name for correspondence from pmi · huawei btss were identified and planned to be replaced by new...
Post on 10-Oct-2020
0 Views
Preview:
TRANSCRIPT
Kazi Noor Ahmed
Name as it should appear on your Certificate:Name on Certificate
1720-7 Crescent Place
Kazi NoorPrefix
Name for correspondence from PMI:
Mr.First Name Middle Name
AhmedLast Name
1-647-6872203Preferred Phone Number
shohag072@gmail.comPreferred E-mail Address
Contact Information (Home):Address Line 1
Address Line 2
Address Line 3
TorontoCity
ONState/Providence/Territory
M4C 5L7Zip/Postal Code
CanadaCountry
Contact Information (Work):Address Line 1
Address Line 2
Address Line 3
City State/Providence/Territory Zip/Postal Code
Country
Suffix
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
1 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
Engineering
North South University
Attained Education:
Address Line 1
Plot # 15, Block # B,
Address Line 2
Bashundhara R/A
Address Line 3
City
DhakaState/Providence/Territory Zip/Postal Code
1229
Country
Bangladesh
MastersHighest level of education attained
2009Year degree was awarded
Name of High School, College, or University
NoPMI Accredited?
FieldOfStudy
Program Name
Project Management Experiences:
EngineeringProject Contributor
Two Layer Coverage for Dhaka Metro: OVERVIEW
Started
Oct 2009Through
Nov 2010
Project Role Primary Industry
2 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
880 1911310209hrashid@banglalink.net
Manager/Director
Harun Or Rashid
880 1911304121
Bangladesh
1212Dhaka
Bir Uttam Mir Shawkat Sharak
Tiger's Den, House # 4 (SW)
Banglalink Digital Communications Limited
Optimization Senior Engineer
Two Layer Coverage for Dhaka Metro: ORGANIZATION DETAILS
Address Line 1
Address Line 2
Address Line 3
Gulshan-1
City State/Providence/Territory Zip/Postal Code
Country
Organization Name
Job Title
Phone Number
Contact Name
Contact Relationship
Contact E-mail Contact Phone Number
Two Layer Coverage for Dhaka Metro: PROJECT DETAILS
70.00
Initiating the Project
186.00
Planning the Project
240.00
Executing the Project
217.00
Controlling andMonitoring the Project
62.00
Closing the Project
Objective of this project was to design separate umbrella and micro layer of coverage for Dhaka metro toensure seamless mobility of subscribers. I assisted the project manager to prepare the project schedule. Iled all the planning initiatives within the scope of this project until they were handed over to operationteam. Successfully implementation of two different coverage layers was the key deliverables of thisproject. The project was closed on time upon receiving confirmation from drive testing team.
Description
3 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
EngineeringProject Contributor
Network Load Balancing: OVERVIEW
Started
Apr 2011Through
Nov 2011
Project Role Primary Industry
880 1911310209hrashid@banglalink.net
Manager/Director
Harun Or Rashid
880 1911304121
Bangladesh
1212Dhaka
Bir Uttam Mir Shawkat Sharak
Tiger's Den, House # 4 (SW)
Banglalink Digital Communications Limited
Optimization Senior Assistant Manager
Network Load Balancing: ORGANIZATION DETAILS
Address Line 1
Address Line 2
Address Line 3
Gulshan-1
City State/Providence/Territory Zip/Postal Code
Country
Organization Name
Job Title
Phone Number
Contact Name
Contact Relationship
Contact E-mail Contact Phone Number
4 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
Network Load Balancing: PROJECT DETAILS
54.00
Initiating the Project
142.00
Planning the Project
264.00
Executing the Project
155.00
Controlling andMonitoring the Project
61.00
Closing the Project
Objective of this project was to identify the underutilized sites of the network and take actions to shifttraffic from over utilized and highly utilized sites to underutilized ones. I had a remarkable contributionin scoping of this project. I used to issue necessary WOs to operation and deployment team for tuningparameter settings. This project was to bring down the number of underutilized sites below 2%. Theproject was closed on time upon confirming that 98% of the sites were having over 60% utilization.
