S.NO PAGE
AA LIST OF PROTOCOLS 2-3
1 OH MILE STONES 4-5
BB
1 CONDENSER TMD+RECOMMISSIONING+FQA+CHEM 6
2 HOT WELL TMD+RECOMMISSIONING+FQA 7
3 DEAERATER TMD+RECOMMISSIONING+FQA+CHEM 8
4 MAIL OIL TANK TMD+RECOMMISSIONING+FQA+CHEM 9
5 DAMPER TANK TMD+RECOMMISSIONING+FQA 10
6 LPH TMD+FQA 11-13
7 HPH TMD+FQA 14-15
8 LUB OIL COOLER TMD+FQA 16-17
9 SEAL OIL COOLER TMD+FQA 18-19
10 H2 COOLER TMD+FQA 20-23
11 BFP MOTOR TMD+FQA 24-25
12 MAIN TURBINE TMD+FQA 26-3013 CEP TMD+FQA 31-32
14 BFP MOTOR TMD+FQA 33-34
15 ECONOMISER BMD+FQA 35
16 CONVECTIVE SUPER HEATER BMD+FQA 36
17 END SUPER HEATER BMD+FQA 37
18 PLATEN SUPER HEATER BMD+FQA 38
19 COAL BURNER BMD+FQA 39
20 OIL BURNER BMD+FQA 40
21 BOILER EXPANSION MONITORING BMD+RECOMMISSIONING 41
22 BOILER DRUM INTERNALS BMD+RECOMMISSIONING+FQA+CHEM 42
23 APH CLEANLINESS BMD+RECOMMISSIONING 43-44
24 FD FAN BMD+OPRN+C&I+FQA 45-46
25 ID FAN BMD+OPRN+C&I+FQA 47-48
CC
1 GT MULSIFIER TMD+RECOMMISSIONING 49
2 UAT MULSIFIER TMD+RECOMMISSIONING 50
DD BOILER TUBE THICKNESS BMD+FQA 51
EE AIR/FLUE GAS DAMPERS BMD+RECOMMISSIONING+C&I 52-55
FF
1 TURBINE SIDE TMD+RECOMMISSIONING+EMD+C&I 56-75
2 BOILER SIDE BMD+RECOMMISSIONING+EMD+C&I 76-90
GG HT MOTORS EMD+CONTRACTOR 91-124
VALVES
LIST OF OH PROTOCOLS
DESCRIPTION
JOINT INSPECTIONS
MULSIFIERS
INDEX
-
7/31/2019 Nspcl Durg Protocol
2/125
NSPCL - DURGAPUR
Page 1 of 1
LIST OF PROTOCOLS
UNIT- OVERHAUL
NSPCL DURGAPUR
-
7/31/2019 Nspcl Durg Protocol
3/125
NSPCL - DURGAPUR
Page 2 of 2
LIST OF OH PROTOCOLSINDEX
S.NO DESCRIPTION PAGE
AA LIST OF PROTOCOLS 2-3
1 OH MILE STONES 4-5
BB JOINT INSPECTIONS
1 CONDENSER TMD+RECOMMISSIONING+FQA+CHEM 6
2 HOT WELL TMD+RECOMMISSIONING+FQA 7
3 DEAERATER TMD+RECOMMISSIONING+FQA+CHEM 8
4 MAIL OIL TANK TMD+RECOMMISSIONING+FQA+CHEM 9
5 DAMPER TANK TMD+RECOMMISSIONING+FQA 10
6 LPH TMD+FQA 11-13
7 HPH TMD+FQA 14-15
8 LUB OIL COOLER TMD+FQA 16-17
9 SEAL OIL COOLER TMD+FQA 18-19
10 H2 COOLER TMD+FQA 20-23
11 BFP MOTOR TMD+FQA 24-25
12 MAIN TURBINE TMD+FQA 26-30
13 CEP TMD+FQA 31-32
14 BFP MOTOR TMD+FQA 33-34
15 ECONOMISER BMD+FQA 35
16 CONVECTIVE SUPER HEATER BMD+FQA 36
17 END SUPER HEATER BMD+FQA 37
18 PLATEN SUPER HEATER BMD+FQA 38
19 COAL BURNER BMD+FQA 3920 OIL BURNER BMD+FQA 40
21 BOILER EXPANSION MONITORING BMD+RECOMMISSIONING 41
22 BOILER DRUM INTERNALS BMD+RECOMMISSIONING+FQA+CHEM 42
23 APH CLEANLINESS BMD+RECOMMISSIONING 43-44
24 FD FAN BMD+OPRN+C&I+FQA 45-46
25 ID FAN BMD+OPRN+C&I+FQA 47-48
CC MULSIFIERS
1 GT MULSIFIER TMD+RECOMMISSIONING 49
2 UAT MULSIFIER TMD+RECOMMISSIONING 50
DD BOILER TUBE THICKNESS BMD+FQA 51
EE AIR/FLUE GAS DAMPERS BMD+RECOMMISSIONING+C&I 52-55
-
7/31/2019 Nspcl Durg Protocol
4/125
NSPCL - DURGAPUR
Page 3 of 3
FF VALVES
1 TURBINE SIDE TMD+RECOMMISSIONING+EMD+C&I 56-75
2 BOILER SIDE BMD+RECOMMISSIONING+EMD+C&I 76-90
GG HT MOTORS EMD+CONTRACTOR 91-124
-
7/31/2019 Nspcl Durg Protocol
5/125
NSPCL - DURGAPUR
Page 4 of 4
UNIT- OVERHAUL MILESTONES ( ACTUAL)
SN ACTIVITY ACTUAL DATE/TIME REMARKS IF ANY
1 UNIT STOPPED
2 BOILER AIR LEAK DETECTION TEST
3 H2 PURGE OUT
4 STOPPAGE OF BARRING GEAR
5 SEAL OIL SYSTEM STOPPED
6 GENERATOR ROTOR THREAD OUT
7 BOILER HYDRO TEST-1
8BOILER HYDRO TEST-2 IN PRESENCE OFBOILER INSPECTOR
9 ESP AIR CHARGING PASS-A,& B
10 CONDENSER FLOOD TEST-1
11 GENERATOR ROTOR THREAD IN
12 FURNACE AIR TIGHTNESS TEST-1
13 TSI CALIBRATION COMPLETED
14 CONDENSER FLOOD TEST-2
15 FURNACE AIR TIGHTNESS TEST-2
16 TG LUB OIL FLUSHING
17 SEAL OIL SYS CHARGING
18 TG ON BARRING GEAR
19 GENERATOR AIR TIGHTNESS TEST-1
20 BOILER LIGHT UP
21 TG ROLLING
