newington road pedestrian bridge replacement project june 2014
Post on 09-May-2015
181 Views
Preview:
DESCRIPTION
TRANSCRIPT
Newington Road Pedestrian Bridge Replacement ProjectMount Vernon District
Department of Public Works and Environmental Services
Working for You!
A Fairfax County, VA, publicationJune 2014
Maintenance and Stormwater Management Division
Newington Rd. Pedestrian Bridge Replacement Project
Maintenance and Stormwater Management Division
Project Location Newington Rd. Lorton, Va. Tax Map No: 094.1 ((01)) 0001
Project DetailsDescription:Removal of structurally damaged pedestrian bridge and replacement with a new bridge matching the existing abutments and anchor bolt pattern. This bridge replacement project was paired with another nearby bridge replacement by matching the size and specifications of each replacement bridge for a cost effective bid response from various competing bridge fabricators.
Project Overview: Newington Rd. closure and detour in coordination with FCPS busing schedule and notification to
police and fire and rescue services. Notification to motorists with advance warning message boards. De-energizing electrical power to 180 residences and 1 business with advance notice. Lifting of existing four ton pedestrian bridge over power and communications lines to awaiting
trailer and lifting new bridge into place. Road closure, local power outage, and lifting operations were completed in approximately 1-1/2
hours.
DPWES Project Team: Design Engineer: Bill Schell (MSMD) Project Manager: Richard Markey (MSMD) Construction Supervisor: Sean Geyer (MSMD)
Newington Rd. Pedestrian Bridge Replacement Project
Newington Rd. Pedestrian Bridge Replacement Project
Pre-Construction Condition
Flooded water height
Maintenance and Stormwater Management Division
Both the top cord and lower chord of the structural truss was damaged when a large tree fell on the bridge, which compromised the long term integrity of the bridge.
Construction Photos
Maintenance and Stormwater Management Division
Newington Rd. Pedestrian Bridge Replacement Project
Construction Photos
Maintenance and Stormwater Management Division
Newington Rd. Pedestrian Bridge Replacement Project
Maintenance and Stormwater Management Division
Newington Road Pedestrian Bridge Replacement Project
Before After
Newington Rd. Pedestrian Bridge Replacement Project
Maintenance and Stormwater Management Division
For additional information, contact
Irene Haske, Public Information Officer
703-324-5821, TTY 711
SWPDmail@fairfaxcounty.govwww.fairfaxcounty.gov/dpwes
top related