for using context-object-item-association
CP-SEAWG-30478-MIR-V4
14 May 2009
SEAWG Distribution of separately managed Annexes/Appendices
CP-SEAWG-30482-MIR-V6
14 May 2009
SEAWG Unambiguously specify the size indicator for unit boundaries
CP-SEAWG-30494-MIR-V3
14 May 2009
SEAWG Mandate different naming for replacement OIGs
CP-SEAWG-30498-MIR-V1
14 May 2009
SEAWG Prevent use of empty string in mandatory text fields
CP-SEAWG-30499-MIR-V5
14 May 2009
SEAWG Differences between “Undefined” “Removed” and “End”ing of Locations
CP-SEAWG-30507-MIR-V2
14 May 2009
SEAWG Usage of object-item-comment and action-comment
CP-SEAWG-30512-MIR-V2
14 May 2009
SEAWG Removing redundant rules from MIR Annex E Appendix 1 - Plans and Orders
CP-SEAWG-30514-MIR-V4
14 May 2009
SEAWG Removing a non-OIG context from an OIG
CP-SEAWG-30517-MIR-v1
14 May 2009
SEAWG Cleanup MIR Annex A Glossary terms
CP-SEAWG-30422-SYM-v4
14 May 2009
SYM WP Error in geometry rules for Orchard/Plantation
CP-SEAWG-30465-SYM-v2
14 May 2009
SYM WP Mapping issues related to unit symbols based on OWG recommendations
CP-SEAWG-30466-SYM-v2
14 May 2009
SYM WP Mapping issues related to UAV unit symbols based on OWG
MIR – SEAWG 20090514
Edition: 3.0.9
ii
recommendations CP-SEAWG-30470-SYM-v4
14 May 2009
SYM WP MPR#1054: Correct Geometry Mapping for FARP and Holding Line.
CP-SEAWG-30480-SYM-v2
14 May 2009
SYM WP CP to handle MPRs that lists editorial errors in MIR Annex G and F.
CP-SEAWG-30483-SYM-v1
14 May 2009
SYM WP CP to handle MPRs that addresses missing BR errors in MIR Annex G and F which are similar in nature.
CP-SEAWG-30484-SYM-v1
14 May 2009
SYM WP Way Point symbology mapping
CP-SEAWG-30485-SYM-v1
14 May 2009
SYM WP Transit Corridor Geometry
CP-SEAWG-30486-SYM-v1
14 May 2009
SYM WP Harassing - Correct Geometry
CP-SEAWG-30487-SYM-v1
14 May 2009
SYM WP Missing biological and chemical alarm Geometry
CP-SEAWG-30491-SYM-v2
14 May 2009
SYM WP Symbology QA
CP-SEAWG-30492-SYM-v2
14 May 2009
SYM WP MPR#1054: Correct Geometry Mapping for Holding Line.
CP-SEAWG-30501-SYM-v2
14 May 2009
SYM WP MPR 1358: Symbology QA - Part 1
CP-SEAWG-30502-SYM-v1
14 May 2009
SYM WP MPR 1358: Symbology QA - Part 2
CP-SEAWG-30503-SYM-v1
14 May 2009
SYM WP MPR 1358: Symbology QA - Part 3
CP-SEAWG-30508-SYM-v1
14 May 2009
SYM WP Symbol 1.x.3.1.1.7.3.4.2. Artillery target acquisition tracked not supported
CP-SEAWG-30510-SYM-v1
14 May 2009
SYM WP MPR 472: Have we been tripped up by the MIL-STD2525B Trip wire?