22 SAFETY VALVES SETTING
-
7/31/2019 Nspcl Durg Protocol
6/125
NSPCL - DURGAPUR
Page 5 of 5
23 TURBINE ROLLING COMPLETED
24 OVERSPEED TEST
25 ELECTRICAL TESTING
26 UNIT SYNCHRONIZATION
27
28
29
30
31
32
33
34
35
36
-
7/31/2019 Nspcl Durg Protocol
7/125
NSPCL - DURGAPUR
Page 6 of 6
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE-
Equipment: CONDENSER
Nature of inspection:
Remarks:
Status:
Total Nos of tube Plugged (after O/H) = _____ Nos.
Total Nos of tube replaced with New Tubes = _____ Nos
After replacing the tubes cleanliness Checked and found ( OK / NOT OK )
Clearance given to Box up. ( Yes / No )
Inspected By:
_______________ ________________ _______________MM OPN FQA
-
7/31/2019 Nspcl Durg Protocol
8/125
NSPCL - DURGAPUR
Page 7 of 7
PROTOCOL
HOTWELL CLEANLINESS INSPECTION
UNIT# DATE: TIME:
OBSERVATIONS:
ACTION TO BE TAKEN:
DEPT RECOMMISSIONING TMD CHEMISTRY
SIGN
NAME
DESIGN
-
7/31/2019 Nspcl Durg Protocol
9/125
NSPCL - DURGAPUR
Page 8 of 8
PROTOCOL
DEARATOR INTERNAL INSPECTION
UNIT # DATE: TIME:
OBSERVATIONS:
CONDITION OF TRAYS:
INSPECTION OF WELDING JOINT BY NDT TEST AFTER EVERY 5 YEAR
ACTION TO BE TAKEN:
DEPT NAME DESGN SIGN
RECOMMISSIONING
TMD
C&I
CHEMISTRY
FQA
-
7/31/2019 Nspcl Durg Protocol
10/125
NSPCL - DURGAPUR
Page 9 of 9
PROTOCOL
MAIN OIL TANK INSPECTION (IF APPLICABLE)
UNIT # DATE: TIME:
OBSERVATION:
ACTION TAKEN:
DEPT NAME DESGN SIGN
RECOMMISSIONING
C&I
CHEMISTRY
TMD
FQA
-
7/31/2019 Nspcl Durg Protocol
11/125
NSPCL - DURGAPUR
Page 10 of 10
PROTOCOL
DAMPER TANK INTERNAL INSPECTION ONLY WHENENTIRE OIL IS DRAINED
UNIT# DATE: TIME:
OBSERVATIONS:
ACTION TO BE TAKEN:
DEPT RECOMMISSIONING TMD CHEMISTRY
SIGN
NAME
DESIGN
-
7/31/2019 Nspcl Durg Protocol
12/125
NSPCL - DURGAPUR
Page 11 of 11
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: LP HEATER # 1
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Leakage was found in LP HEATER # 1: YES / NO
3) Cleaning done and gasket replaced:
4) No of Tubes plugged :
5) Total No of tubes :
6) % of tubes of plugged
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
13/125
NSPCL - DURGAPUR
Page 12 of 12
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: LP HEATER # 2
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Leakage was found in LP HEATER # 2: YES / NO
3) Cleaning done and gasket replaced:
4) No of Tubes plugged :
5) Total No of tubes :
6) % of tubes of plugged
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
14/125
NSPCL - DURGAPUR
Page 13 of 13
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: LP HEATER # 3
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Leakage was found in LP HEATER # 3: YES / NO
3) Cleaning done and gasket replaced:
4) No of Tubes plugged :
5) Total No of tubes :
6) % of tubes of plugged
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
15/125
NSPCL - DURGAPUR
Page 14 of 14
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: HP HEATER 1 IF OPENED
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Leakage was found in HP HEATER 1: YES / NO
3) No of Leaking tubes :
4) Total No of tubes :
5) Total % of tubes of plugged
6) Partition Plate condition after repair : YES /NOChecked and found ok
7) Blue matching of the threaded ring: YES /NOChecked ok
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
16/125
NSPCL - DURGAPUR
Page 15 of 15
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: HP HEATER 2 IF OPENED
Nature of inspection: VISUAL
Remarks:
1. Leakage detection test done:
2. Leakage was found in HP HEATER 1: YES / NO
3. No of Leaking tubes :