Description
EngineeringProject Manager
Plan Capacity Sites: OVERVIEW
Started
Nov 2012Through
May 2013
Project Role Primary Industry
5 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
880 1911310297sraihan@banglalink.net
Manager/Director
Shehab Raihan
880 1911304121
Bangladesh
1212Dhaka
Bir Uttam Mir Shawkat Sharak
Tiger's Den, House # 4 (SW)
Banglalink Digital Communications Limited
Optimization Senior Assistant Manager
Plan Capacity Sites: ORGANIZATION DETAILS
Address Line 1
Address Line 2
Address Line 3
Gulshan-1
City State/Providence/Territory Zip/Postal Code
Country
Organization Name
Job Title
Phone Number
Contact Name
Contact Relationship
Contact E-mail Contact Phone Number
Plan Capacity Sites: PROJECT DETAILS
56.00
Initiating the Project
143.00
Planning the Project
106.00
Executing the Project
111.00
Controlling andMonitoring the Project
46.00
Closing the Project
Objective of this project was to plan 184 capacity sites that ensure the best fit for network's requirementand secure them for construction. As the project manager, I conducted the scoping session, created WBSand work schedule for the technical team. The key deliverable of this project was the list of finalized andsecured 184 sites. In this project potential candidates were identified for capacity sites, join surveys wereconducted and finally closed on time upon delivering 184 sites to deployment team for construction.
Description
6 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
EngineeringProject Manager
Bi-Sector Antenna Trial: OVERVIEW
Started
Apr 2013Through
Jul 2013
Project Role Primary Industry
880 1911310297sraihan@banglalink.net
Manager/Director
Shehab Raihan
880 1911304121
Bangladesh
1212Dhaka
Bir Uttam Mir Shawkat Sharak
Tiger's Den, House # 4 (SW)
Banglalink Digital Communications Limited
BSS & Capacity Planning Associate Manager
Bi-Sector Antenna Trial: ORGANIZATION DETAILS
Address Line 1
Address Line 2
Address Line 3
Gulshan-1
City State/Providence/Territory Zip/Postal Code
Country
Organization Name
Job Title
Phone Number
Contact Name
Contact Relationship
Contact E-mail Contact Phone Number
7 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
Bi-Sector Antenna Trial: PROJECT DETAILS
34.00
Initiating the Project
108.00
Planning the Project
81.00
Executing the Project
74.00
Controlling andMonitoring the Project
40.00
Closing the Project
Objective of this project was to trial a new radio equipment called Bi-Sector Antenna (BSA) to check itsperformance. I formed the project team, defined the project scope and created a business case of thisproject which was approved by the stakeholders. The key deliverable of this project was the decisionwhether to deploy this new radio equipment in the network. After an intensive team effort to fine tunethe parameter setting, the project was closed on time with a positive feedback.
Description
EngineeringProject Contributor
Huawei Network Modernization: OVERVIEW
Started
Feb 2014Through
Dec 2014
Project Role Primary Industry
8 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
880 1911310297sraihan@banglalink.net
Manager/Director
Shehab Raihan
880 1911304121
Bangladesh
1212Dhaka
Bir Uttam Mir Shawkat Sharak
Tiger's Den, House # 4 (SW)
Banglalink Digital Communications Limited
BSS & Capacity Planning Associate Manager
Huawei Network Modernization: ORGANIZATION DETAILS
Address Line 1
Address Line 2
Address Line 3
Gulshan-1
City State/Providence/Territory Zip/Postal Code
Country
Organization Name
Job Title
Phone Number
Contact Name
Contact Relationship
Contact E-mail Contact Phone Number
Huawei Network Modernization: PROJECT DETAILS
82.00
Initiating the Project
224.00
Planning the Project
179.00
Executing the Project
194.00
Controlling andMonitoring the Project
67.00
Closing the Project
Objective of this project was to modernize the Huawei network with the newly released hardware. As aproject team member, I contributed in project scoping and scheduling. In this project, 1965 old modelHuawei BTSs were identified and planned to be replaced by new model BTSs in order to capitalize theadvanced features. I used to issue parameter tuning WOs for the newly installed BTSs to achieve theagreed GOS in clusters. The project was closed successfully on time when all 1965 BTSs were swapped.