CP-SEAWG-30511-SYM-v1
14 May 2009
SYM WP MPR 1146: TableG2-58 shows wrong geometry for CBRN-EVENT
CP-SEAWG-30516-SYM-v2
14 May 2009
SYM WP APP6a Staff Comments modifier to JC3IEDM mapping
MIR 3.8 (MIP WG-29 12 February 2009)
CP Number
Date Entered
Responsible individual
Remarks
MIR – SEAWG 20090514
Edition: 3.0.9
iii
CP-SEAWG-30447-MIR-V1
12 Feb 2009
SEAWG New MIP Common Datafill for JC3IEDM 3.1d
CP-SEAWG-30454-MIR-V3
12 Feb 2009
SEAWG Clarify Unit Boundary Echelon Indictor
CP-SEAWG-30462-MIR-V2
12 Feb 2009
SEAWG Hostility mapping to APP-6A Affiliation Code
CP-SEAWG-30473-MIR-V1
12 Feb 2009
SEAWG Representation of Notional Units
12 Feb 2009
SEAWG Updated filename and internal header version of MIR Annex D - Key Management-JC3IEDM from V6 to v3.7 (editorial only, no change to content)
12 Feb 2009
SEAWG Added list of filenames for Annexes F and G (editorial only, no change to content)
MIR 3.7 (MIP WG-28 11 December 2008)
CP Number
Date Entered
Responsible individual
Remarks
CP-SEAWG-30336-SYM-V4
11 Dec 2008
SYM WP Establish symbology mappings as MIR Annex G
CP-SEAWG-30420-SYM-V3
11 Dec 2008
SYM WP Fix minor errors in UNIT-TYPE symbology mapping
CP-SEAWG-30421-SYM-V3
11 Dec 2008
SYM WP MPR 897 Correction of minefield symbology mapping
CP-SEAWG-30427-MIR-V1
11 Dec 2008
SEAWG Update key allocation procedure text from MOP to MIR
CP-SEAWG-30428-MIR-V4
11 Dec 2008
SEAWG Update Key Management document to reflect new MIP membership
CP-SEAWG-30434-MIR-V6
11 Dec 2008
SEAWG Representing IEDs in current Data Model
CP-SEAWG-30435-SYM-V2
11 Dec 2008
SYM WP Symbology for IEDs
CP-SEAWG-30436-SYM-V1
11 Dec 2008
SYM WP MPR#909: Safe area for evasion: MIR geometry conflicts with business rule
CP-SEAWG-30437-SYM-V1
11 Dec 2008
SYM WP MPR#1194: MIR Annex F 5-2-02 Action event geometry rules – radiological-release-event-category-code is not existent
MIR – SEAWG 20090514
Edition: 3.0.9
iv
CP-SEAWG-30438-SYM-V1
11 Dec 2008
SYM WP MPR#1162: Geometry specification for minefields modified unintentionally by 3.6 annex F change
CP-SEAWG-30439-SYM-V1
11 Dec 2008
SYM WP MPR#1190: MIR 3.6 annex F Definitions of Generic Geometry Rules
CP-SEAWG-30441-SYM-V1
11 Dec 2008
SYM WP MPR#382: Clarify MIR Control Features 2.4f for Weapons Free Zone
CP-SEAWG-30442-SYM-V1
11 Dec 2008
SYM WP MPR#891: MIR 3.6 annex F Definitions of Generic Geometry Rule. Need fix in geometry for action-event-category-code Turning and action-task-activity-code Turns
CP-SEAWG-30444-MIR-V3
11 Dec 2008
SEAWG Representation of Notional Units
CP-SEAWG-30445-MIR-V2
11 Dec 2008
SEAWG Improve layout of MJUR section 3.4 (OIGs and Organisations)
MIR 3.6 (MIP WG-27 18 September 2008)
CP Number
Date Entered
Responsible individual
Remarks
CP-SEAWG-30335-SYM-V2
18 Sep 2008
SYM WP Remove (move to MIR Annex H) symbology mappings from MIR Annex F
CP-SEAWG-30406-MIR-V3
18 Sep 2008
SEAWG Re-generated MIP Common Data Fill for JC3IEDM 3.1c
CP-SEAWG-30410-MIR-V5
18 Sep 2008
SEAWG Adding missing exception for PLN_ORDR_DISTR
CP-SEAWG-30412-MIR-V3
18 Sep 2008
SEAWG Removal of superfluous context-category-codes from MJUR
MIR 3.5 (MIP WG-26 17 April 2008)
CP Number
Date Entered
Responsible individual
Remarks
CP-SEAWG-30370-MIR-V5
17 Apr 2008
SEAWG Restriction on Usage of Context-Reporting-Data-Association
MIR – SEAWG 20090514
Edition: 3.0.9
v
CP-SEAWG-30376-MIR-V5
17 Apr 2008
SEAWG Clarification of usage of 'most recent'