4. Total No of tubes :
5. Total % of tubes of plugged
6. Partition Plate condition after repair : YES /NOa. Checked and found ok
7. Blue matching of the threaded ring: YES /NOChecked ok
Inspected By:
_______________ _______________
TMD FQA
-
7/31/2019 Nspcl Durg Protocol
17/125
NSPCL - DURGAPUR
Page 16 of 16
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: LUB OIL COOLER 1
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Leakage was found in COOLER 1: YES / NO
3) No of Leaking tubes :
4) Total No of tubes :
5) Total % of tubes of plugged
6) Through cleaning done checked : YES/NO
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
18/125
NSPCL - DURGAPUR
Page 17 of 17
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: LUB OIL COOLER 2
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Leakage was found in COOLER 2: YES / NO
3) No of Leaking tubes :
4) Total No of tubes :
5) Total % of tubes of plugged
6) Through cleaning done checked : YES/NO
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
19/125
NSPCL - DURGAPUR
Page 18 of 18
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: SEAL OIL COOLER 1
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Hydro Test Carried Out at Pressure : ____________
3) Leakage was found in COOLER 1: YES / NO
4) No of leakage tubes :
5) Final Hydro Test carried Out at Pressure :____________
6) Any leakages observed : YES/NO
7) Total No of tubes :
8) Total % of tubes of plugged
9) Through cleaning done checked : YES/NO
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
20/125
NSPCL - DURGAPUR
Page 19 of 19
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: SEAL OIL COOLER 2
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Hydro Test Carried Out at Pressure : ____________
3) Leakage was found in COOLER 2: YES / NO
4) No of leakage tubes :
5) Final Hydro Test carried Out at Pressure :____________
6) Any leakages observed : YES/NO
7) Total No of tubes :
8) Total % of tubes of plugged
9) Through cleaning done checked : YES/NO
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
21/125
NSPCL - DURGAPUR
Page 20 of 20
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: HYDROGEN COOLER 1
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Hydro Test Carried Out at Pressure : ____________
3) Leakage was found in COOLER 1: YES / NO
4) No of leakage tubes :
5) Final Hydro Test carried Out at Pressure :____________
6) Any leakages observed : YES/NO
7) Total No of tubes :
8) Total % of tubes of plugged
9) Through cleaning done checked : YES/NO
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
22/125
NSPCL - DURGAPUR
Page 21 of 21
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: HYDROGEN COOLER 2
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Hydro Test Carried Out at Pressure : ____________
3) Leakage was found in COOLER 2: YES / NO
4) No of leakage tubes :
5) Final Hydro Test carried Out at Pressure :____________
6) Any leakages observed : YES/NO
7) Total No of tubes :
8) Total % of tubes of plugged
9) Through cleaning done checked : YES/NO
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
23/125
NSPCL - DURGAPUR
Page 22 of 22
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: HYDROGEN COOLER 3
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Hydro Test Carried Out at Pressure : ____________
3) Leakage was found in COOLER 3: YES / NO
4) No of leakage tubes :
5) Final Hydro Test carried Out at Pressure :____________
6) Any leakages observed : YES/NO
7) Total No of tubes :