Description
9 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
EngineeringProject Manager
Accessibility Improvement of Khulna Region: OVERVIEW
Started
Nov 2014Through
Jun 2015
Project Role Primary Industry
880 1911310297sraihan@banglalink.net
Manager/Director
Shehab Raihan
880 1911304121
Bangladesh
1212Dhaka
Bir Uttam Mir Shawkat Sharak
Tiger's Den, House # 4 (SW)
Banglalink Digital Communications Limited
BSS & Capacity Planning Deputy Manager
Accessibility Improvement of Khulna Region: ORGANIZATION DETAILS
Address Line 1
Address Line 2
Address Line 3
Gulshan-1
City State/Providence/Territory Zip/Postal Code
Country
Organization Name
Job Title
Phone Number
Contact Name
Contact Relationship
Contact E-mail Contact Phone Number
10 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
Accessibility Improvement of Khulna Region: PROJECT DETAILS
88.00
Initiating the Project
196.00
Planning the Project
162.00
Executing the Project
155.00
Controlling andMonitoring the Project
74.00
Closing the Project
Objective of this project was to improve accessibility KPI performance of Khulna region in order toimprove customer perception. I developed project plan, created schedules for each task, assignedresources for each task and managed any required changes in schedules. The key actions of this projectincluded identification of worst performing cells and implementation of necessary actions until desiredperformance was achieved. After performing an extensive team work, the project was closed on timeupon achieving the agreed GOS.
Description
EngineeringProject Contributor
RF Antenna Modernization: OVERVIEW
Started
Mar 2015Through
Feb 2016
Project Role Primary Industry
11 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
880 1911310297sraihan@banglalink.net
Manager/Director
Shehab Raihan
880 1911304121
Bangladesh
1212Dhaka
Bir Uttam Mir Shawkat Sharak
Tiger's Den, House # 4 (SW)
Banglalink Digital Communications Limited
BSS & Capacity Planning Deputy Manager
RF Antenna Modernization: ORGANIZATION DETAILS
Address Line 1
Address Line 2
Address Line 3
Gulshan-1
City State/Providence/Territory Zip/Postal Code
Country
Organization Name
Job Title
Phone Number
Contact Name
Contact Relationship
Contact E-mail Contact Phone Number
RF Antenna Modernization: PROJECT DETAILS
93.00
Initiating the Project
272.00
Planning the Project
187.00
Executing the Project
212.00
Controlling andMonitoring the Project
85.00
Closing the Project
Objective of this project was to modernize the old RF antennas of the entire network. As a technicallead, I prepared the work schedule and drove the technical team accordingly throughout the project. Inthis project, 11723 old model RF antennas were identified and planned to be replaced by new modeltri-band antennas in order to capitalize the high gain and multiple band compatibility. The project wasclosed on time when all 11723 old antennas were successfully replaced.
Description
12 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
EngineeringProject Manager
Special Event (EID) Management: OVERVIEW
Started
May 2016Through
Sep 2016
Project Role Primary Industry
880 1911310297sraihan@banglalink.net
Manager/Director
Shehab Raihan
880 1911304121
Bangladesh
1212Dhaka
Bir Uttam Mir Shawkat Sharak
Tiger's Den, House # 4 (SW)
Banglalink Digital Communications Limited
Planning Manager
Special Event (EID) Management: ORGANIZATION DETAILS
Address Line 1
Address Line 2
Address Line 3
Gulshan-1
City State/Providence/Territory Zip/Postal Code
Country
Organization Name
Job Title
Phone Number
Contact Name
Contact Relationship
Contact E-mail Contact Phone Number
13 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
Building Professionalism in project management. TM
Project Management InstituteHeadquarters14 Campus Blvd., Newtown Square, PA 19073-3299 USATel: +610-356-4600, Fax: +610-356-4647E-mail: pmihq@pmi.org, Internet: www.pmi.org
Special Event (EID) Management: PROJECT DETAILS
74.00
Initiating the Project
208.00
Planning the Project
141.00
Executing the Project
135.00
Controlling andMonitoring the Project
55.00
Closing the Project
Objective of this project was to handle the largest national event of Bangladesh (EID) to meet certainGOS. As the project manager, I created the high level scope of the project and presented it to seniormanagement for the approval. I worked with cross functional teams to collect detailed requirements,created project schedules, monitored the work progress against the planned schedules and identifiedrequired changes. The project was closed on time upon achieving the agreed GOS.
Description
Project Management Education:
36.00Hours
Apr 2017Ended
Mar 2017Started
PMP Exam Preparation Course with Tips & TricksTitle
STC BANGLADESHInstitution
PMP Exam Preparation Course with Tips & Tricks: EDUCATION COURSE
14 14Page of Generated: 04 Aug 2017Person: #4999582/Application: #3414731
top related