CP-SEAWG-30382-MIR-V2
17 Apr 2008
SEAWG Add text to empty section 4.5 in MJUR P & O Appendix
CP-SEAWG-30384-MIR-V1
17 Apr 2008
SEAWG Corrections of faulty soft links
CP-SEAWG-30385-MIR-V2
17 Apr 2008
SEAWG Clarify what soft links are used for
CP-SEAWG-30386-MIR-V1
17 Apr 2008
SEAWG Clarify p-relations for COIA and ACTION-CONTEXT
CP-SEAWG-30387-MIR-V3
17 Apr 2008
SEAWG Clarify OIG linkage and Soft Link optionality
CP-SEAWG-30389-MIR-V4
17 Apr 2008
SEAWG Stop a superseded order
CP-SEAWG-30397-MIR-V1
17 Apr 2008
SEAWG Associations between Orders
MIR 3.4 (MIP WG-25 31 January 2008)
CP Number
Date Entered
Responsible individual
Remarks
CP-SEAWG-30348-MIR-V3
31 Jan 2008
SEAWG Corrections of faulty soft links
CP-SEAWG-30358-MIR-V1
31 Jan 2008
SEAWG Rename MIR common data fill annex to permit symbology revisions
CP-SEAWG-30360-MIR-V3
31 Jan 2008
SEAWG Representation of Commandpost / Headquarters in JC3IEDM
CP-SEAWG-30361-MIR-V2
31 Jan 2008
SEAWG Move rules for non-OIG Contexts from P&O appendix to MJUR
CP-SEAWG-30362-MIR-V2
31 Jan 2008
SEAWG Representation of Unit Activity in the JC3IEDM
CP-SEAWG-30364-MIR-V2
31 Jan 2008
SEAWG Add usage rules for the candidate-target-list sub-model
CP-SEAWG-30368-MIR-V3
31 Jan 2008
SEAWG Specification of data types
MIR 3.3 (MIP WG-24 13 December 2007)
CP Number
Date Entered
Responsible individual
Remarks
MIR – SEAWG 20090514
Edition: 3.0.9
vi
CP-SEAWG-30223-MIR-V3
13 Dec 2007
SEAWG Restrict usage for proxy OIGs and transfer of OIG responsibility
CP-SEAWG-30295-MIR-V2
13 Dec 2007
SEAWG Remove Open Issues/Limitations section from MIR-Annex E (JC3IEDM Usage Rules) MJUR
CP-SEAWG-30296-MIR-V1
13 Dec 2007
SEAWG Align section 3.7.3 and 3.9.3 in MIR-Annex E (JC3IEDM Usage Rules) MJUR
CP-SEAWG-30297-MIR-V2
13 Dec 2007
SEAWG Change MIR-Annex E (JC3IEDM Usage Rules) MJUR section 3.3 from a rule to a recommendation
CP-SEAWG-30301-MIR-V1
13 Dec 2007
SEAWG Clarify section 4.6.5, use of ‘Is replaced by’ when creating FRAGOs
CP-SEAWG-30302-MIR-V3
13 Dec 2007
SEAWG Change section 4.8, Changing the Status of an Order, clarify the intended use of the ORDER-STATUS
CP-SEAWG-30309-MIR-V3
13 Dec 2007
SEAWG Restrict the use of CARTESIAN-COORDINATE in MIP Block 3
CP-SEAWG-30310-MIR-V4
13 Dec 2007
SEAWG Restrict the use of RELATIVE-COORDINATE-SYSTEM in MIP Block 3
CP-SEAWG-30317-MIR-V2
13 Dec 2007
SEAWG Re-generated MIP Common Data Fill
CP-SEAWG-30326-MIR-V2
13 Dec 2007
SEAWG Removing a REFERENCE from a Plan Component
CP-SEAWG-30327-MIR-V6
13 Dec 2007
SEAWG Allow Replacement OIGs for Error Recovery
CP-SEAWG-30333-MIR-V2
13 Dec 2007
SEAWG Correction to the MJUR rule for specifying imprecise datetimes
MIR 3.2 (MIP WG-23 28 September 2007)
CP Number
Date Entered
Responsible individual
Remarks
CP-SEAWG-30134-MIR-v3
16 Feb 2007
SEAWG Add sections to describe the usage of ACTION-CONTEXT (CP was not fully included in the post-WG-21 release)
CP-SEAWG-30275-MIR-V1
28 Sept 2007
SEAWG Editorial corrections to MIR 3.1
CP-SEAWG-30276-MIR-V2
28 Sept 2007
SEAWG MIR Annex A Glossary revisions
MIR – SEAWG 20090514
Edition: 3.0.9
vii
CP-SEAWG-30280-MIR-V2
28 Sept 2007
SEAWG MIR revisions
CP-SEAWG-30283-MIR-V1
28 Sept 2007
SEAWG Removal of restriction – Plan-Order-Component-Structure
CP-SEAWG-30286-MIR-V1
28 Sept 2007
SEAWG Obsolete Semantic Encapsulation Example
CP-SEAWG-30293-MIR-V1
28 Sept 2007
SEAWG Handling removal of Plan Components and sub-Components