8) Total % of tubes of plugged
9) Through cleaning done checked : YES/NO
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
24/125
NSPCL - DURGAPUR
Page 23 of 23
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: HYDROGEN COOLER 4
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Hydro Test Carried Out at Pressure : ____________
3) Leakage was found in COOLER 4: YES / NO
4) No of leakage tubes :
5) Final Hydro Test carried Out at Pressure :____________
6) Any leakages observed : YES/NO
7) Total No of tubes :
8) Total % of tubes of plugged
9) Through cleaning done checked : YES/NO
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
25/125
NSPCL - DURGAPUR
Page 24 of 24
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: BFP 1 MOTOR COOLERS
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Hydro Test Carried Out at Pressure : ____________
3) Leakage was found in COOLER 4: YES / NO
4) No of leakage tubes :
5) Final Hydro Test carried Out at Pressure :____________
6) Any leakages observed : YES/NO
7) Total No of tubes :
8) Total % of tubes of plugged
9) Through cleaning done checked : YES/NO
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
26/125
NSPCL - DURGAPUR
Page 25 of 25
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: Date:
Equipment: BFP 2 MOTOR COOLERS
Nature of inspection: VISUAL
Remarks:
1) Leakage detection test done:
2) Hydro Test Carried Out at Pressure : ____________
3) Leakage was found in COOLER 4: YES / NO
4) No of leakage tubes :
5) Final Hydro Test carried Out at Pressure :____________
6) Any leakages observed : YES/NO
7) Total No of tubes :
8) Total % of tubes of plugged
9) Through cleaning done checked : YES/NO
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
27/125
NSPCL - DURGAPUR
Page 26 of 26
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE:
Equipment: MAIN TURBINE
Nature of inspection: ALIGNMENT READINGS IF APPLICABLE
Remarks:
POSITION LEFT RIGHT TOP BOTTOM
0
90
180
270
TOTAL
AVERAGE
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
28/125
NSPCL - DURGAPUR
Page 27 of 27
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE:
Equipment: MAIN TURBINE
Nature of inspection: COUPLED RUN OUT READINGS
Remarks:
HOLE NO GEN COUP TURBCOUP
JOUR 2 JOUR 3 JOUR 1
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
29/125
NSPCL - DURGAPUR
Page 28 of 28
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE:
Equipment: MAIN TURBINE
Nature of inspection: BUMP CHECK READINGS
Remarks:
DURING DISMANTLING
TOWARDS MOP
TOWARDS GEN
TOTAL
AFTER BOX UP
TOWARDS MOP
TOWARDS GEN
TOTAL
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
30/125
NSPCL - DURGAPUR
Page 29 of 29
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE:
Equipment: MAIN TURBINE
Nature of inspection: AXIAL FLOAT READINGS
Remarks:
DURING DISMANTLING
TOWARDS MOP
TOWARDS GEN
TOTAL
AFTER BOX UP
TOWARDS MOP
TOWARDS GEN
TOTAL
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
31/125
NSPCL - DURGAPUR
Page 30 of 30
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE:
Equipment: MAIN TURBINE
Nature of inspection: BEARING CLEARANCES
Remarks:
BRG NO SOC TOC INTERFERENCE
L R BRG TOYOKE
YOKE T0COVER
123
DP TEST OF BEARINGS OBSERVATION:
UT TEST OF BEARINGS OBSERVATION:
Inspected By:
_______________ _______________TMD FQA
-
7/31/2019 Nspcl Durg Protocol
32/125
NSPCL - DURGAPUR
Page 31 of 31
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE:
Equipment: CEP # 1
Nature of inspection: VISUAL
Remarks:
Before dismantling (Initial Reading)
AXIAL RADIAL
