norwegian supplier of special services to the subsea construction market for numerous of projects....

Post on 28-Mar-2015

218 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Norwegian supplier of special services

to the SubSea construction market

for numerous of projects.

PROJECT PROGRESSand

DELIVERY ON TIMEas governing work policy

using multidisipline personnel.

Major Speciality

Site Follow Up&

Constructionof

SubSea Installationsand

Outfitting Equipment

Close to the market,compatible prices &

unique knowhow

SITE FOLLOW UP

- Site Management- Field Engineering on Structural & Pipe

- QA / QC- Structural Assembly

- Piping & Mechanical Assembly- Paint Systems

- Multidisipline Mechanical Completion- FAT / SIT

- Delivery Documentation

Aggressive approach to evaluate and detecttechnical and construction bottlenecks

affecting ability to deliver on time

CONSTRUCTION

- Isotech have deliveredOutfitting & Mechanical equipment

to several projects.

- Asia PacificIsotech are present working against

frame agreements to bethe preferred contractor for Subsea structure building.

Estimated start up during 2008.

- Europe and AfricaA workshop facility are planned started in the meditterian during

late 2008 / first half 2009with the policy to provide

construction service to the marketto compatible cost and best quality

Isotech’s futurehand in hand with Client needs

SITE FOLLOW UP

- Site Management- Site Manager

- Document Control

- Field Engineering on Structural & Pipe- Drawing Status

- Deliveries / Procurement follow up- Equipment Traceability

- QA / QC- Fabrication Procedures

- NDE Procedures & inspection- Welding, materials & methods

- Inspectors of all categories- Technical clarifications

- Structural Assembly- Building sequence

- Maintenance of dimensional requirements

- Review & comment of drawings

Detect and sort problemsbased on years experience

SITE FOLLOW UP

- Piping & Mechanical Assembly- Piping assembly sequence

- P&ID and Isometric crosscheck- Handling of mechanical items

during fabrication.

- Paint Systems- Follow up & Inspection

- Multidisipline Mechanical Completion- Test-Packs

- Punch-Out activities- MC Documentation

- FAT / SIT- Flushing & Hydrotest follow up.

- Component Integration test follow up.- ROV access follow up.

- Delivery Documentation- Dispatchal Dossiers

Clients highest satisfactionof well performed work at delivery

Text 4

”Hands on” follow up of all activitiesfrom pre-project to delivery

Reference Projects :

- Reliance Gas Manifolds- Fram Øst Oil stroking Manifolds

- Tordis Subsea Separation Module- BP King Boosting Pump Manifolds

- Ormen Lange Manifolds- Vilje PGB

- Dalia Oil Manifolds-Kristin Oil stroking Manifolds

- Troll Oil Manifolds- Thune Templates

- Bonga

Experienced Personnel fromnumerous Topsides, Modules,

Tetherstring, Jack-Up, Livingquarter,Hook-Up, Seabed Dredging

and Other Oil & Gas Projects

Clients

Aker Kvaerner SubseaAker Kvaerner Egersund

Aker Kvaerner MalaysiaNYMO Mekaniske, GrimstadGrenland Offshore, Tønsberg

Grenland Offshore, LangesundKOAB IndustrierNational Oilwell

Tinfors

Clients returningshow our reliability

ISO TECH asMandal, Norway

Office Mandal NorwayPhone : +47 38267797

Fax : +47 38267798Web : www.isotech.no

Mail : isotech@online.no