CP-SEAWG-30294-MIR-V3
28 Sept 2007
SEAWG Semantic Encapsulation of OIGs
MIR 3.1 (MIP WG-22 01 June 2007)
CP Number
Date Entered
Responsible individual
Remarks
CP-SEAWG-30131-MIR-v4
01 June 2007
SEAWG Replace the contents of the MJUR Appendix 3 (Soft Links)
CP-SEAWG-30135-MIR-v6
01 June 2007
SEAWG Revise ‘Definition of Most Recent’ section
CP-SEAWG-30137-MIR-v7
01 June 2007
SEAWG Add a Business Rule for use of RPTD.ent_cat_code
CP-SEAWG-30167-MIR-v1
01 June 2007
SEAWG Updating Common Datafill from C2IEDM to JC3IEDM
CP-SEAWG-30197-MIR-v6
01 June 2007
SEAWG Separate FragO
CP-SEAWG-30198-MIR-v4
01 June 2007
SEAWG Linking Plans/Orders to OIGs
CP-SEAWG-30205-MIR-v5
01 June 2007
SEAWG Rules for Releasing an Order based on a Plan
CP-SEAWG-30218-MIR-v1
01 June 2007
SEAWG Update the MJUR Appendix 2 “OIG Content”
CP-SEAWG-30222-MIR-v2
01 June 2007
SEAWG OIG Content revision in line with JC3IEDM
CP-SEAWG-30239-MIR-v1
01 June 2007
SEAWG Remove MJUR annex with Erwin extracts
CP-SEAWG-30240-MIR-v3
01 June 2007
SEAWG Rules changing the status for a plan
CP-SEAWG-30246-MIR-v2
01 June 2007
SEAWG Changing the Status of an Order
CP-SEAWG-30248-MIR-v2
01 June 2007
SEAWG Superseding Plans and Orders, and Disassociating Plans
CP-SEAWG-30249-MIR-v6
01 June 2007
SEAWG Warning Order Usage Rules
MIR – SEAWG 20090514
Edition: 3.0.9
viii
CP-SEAWG-30250-MIR-v2
01 June 2007
SEAWG Prevent orphaned data in PLNORG OIG
CP-SEAWG-30252-MIR-v3
01 June 2007
SEAWG Attaching Data to a Plan/Order
CP-SEAWG-30254-MIR-v3
01 June 2007
SEAWG Miscellaneous updates to P&O Appendix
CP-SEAWG-30256-MIR-v1
01 June 2007
SEAWG Update definition of SoftLinks
CP-SEAWG-30253- SYM-v4
01 June 2007
SYM WP Revision of MIR Annex F Symbology
MIR 3.0.3 (MIP WG-21 16 February 2007)
CP Number
Date Entered
Responsible individual
Remarks
CP-SEAWG-30127-MIR-v1
16 Feb 2007
SEAWG Editorial corrections to MJUR Main document for Block 3
CP-SEAWG-30128-MIR-v1
16 Feb 2007
SEAWG Revise MJUR Introduction
CP-SEAWG-30129-MIR-v1
16 Feb 2007
SEAWG Remove references to MTIR and SRS requirements
CP-SEAWG-30130-MIR-v1
16 Feb 2007
SEAWG Add a ‘References’ section to the MJUR Introduction
CP-SEAWG-30132-MIR-v2
16 Feb 2007
SEAWG OIG naming convention
CP-SEAWG-30133-MIR-v1
16 Feb 2007
SEAWG Update the MJUR Appendix 2 OIG Content for Block 3
CP-SEAWG-30134-MIR-v3
16 Feb 2007
SEAWG Add sections to describe the usage of ACTION-CONTEXT
CP-SEAWG-30179-MIR-v2
16 Feb 2007
SEAWG Adding Plans&Orders Overview Information
CP-SEAWG-30181-MIR-v3
16 Feb 2007
SEAWG Usage rule for physical-only update_seqnr
CP-SEAWG-30195-MIR-v2
16 Feb 2007
SEAWG Usage rule to ensure consistency in a CONTEXT between REPORTING DATA and operational information being reported
CP-SEAWG-30166-MEM-v2
16 Feb 2007
MEM WP Remove Files from MIR Annex C
CP-SEAWG-30177-SYM-v1
16 Feb 2007
SYM WP Initial release of MIR Annex F for Block 3
CP-SEAWG-30190-SYM-v1
16 Feb 2007
SYM WP JC3IEDM 3.1a alignment
MIR – SEAWG 20090514
Edition: 3.0.9
ix
CP-SEAWG-30191-SYM-v1
16 Feb 2007
SYM WP Quality Enhancement of MIR Annex F
CP-SEAWG-30192-SYM-v1
16 Feb 2007
SYM WP Ordering of points in POLYGON-AREA illustrations
MIR 3.0.2 (MIP WG-20 08 December 2006)
CP Number
Date Entered
Responsible individual
Remarks
SEAWG-CAN-2006-11-002-MIR v5
08 Dec 2006
SEAWG Usage Rules for Overlay Contexts
SEAWG-CAN-2006-11-003-MIR v4
08 Dec 2006
SEAWG Plans and Orders Usage Rules
SEAWG-GBR-2006-11-001-MIR v4
