naval oceanographic office wg/csab update lamar a. russell april 18-19 th 2012 approved for public...
Post on 02-Jan-2016
216 Views
Preview:
TRANSCRIPT
Naval Oceanographic Office
WG/CSAB update
Lamar A. RussellLamar A. RussellApril 18-19April 18-19thth 2012 2012
Approved for public release.
Distribution is unlimited.
Outline
Current satellite & In-Situ data sources/productsCurrent satellite & In-Situ data sources/products
Data retrievals and observationsData retrievals and observations
New and Future Satellites New and Future Satellites
NAVO Ocean Modeling/Forecast StatusNAVO Ocean Modeling/Forecast Status
NPP Readiness and JPSS IDPS NPP Readiness and JPSS IDPS Approved for public release.
Distribution is unlimited.
Satellite Data Sources & Products
Data SourcesData SourcesNOAA/FNMOC (NOAA/FNMOC ( DoD OTN) DoD OTN)
AVHRR/HIRS - MetOp, N-18, N-19AVHRR/HIRS - MetOp, N-18, N-19Jason- 2/OSTM Jason- 2/OSTM MODIS MODIS
AQUA AQUA SSM/I EDRSSM/I EDR SSM/IS EDR SSM/IS EDRMTSATMTSAT
NRTPE (NASA/NOAA)NRTPE (NASA/NOAA)MODIS AQUAMODIS AQUA
GOES direct readout (NAVO)GOES direct readout (NAVO)
ESA ESA Envisat (altimeter & MERISEnvisat (altimeter & MERIS- offline 08 Apr 12)- offline 08 Apr 12)
JPLJPL Jason-1 (offline – 16 Feb 2012)Jason-1 (offline – 16 Feb 2012)GHRSST ( AATSR, MSG, MSG2, GHRSST ( AATSR, MSG, MSG2, AMSRE AMSRE
(died – 10/4/11)(died – 10/4/11)))
ProductsSST Retrievals
POES SST
GOES SST
Image Analysis
OFA
Annotated AVHRR
Altimetry
SSHA
SWH
WS
Ocean Optics
Visibility
Attenuation Approved for public release.
Distribution is unlimited.
In-Situ Data Sources & Products
Data SourcesData Sources
Service ArgoService Argo
CTDsCTDs
GlidersGliders
Profiling FloatsProfiling Floats
XBTsXBTs
Marine MammalsMarine Mammals
Morred BuoysMorred Buoys
Fixed StationsFixed Stations
Ship ReportsShip Reports
Drifting BuoysDrifting Buoys
ArgosArgos
ProductsBUFR
Character Code (model ingest)
Web Products
CustomersNAVOCENO
Numerical Models
FNMOC
Atmospheric Models
Navy Exercise Support
Non-DoD
AcademiaApproved for public release.
Distribution is unlimited.
Real Time Data Handling Systems
Current and Future Challenges/Issues
Wave Spectra Sensors ( gliders & drifters ) Sharc gliders Iridium buoys / profiling floats Emerging Technologies New data formats for sensors on emerging technology Standardizing data formats ( IOOS, glider groups, marine mammal data ) New data Delivery methods ( Iridium SBD, PPP, … ) Meeting DISA IA requirements for incoming data
Approved for public release.
Distribution is unlimited.
Real-Time Altimetry Retrievals
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
22
-Fe
b-1
2
29
-Fe
b-1
2
7-M
ar-1
2
14
-Ma
r-12
21
-Ma
r-12
28
-Ma
r-12
4-A
pr-1
2
11
-Ap
r-12
To
tal #
of
Re
trie
vals
pe
r w
ee
k
Sea Surface Height
Significant Wave Height
Approved for public release.
Distribution is unlimited.
Real-Time MCSST Retrievals
0
10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
70,000,000
80,000,000
90,000,000
100,000,000
110,000,000
120,000,000
130,000,000
22
-Fe
b-1
2
29
-Fe
b-1
2
7-M
ar-1
2
14
-Ma
r-12
21
-Ma
r-12
28
-Ma
r-12
4-A
pr-1
2
11
-Ap
r-12
To
tal #
of
Re
trie
vals
pe
r w
ee
k
FRAC
LAC19
GAC18
GAC19
GACMTA
Approved for public release.
Distribution is unlimited.
