Neutrino Factory Target Vessel Concept. V. Graves Target Studies EVO May 1, 2012. Review – Two Target Vessel Ideas. Solid billet does not provide adequate shielding Continue with shell concept and refine it for IPAC paper. Hollow SS Shell with Tungsten Beads. - PowerPoint PPT Presentation

TRANSCRIPT

Neutrino Factory Target Vessel Concept

V. Graves

Target Studies EVOMay 1, 2012

2 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Review – Two Target Vessel Ideas• Solid billet does not provide adequate shielding

• Continue with shell concept and refine it for IPAC paper

Hollow SS Shell with Tungsten Beads

Machined SS Billet with Cooling Channels

3 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

4 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

5 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

6 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

7 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

8 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Secondary Helium outlet

Primary Helium inlet Primary

Helium outlet

Secondary Helium

inlet

Hg return

Beam pipe

Hg drain

Hg jet inlet

Hg chambervent line

Maintenance Handle

9 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Helium outlet

Helium inlet

Hg return

Beam pipe

Hg drain

Hg jet inlet

Hg chambervent line

10 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

11 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

12 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

13 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

14 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

15 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Comments

• Concept assumes helium cooling – water cooling will add significant complexity because of draining issues• Locating and positioning guides not included yet• Handling will be extremely complicated