After Alignment (Final Reading)
AXIAL RADIAL
TOTAL FLOAT OF THE PUMP:
COUPLING GAP:
Inspected By:
_______________ ________________ _____________TMD OPN FQA
-
7/31/2019 Nspcl Durg Protocol
33/125
-
7/31/2019 Nspcl Durg Protocol
34/125
NSPCL - DURGAPUR
Page 33 of 33
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE:
Equipment: BFP # 1 (IF APPLICABLE)
Nature of inspection: VISUAL
Remarks:
Before dismantling (Initial Reading)
AXIAL RADIAL
After Alignment (Final Reading)
AXIAL RADIAL
BRG NO SOC TOCL R
PUMP DE
PUMP NDEMOTOR DEMOTOR NDE
1. CLEARANCE OF THE BALANCING DISC:
2. TOTAL FLOAT OF THE PUMP WITHOUT THRUST BEARING:
3. TOTAL FLOAT OF THE PUMP WITH THRUST BEARING:
Inspected By:
_______________ ________________ _____________TMD OPN FQA
-
7/31/2019 Nspcl Durg Protocol
35/125
NSPCL - DURGAPUR
Page 34 of 34
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE:
Equipment: BFP # 2 (IF APPLICABLE)
Nature of inspection: VISUAL
Remarks:
Before dismantling (Initial Reading)
AXIAL RADIAL
After Alignment (Final Reading)
AXIAL RADIAL
BRG NO SOC TOCL R
PUMP DEPUMP NDEMOTOR DEMOTOR NDE
4. CLEARANCE OF THE BALANCING DISC:
5. TOTAL FLOAT OF THE PUMP WITHOUT THRUST BEARING:
6. TOTAL FLOAT OF THE PUMP WITH THRUST BEARING:
Inspected By:
_______________ ________________ _____________TMD OPN FQA
-
7/31/2019 Nspcl Durg Protocol
36/125
NSPCL - DURGAPUR
Page 35 of 35
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE:
Equipment: ECONOMISER
Nature of inspection:
Remarks:
Observations (IF Any)
Joint Tube thickness survey carried out with BMD/FQA ( Y / N )
Tube thickness survey :
Total Joints cut = _____ Nos
Total Joints prepared = _____ Nos
Radiography done on = _____ Tubes
Inspected By:
_______________ ________________ _____________BMD OPN FQA
-
7/31/2019 Nspcl Durg Protocol
37/125
NSPCL - DURGAPUR
Page 36 of 36
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE
Equipment: CONVECTIVE SUPER HEATER
Nature of inspection:
Remarks:
After cleaning of second pass, following observations done
(I) some of the coils were interfering on its lateralmovement (II) in some of the coils slight impression ofclits was observed.(III) Some of the coils were found misaligned(IV) Lot of clits was found in damage condition.(V) Bowing was observed in few coils.
Joint Tube thickness survey carried out with BMD/FQA:
Tube thickness survey of all approachable bends:towards front wall(swayed side) carried out and try to cut which thickness were < 20 %.
Total No of Joints cut = _______ Nos Total No of Joints prepared = _______ Nos
Radiography done = _______ Tubes
Checking the report of radiography by BMD:
Clearance is given for Hydro test.
Inspected By:
_______________ ________________ _____________BMD OPN FQA
-
7/31/2019 Nspcl Durg Protocol
38/125
NSPCL - DURGAPUR
Page 37 of 37
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE:
Equipment: END SUPER HEATER
Nature of inspection:
Remarks:
After cleaning of second pass, following observations done
(I) Over heating were observed in some of the coils.(II) Some of the coils were twisted condition.(IV) Lot of clits was found in damage condition.(V) Bowing was observed in few coils.
Joint Tube thickness survey carried out with BMD/FQA:
Tube thickness survey of all approachable bends:towards front wall(swayed side) carried out and try to cut which thickness were < 20 %.
Total No of Joints cut = _______ Nos
Total No of Joints prepared = _______ Nos
Radiography done = _______ Tubes
Checking the report of radiography by BMD:
Clearance is given for Hydro test.