Real-Time Sub-surface Observations
1
10
100
1,000
10,000
100,000
1,000,000
10,000,000
100,000,000
22
-Fe
b-1
2
29
-Fe
b-1
2
7-M
ar-1
2
14
-Ma
r-12
21
-Ma
r-12
28
-Ma
r-12
4-A
pr-1
2
11
-Ap
r-12
Tot
al #
of R
etrie
vals
pe
r w
eek
Altimeter SSH XBTFloats CTD's singleCTD's multiple Current's singleCurrent's multiple GlidersMarine Mammals
Approved for public release.
Distribution is unlimited.
1
10
100
1,000
10,000
100,000
1,000,000
10,000,000
100,000,000
22
-Fe
b-1
2
29
-Fe
b-1
2
7-M
ar-1
2
14
-Ma
r-12
21
-Ma
r-12
28
-Ma
r-12
4-A
pr-1
2
11
-Ap
r-12
To
tal #
of
Re
trie
vals
p
er
we
ek
SatSST
Altimeter SWH
Drifting Buoys
Fixed Buoys
Ship Reports
Real-Time Surface Observations
Approved for public release.
Distribution is unlimited.
New and Future Satellite/Data Feeds
GOES-15 (2011 - 2017)GOES-15 (2011 - 2017)Launched 06 Dec 2011Launched 06 Dec 2011Replacement of GOES-11Replacement of GOES-11Operational implementationOperational implementation – 08 March 2012 – 08 March 2012
NPP (2011 - )NPP (2011 - )Launched 28 Oct 2011Launched 28 Oct 2011Initial data receipt – 05 March 2012Initial data receipt – 05 March 2012COMMS – dedicated OC-12; AFWA COMMS – dedicated OC-12; AFWA NAVO NAVO
AFWA -- Backup Met WindsAFWA -- Backup Met WindsInitial retrievals - March 2012Initial retrievals - March 2012Continuing correlation of GFS and WRF data fields with NOGAPSContinuing correlation of GFS and WRF data fields with NOGAPSCOMMS – dedicated OC-12; AFWA COMMS – dedicated OC-12; AFWA NAVO NAVO
COMS1 (2010 – 2017)COMS1 (2010 – 2017)Launch – May 2010Launch – May 2010
GOCI (Ocean Color) – retrieved from Korea Ocean Research and Development Inititive GOCI (Ocean Color) – retrieved from Korea Ocean Research and Development Inititive (KORDI)(KORDI)
Meteorological Image(MI)r – anticipate acquiring via SeaSpaceMeteorological Image(MI)r – anticipate acquiring via SeaSpace
Approved for public release.
Distribution is unlimited.
New and Future Satellite/Data Feeds (cont.)
Metop-B (2012 -- 2017)Metop-B (2012 -- 2017)Launch – May 2012Launch – May 2012
AltiKa ( 2012 - 2015)AltiKa ( 2012 - 2015)Launch delayed to 3nd quarter 2012 (June 2012)Launch delayed to 3nd quarter 2012 (June 2012)CNMOC/NAVO/NRLSSC Science/Evaluation Team membersCNMOC/NAVO/NRLSSC Science/Evaluation Team membersEUMETSAT will provide operational supportEUMETSAT will provide operational support
Sentinel 3 ( 2014 – 2017)Sentinel 3 ( 2014 – 2017)Launch 2013/14Launch 2013/14Follow-on to EnvisatFollow-on to EnvisatESA primary data provider, EUMETSAT operational supportESA primary data provider, EUMETSAT operational support
Jason-3 ( 2014 – 2019)Jason-3 ( 2014 – 2019)Launch April 2014Launch April 2014Operational support provided by NOAA ( same as Jason-2 )Operational support provided by NOAA ( same as Jason-2 )
Approved for public release.
Distribution is unlimited.
Approved for public release.
Distribution is unlimited.
DSRC Upgrades and NAVOCEANO Model Transitions
“A Taxing Endeavor”
Systems and Operations will be in-flux.
DoD Supercomputing Resource Center (DSRC)Summer 2012 Full Refresh
Both UNCLAS and CLAS mainframes will be replacedUNCLAS daVinci (IBM P6U1)
UNCLAS Einstein (Cray MX5U2)and CLAS PASCAL (IBM P5C1)
Selection to be announced APR 12.