08 Dec 2006
SEAWG Add MJUR Business Rule for populating physical-only originating_org_id attribute
SEAWG-GBR-2006-11-007-MIR v2
08 Dec 2006
SEAWG Update MIR Annex D (Key Management) to JC3IEDM
SEAWG-GBR-2006-12-008-MIR v1
08 Dec 2006
SEAWG Restructuring MIR Annex E based on Concept CPs: SEAWG-GBR-2006-11-004-MIR v1 SEAWG-GBR-2006-11-005-MIR v1 SEAWG-GBR-2006-11-003-MIR v1 SEAWG-GBR-2006-11-006-MIR v1 SEAWG-GBR-2006-11-002-MIR v1
MIR – SEAWG 20090514
Edition: 3.0.9
xi
TABLE OF CONTENTS
___________________________________________________________________ SECTION TITLE PAGE ___________________________________________________________________
1 MIP VISION .........................................................................................................................................................1
1.1 MIP SCOPE ...............................................................................................................................................1
1.2 MIP MISSION ............................................................................................................................................1
1.3 MIP TASKS ................................................................................................................................................1
1.4 AIM...............................................................................................................................................................2
1.5 EXECUTIVE SUMMARY ........................................................................................................................2
ANNEX A GLOSSARY..................................................................................................................................... A-1
ANNEX B MIP WORK-AROUND RULE DEFINITIONS............................................................................B-1
ANNEX C NOT CURRENTLY IN USE ......................................................................................................... C-1
ANNEX D KEY MANAGEMENT .................................................................................................................... D-1
ANNEX E JC3IEDM USAGE RULES (MJUR) ............................................................................................E-1
ANNEX F SYMBOLOGY RULES...................................................................................................................F-1
ANNEX G SYMBOLOGY RULES.................................................................................................................. G-1
ANNEX H COMMON DATA FILL .................................................................................................................. H-1
MIR – SEAWG 20090514
Edition: 3.0.9
1
MIP IMPLEMENTATION RULES (MIR)
1 MIP VISION
The vision for the Multilateral Interoperability Programme (MIP) is to become the
principal operator-led multinational forum to promote international interoperability
of Command and Control Information Systems (C2IS) at all levels of command.
1.1 MIP SCOPE
The MIP scope is to deliver a command and control interoperability solution focused
on the Land operational user in a Joint environment.
1.2 MIP MISSION
MIP is to further develop and improve interface specifications in order to reduce the
interoperability gap between different C2IS.
1.3 MIP TASKS
− Support fielded MIP solutions.
