nasa goddard space flight center’s wallops flight facility

Post on 23-Feb-2016

60 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

NASA Goddard Space Flight Center’s Wallops Flight Facility. A View of Wallops Bill Wrobel Director, Wallops Flight Facility October 3, 2012. Wallops Flight Facility Snapshot . Facility: >6000 acres on VA’s Eastern Shore Established in 1945 Assets: >$1.2B - PowerPoint PPT Presentation

TRANSCRIPT

Goddard Space Flight Center

1

NASA Goddard Space Flight Center’s

Wallops Flight FacilityA View of Wallops

Bill WrobelDirector, Wallops

Flight FacilityOctober 3, 2012

2

Wallops Flight Facility Snapshot • Facility:

• >6000 acres on VA’s Eastern Shore• Established in 1945 • Assets: >$1.2B

• Mission: Provide capabilities & services to enable science, technology, and education from space• Suborbital & small orbital “research carriers”• Mission operations (Research Range, orbital tracking)• Technology development• Earth science research• Educational flight projects

• Economic Impact: • NASA Budget: ~$218M (FY12)• NASA Workforce: 270 Civil Servants, ~800 contractors• Tenant Workforce: ~600 personnel • National Impact: ~$400M annually, >3100 jobs

Wallops Mission

3

4

Sounding Rocket Program

• 20 missions using 8 different vehicle configurations conducted from 4 launch sites during FY12– 25 missions scheduled for FY13

5

Recent Sounding Rocket Mission Highlights

• ATREX – Anomalous Transport Rocket Experiment– 5 rockets launched on 80 second

intervals– Study of upper atmosphere jet

stream

• IRVE 3 – Inflatable Reentry Vehicle Experiment– Technology demonstration of

deployed inflatable decelerator for atmospheric entry

6

Balloon Program

• 9 successful missions conducted from 3 launch sites during FY12– Includes test flight of SF-490

balloon film– Includes test flight of

Wallops Arc Second Pointer

7

New Wallops Aircraft

• C-23 Sherpa – supporting airborne science

• UH-1H Helicopter – providing Launch Range surveillance & clearance– 3-year loan from LaRC

• T-34 Mentor – providing chase plane support for Global Hawks

• C-130 Hercules (coming soon) – To provide logistics & possibly science missions

8

Hurricane & Severe Storm Sentinel (HS-3)

• Global Hawk UAS flown from WFF during September to conduct hurricane studies– 1st of 3-year program

• Wallops Global Hawk Operations Center under construction at WFF for future campaigns

9

ER-2 Operations At Wallops

• DFRC’s ER-2 at WFF in September to support Minimum Anticipated Biological Effect Level (MABEL)

• Included flights over eastern & mid-western U.S.

• Instruments included GSFC’s CATS & CPL

10

ISS CREAM

• WFF managing an SMD-sponsored ISS experiment– U of MD’s Cosmic Ray

Energetics & Mass (CREAM)

• Will launch on a SpaceX Falcon 9– Payload readiness date:

9/2014

CREAM Interface Location on JEM EF

(EFU2)

JEM EF

CREAM Instrument Structure

11

Low-Density Supersonic Decelerator (LDSD)

• WFF supporting an OCT-sponsored program to demonstrate planetary reentry using inflatable structures

• Test article dropped from balloon, and accelerated using rocket– 4 flights from Hawaii in 2014-5

12

Highlights of Wallops Education in 2012

Wallops Rocket Academy for Teachers and Students (WRATS)

Wallops Balloon Experience for Education (WBEE)

RockOn!

HASP

FIRST Robotics

University , Community College and High School Internships

HS3 Workshop

Take a Child to Work

SEEC

9/19/12

13

Major Research Range Activities

• Operationally Responsive Space-3 (ORS-3)– Minotaur I launch for Operationally

Responsive Space Office– Launch date in between July-

October 2013

• Lunar Atmosphere & Dust Experiment Explorer (LADEE)– Lunar orbiting spacecraft launched

on Minotaur V in Aug. 2013– Instruments managed by GSFC

14

Antares

• Preparations continue for initial flights of Antares from WFF to resupply cargo to the ISS– Orbital Sciences began vehicle

development at WFF in Spring 2011– Mid-Atlantic Regional Spaceport

(MARS) turned over the new launch complex to Orbital last week

• Schedule– Fueling testing planned during October– Hot Fire Test expected in November– 1st launch possible before end of

December

15

Pad 0A Redevelopment

Before

After

16

Antares Processing in the Horizontal Integration Facility (HIF)

16

17

Antares Rollout and Transporter Erector Launcher Operations

17

18

Cygnus Processing in H-100/Payload Processing Facility

19

Recent Beach Replenishment

20

top related