Anticipate 3 of the same - 2 UNCLAS (U1 & U2) and 1 CLAS (C1)
Expected to expand capability 3X from ~34 to ~110 teraflops
Will not know vendor, system, capabilities, etc., until announcement
Small test development system (TDS) to be available APR 12 (128-256 cores)
U1, U2, C1 delivery and testing in JUN 12C1 will be first
May be issues / delays with installation (water cooled– is current cooling adequate?)
First user access ~1 JUL 12
Acceptance by ~1 AUG 12
Pascal (C) gone 30 SEP 12 (contract expires)Could be extended if schedule continues to slip and we have issues
daVinci and Einstein (U) gone 31 DEC 12.
Approved for public release.
Distribution is unlimited.
NAVO Model Ops DSRC Transitions Timetable (Always in Flux)
MID-APR - 30 JUN (2.5 months) - system definition / scope / education / testing
LATE-APR - 01 JUL (2 months) - test cases on TDSLikely lots of competition
Small starter jobs: R-NCOM (64 cpus), SWAN (8 cpus), COAMPS (64 cpus), etc.
Modeler involvement required
01 JUL - 01 OCT (3 months) - move CLAS models (Pascal) to C1OCEAN_QC / NCODA
GNCOM & HYCOM ???
~10 RNCOM, & ~12 CNCOMs
~150 WAMS & WW3 (???, but doubtful)
~150 SWANS
What else (PCTIDES, ...)
MID AUG – END DEC (4.5 months) - move UNCLAS models (daVinci / Einstein) to U1 / U2
First priority is CLAS move, start UNCLAS a month later
Probably move all to U1 with U2 as mirror site
A few less domains than above
Possible exception-- not GNCOM and only move HYCOM 1/12Approved for public release.
Distribution is unlimited.
HYCOM Timetable (preliminary)
1 MAY - OPTEST report completed, submitted, and approved by end of APR.
End MAY- Target UNCLAS HYCOM on Einstein producing pre-operational output OSMEs evaluate throughout month.
MAY - 1 OCT- UNCLAS HYCOM and UNCLAS GNCOM to run in parallel on Einstein/daVinci through the summer. CLAS GNCOM continues as operational model.
OPTEST evaluations continue (F Bub – AutoMetrics-based)
JUL – AUG- CLAS GNCOM transition to the new DSRC system Pascal C1, continues as operational model through summer/fall
Internal Model comparisons
AUG – SEP- CLAS HYCOM will be installed on C1 during the summer DSRC transition
CLAS HYCOM will replace CLAS GNCOM by 30 SEP (If seamless transition)
Pascal scheduled for decommissioning).
OCT - NOV - UNCLAS HYCOM will be installed on new system U1UNCLAS HYCOM will replace GNCOM by DEC.
Approved for public release.
Distribution is unlimited.
NPP Acquisition and ImplementationNPP Acquisition and ImplementationStatusStatus
Launch– Oct 2011Launch– Oct 2011
COMMS (OC-12) online– 5 March 2012COMMS (OC-12) online– 5 March 2012
Data Availability – 5 March 2012Data Availability – 5 March 2012
Pitfalls and ChallengesPitfalls and ChallengesOriginal COMMS requirements six (6) months prior to launch not fulfilledOriginal COMMS requirements six (6) months prior to launch not fulfilled
Initial data throughput 0.5 Mbytes/sec/session @ 20 sessions Initial data throughput 0.5 Mbytes/sec/session @ 20 sessions
Anticipated throughput ~ 45-50 Mbytes/secAnticipated throughput ~ 45-50 Mbytes/sec
Extensive coordination between NAVO and AFWA personnel has not significantly Extensive coordination between NAVO and AFWA personnel has not significantly improved COMMS throughput; 3-4 Mbytes/sec/session @ 8 sessions improved COMMS throughput; 3-4 Mbytes/sec/session @ 8 sessions
WDA-4 JMBL 8/5 is insufficient to validate operational functionality/capacityWDA-4 JMBL 8/5 is insufficient to validate operational functionality/capacity
Approved for public release.
Distribution is unlimited.
Approved for public release.
Distribution is unlimited.
JPSS and IPDS Issues/concernsNavy working with JPSS Program on revised requirements and architectural options for CGS.
What infrastructure is required?
How and what data will be delivered/retrieved?Dedicated COMMS LineCOPC NetworkHow does NFG fit into data delivery (CTO 10-21)
COST!!Who covers what?How much is Navy’s chunk?
NAVOCEANO IDPS facility space is ready and awaitingfinal architectural design.
Questions???