− Further improve the MIP solution by adopting modern development
approaches and standards1.
− Harmonise with NATO and leverage other appropriate standards2.
− Improve flexibility in using the MIP solution in ad-hoc coalitions.
− Extend the scope of MIP interoperability.
− Engage Air, Maritime and other Coalition of Interests to cooperate with
MIP.
− Examine better ways of structuring the MIP programme.
1 Examples of approaches and standards include the NATO Architectural Framework (NAF), Model
Driven Development, Service Orientation and common standards (XML, UML, RDF, etc.).
2 Examples include NNEC, APP-11, APP-6, etc.
MIR – SEAWG 20090514
Edition: 3.0.9
2
2 AIM
MIP requirements are fulfilled either by machine procedures implemented in
computers or by human procedures executed by system operators and staff
personnel. The MIP Operating Procedures (MOP) defines part of the human
procedures needed to operate in a MIP environment. The MOP defines the
procedures executed by gateway operators and information system personnel in
order to “keep the system running”. The MIP Implementation Rules (MIR) document
is a counterpart to the MOP in that it deals with those procedures or rules which can
be implemented in a computer system and should not be the responsibility of a
human operator.
3 EXECUTIVE SUMMARY
This MIR document contains a disparate collection of rules and guidelines for
different implementation areas which have been gathered together in one place for
convenience. These rules do not constitute part of the technical design, nor are they
operating procedures for the MIP Gateway user. This document therefore defines
implementation rules which are not included in either the MTIDP or the JC3IEDM;
however, conformance to these rules is necessary to ensure effective interoperability.
There are defined within MIP two kinds of procedures, one of which loosely may be
termed “connection procedures” and the other which loosely may be termed
“information procedures”.
Information procedures are the ones that are needed in order for the information in
the system to be correct and understandable. Information procedures typically are
documented as rules to follow. These are mostly to be found in this MIR document.
There are “Standard Operating Procedures” for staff officers (operators) in a MIP
enabled force. These are described in the MIP Operational Handbook edited by the
OWG.
MIR – SEAWG 20090514
Edition: 3.0.9
3
The diagram below illustrates the relationships between the MIP documents and their
intended users.
MIP Operational Handbook
MIP Operating
Procedures
MTIDP and MIP
Implementation Rules
Commander and Staff Officers
Gateway Operator
Implementer
MIP Gateway Software
MIP Gateway
GUI
Use cases
MIR-Annex A-SEAWG 20090514
Edition: 3.0.9
A-1
ANNEX A GLOSSARY
AOP-38 Allied Ordnance Publication 38
C2 Command and Control
C2IEDM Command and Control Information Exchange Data Model
C2IS Command and Control Information System
DB Database
DEM Data Exchange Mechanism
GW (MIP) Gateway
GUI Graphical User Interface
HQ Headquarters
IED Improvised Explosive Device
JC3IEDM Joint Consultation, Command and Control Information Exchange
Data Model
MCUR MIP C2IEDM Usage Rules
MEM Message Exchange Mechanism
MIP Multilateral Interoperability Programme
MIP GW MIP Gateway
MIR MIP Implementation Rules
MOP MIP Operating Procedures
MJUR MIP JC3IEDM Usage Rules
MSIG MIP Security Information Guidance
MSRS MIP System Requirements Specification
MTIDP MIP Technical Interface Design Plan
MTIR MIP Tactical C2IS Interoperability Requirement
NATO North Atlantic Treaty Organisation
NBC Nuclear, Biological and Chemical
OC Operation Centre
OIG Operational Information Group
OWG (MIP) Operational Working Group
PDU Protocol Data Unit
MIR-Annex B-SEAWG 20090514
Edition: 3.0.9
B-1
ANNEX B MIP WORK-AROUND RULE DEFINITIONS
N.B. This annex has been left empty to permit the reference to individual Annex B
appendices. These should be included in a sub-directory as separate files each
containing a distinct implementation rule. This is necessary because the rules will not
always be closely related. It will prevent the ‘hiding’ of implementation detail in
revised annexes, since each rule will be stored separately and listed below with a
date. Its main purpose is to act as a holding place for those issues which are raised
as CPs (and subsequently accepted), for which there is no suitable annex already
available. In addition, it permits the retention of the same annex lettering as was used
in the MOP for the remaining annexes. However, this annex should not be used as a
‘dumping ground’ for everything; any topic of a substantial nature should be allocated
a new MIR annex of its own.
Implementation rules are documented as appendices to this Annex B of the MIR. The
naming convention is:
MIR-AnnexB-rule name-version
Annex B contains the following files:
Procedure name Version Date Comment
MIR-Annex C-SEAWG 20090514
Edition: 3.0.9
C-1
ANNEX C NOT CURRENTLY IN USE
Annex C is currently empty following a CP to remove the MIP and NATO NBC
Message Definitions. The annex is retained without a subject title to avoid
renaming subsequent annexes.
Annex C contains the following files:
File name Version Date Comment
MIR-Annex D-SEAWG 20090514
Edition: 3.0.9
D-1
ANNEX D KEY MANAGEMENT
Annex D contains the following files:
File name Version Date Comment
MIR-Annex D-Key
allocation procedure-
3.0.9.doc
3.0.9 2009-05-14 This file defines a procedure for
the allocation of key range
prefixes.
MIR Annex D – Key
Management-JC3IEDM-
3.0.9.doc
3.0.9 2009-05-14 This file contains the specification
of a set of rules for the
management of record
identifications (keys) and the
unambiguous specification of
those keys for all operational data
within the distributed environment
of the community of interest.
MIR-Annex E-SEAWG 20090514
Edition: 3.0.9
E-1
ANNEX E JC3IEDM USAGE RULES (MJUR)
Annex E contains the following files:
File name Version Date Comment
MIR Annex E- MIP
JC3IEDM Usage Rules-
3.0.9.doc
3.0.9 2009-05-14 This document captures
additional usage rules of the
Joint Consultation, Command
and Control Information
Exchange Data Model
(JC3IEDM) for implementers of
Command And Control
Information Systems (C2IS) or
mappings between the
JC3IEDM and a national data
store.
MIR-Annex F-SEAWG 20090514
Edition: 3.0.9
F-1
ANNEX F SYMBOLOGY RULES
Annex F contains the following files:
File name Date Comment
MIR Annex F Main.doc MIR Annex F Appendix 2-1 Generic geometry rules change log.doc MIR Annex F Appendix 2-2 Generic geometry rules.doc MIR Annex F Appendix 3-1 Control feature geometry rules change log.doc MIR Annex F Appendix 3-2 Control Feature geometry rules.doc MIR Annex F Appendix 4-1 Facility geometry rules change log.doc MIR Annex F Appendix 4-2 Facility geometry rules.doc MIR Annex F Appendix 5-1-01 Action Task geometry rules change log.doc MIR Annex F Appendix 5-1-02 Action Event geometry rules change log.doc MIR Annex F Appendix 5-2-01 Action Task geometry rules.doc MIR Annex F Appendix 5-2-02 Action Event geometry rules.doc MIR Annex F Appendix 8-1 Convoy geometry rules change log.doc MIR Annex F Appendix 8-2 Convoy geometry rules.doc
2009-05-14
Main document is now v3.0.9
MIR-Annex G-SEAWG 20090514
Edition: 3.0.9
G-1
ANNEX G SYMBOLOGY RULES
Annex G contains the following files:
File name Date Comment
MIR Annex G Main.doc MIR Annex G Appendix 2-1 Symbology Affiliation (Hostility) mapping rules.doc MIR Annex G Appendix 2-2 Symbol modifier field mapping rules.doc MIR Annex G Appendix 3-1 Control Feature symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 3-2 Control Feature symbology mapping rules - APP-6A.doc MIR Annex G Appendix 3-3 Control Feature symbology mapping rules change log - MIL-STD-2525B.doc MIR Annex G Appendix 3-4 Control Feature symbology mapping rules - MIL-STD-2525B.doc MIR Annex G Appendix 4-1 Facility symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 4-2 Facility symbology mapping rules - APP-6A.doc MIR Annex G Appendix 4-3 Facility symbology mapping rules change log - MIL-STD-2525B.doc MIR Annex G Appendix 4-4 Facility symbology mapping rules - MIL-STD-2525B.doc MIR Annex G Appendix 5-1-01 Action Task symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 5-1-02 Action Event symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 5-2-01 Action Task symbology mapping rules - APP-6A.doc
2009-05-14
Main document is now v3.0.9
MIR-Annex G-SEAWG 20090514
Edition: 3.0.9
G-2
MIR Annex G Appendix 5-2-02 Action Event symbology mapping rules - APP-6A.doc MIR Annex G Appendix 5-3-01 Action Task symbology mapping rules change log - MIL-STD-2525B.doc MIR Annex G Appendix 5-3-02 Action Event symbology mapping rules change log - MIL-STD-2525B.doc MIR Annex G Appendix 5-4-01 Action Task symbology mapping rules - MIL-STD-2525B.doc MIR Annex G Appendix 5-4-02 Action Event symbology mapping rules - MIL-STD-2525B.doc MIR Annex G Appendix 6-1 Organisation symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 6-2 Organisation symbology mapping rules - APP-6A.doc MIR Annex G Appendix 7-1-01 Aircraft equipment symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 7-1-02 CBRN equipment symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 7-1-03 Electronic equipment symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 7-1-04 Engineering equipment symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 7-1-05 Maritime equipment symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 7-1-06 Miscellaneous equipment symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 7-1-07 Railcar equipment symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 7-1-08 Vehicle equipment symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 7-1-09 Vessel, other equipment symbology mapping rules change log - APP-6A.doc
MIR-Annex G-SEAWG 20090514
Edition: 3.0.9
G-3
MIR Annex G Appendix 7-1-10 Vessel, subsurface equipment symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 7-1-11 Vessel, surface equipment symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 7-1-12 Weapon equipment symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 7-2-01 Aircraft equipment symbology mapping rules - APP-6A.doc MIR Annex G Appendix 7-2-02 CBRN equipment symbology mapping rules - APP-6A.doc MIR Annex G Appendix 7-2-03 Electronic equipment symbology mapping rules - APP-6A.doc MIR Annex G Appendix 7-2-04 Engineering equipment symbology mapping rules - APP-6A.doc MIR Annex G Appendix 7-2-05 Maritime equipment symbology mapping rules - APP-6A.doc MIR Annex G Appendix 7-2-06 Miscellaneous equipment symbology mapping rules - APP-6A.doc MIR Annex G Appendix 7-2-07 Railcar equipment symbology mapping rules - APP-6A.doc MIR Annex G Appendix 7-2-08 Vehicle equipment symbology mapping rules - APP-6A.doc MIR Annex G Appendix 7-2-09 Vessel, other equipment symbology mapping rules - APP-6A.doc MIR Annex G Appendix 7-2-10 Vessel, subsurface equipment symbology mapping rules - APP-6A.doc MIR Annex G Appendix 7-2-11 Vessel, surface equipment symbology mapping rules - APP-6A.doc MIR Annex G Appendix 7-2-12 Weapon equipment symbology mapping rules - APP-6A.doc MIR Annex G Appendix 8-1 Convoy symbology mapping rules change log - APP-6A.doc
MIR-Annex G-SEAWG 20090514
Edition: 3.0.9
G-4
MIR Annex G Appendix 8-2 Convoy symbology mapping rules - APP-6A.doc MIR Annex G Appendix 8-3 Convoy symbology mapping rules change log - MIL-STD-2525B.doc MIR Annex G Appendix 8-4 Convoy symbology mapping rules - MIL-STD-2525B.doc MIR Annex G Appendix 9-1 Consumable Materiel Type symbology mapping rules change log - APP-6A.doc MIR Annex G Appendix 9-2 Consumable Materiel Type symbology mapping rules - APP-6A.doc MIR Annex G Appendix 9-3 Consumable Materiel Type symbology mapping rules change log - MIL-STD-2525B.doc MIR Annex G Appendix 9-4 Consumable Materiel Type symbology mapping rules - MIL-STD-2525B.doc
MIR-Annex H-SEAWG 20090514
Edition: 3.0.9
H-1
ANNEX H COMMON DATA FILL
Annex H contains the following files:
File name Version Date Comment
MIR Annex H - Common
Data Fill 3.0.9.zip
3.0.9 2009-05-
14
Included as delivered by the
Data Fill Manager – it consists of
two files (SQL and MOU
versions) and has been retained
as a Winzip file to prevent loss of
content.
top related