Inspected By:
_______________ ________________ _____________MM OPN FQA
-
7/31/2019 Nspcl Durg Protocol
39/125
NSPCL - DURGAPUR
Page 38 of 38
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE
Equipment: PLATEN SUPER HEATER
Nature of inspection:
Remarks:
After cleaning of second pass, following observations done(I) Over heating were observed in some of the coils.(II) Some of the coils were interfering on its lateral
movement (II) in some of the coils slight impression ofclits was observed.(III) Some of the coils were found misaligned and one ofthem was twisted condition.(IV) Lot of clits was found in damage condition.(V) Bowing was observed in few coils.
Joint Tube thickness survey carried out with BMD/FQA:
Tube thickness survey of all approachable bends:towards front wall(swayed side) carried out and try to cut which thickness were < 20 %.
Total No of Joints cut = _______ Nos
Total No of Joints prepared = _______ Nos
Radiography done = _______ Tubes
Checking the report of radiography by BMD:
Clearance is given for Hydro test.
Inspected By:
_______________ ________________ _____________MM OPN FQA
-
7/31/2019 Nspcl Durg Protocol
40/125
NSPCL - DURGAPUR
Page 39 of 39
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE
Equipment: COAL BURNER
Nature of inspection: TILTING OF COAL BURNERS
After cleaning of second pass, following observations done
SN Description CORNER-1 CORNER-2 CORNER-3 CORNER-4
TILT OF BURNER
MILL 1
MILL 2
MILL 31
MILL 4
CONDITION OF BURNERS
MILL 1
MILL 2
MILL 32
MILL 4
Remarks (if any) :
DEPT NAME SIGNATURE DESIGNATION
FQA
BMD
-
7/31/2019 Nspcl Durg Protocol
41/125
NSPCL - DURGAPUR
Page 40 of 40
PROTOCOL OF JOINT INSPECTION DURING OVERHAULING
UNIT NO: DATE
Equipment: OIL BURNER
Nature of inspection: CONDITION OF OIL BURNER
After cleaning of second pass, following observations done
SN Description
OIL BURNER 1
OIL BURNER 2
OIL BURNER 3
OIL BURNER 4
OIL BURNER 5
OIL BURNER 6
OIL BURNER 7
OIL BURNER 8
Other Remarks (If Any) :
DEPT NAME SIGNATURE DESIGNATION
FQA
BMD
-
7/31/2019 Nspcl Durg Protocol
42/125
NSPCL - DURGAPUR
Page 41 of 41
PROTOCOL BOILER EXPANSION MONITORING:
UNIT# DATE: TIME:
ACTIVITY:BOILER EXPNSION CONSTRAINTS REMOVED & EXPANSION INDICATORS PROVIDED
AT ALL LOCATIONS
SCOPE : FURNACE 1st & 2nd PASS
S.NO DESCRIPTION REMARKS
1
2
3
4
5
6
7
8
9
10
DEPT NAME DESIGN SIGNATURE
OPERATION
BMD
EEMG
-
7/31/2019 Nspcl Durg Protocol
43/125
NSPCL - DURGAPUR
Page 42 of 42
PROTOCOL
BOILER DRUM INTERNAL INSPECTION
UNIT: DATE:
ACTIVITY: DRUM CLEANLINESS CHECKING
SCOPE: DRUM INTERNALS
SN DESCRIPTION REMARKS
1 INTERNAL CLEANLINESS
2PROPER FIXINGOF INTERNALS
3WELD CRACK OR ANY OTHER
DAMAGES
4ANY POSSIBILITY OF WATERCARRY OVER
DEPT NAME DESGN SIGN
OPNBMD
CHEMISTRY
FQA
-
7/31/2019 Nspcl Durg Protocol
44/125
NSPCL - DURGAPUR
Page 43 of 43
PROTOCOL
AIR HEATER CLEANLINESS
UNIT: DATE:
AIR HEATER: 1
ACTIVITY: APHS INTERNAL INSPECTION
SCOPE: ALL AIR PREHEATERS
SN DESCRIPTION STATUS REMARKS
1. ALL FOREIGN MATERIALS ARE
REMOVED FROM THE AIR
HEATER AND THE BASKETS
2. AIRHEATER BASKETS ARE FREE
FROM ASH PARTICLES
3. AIRHEATER BASKETS ARE FREE
FROM OIL TRACES AND OTHER
COMBUSTIBLE MATERIAL.
4. APH HOPPER &
FLUSHING
CHECKED AND CERTIFIED BY
NAME DESIGNATION SIGNATURERECOMMISSIONING
BOILER MAINT
-
7/31/2019 Nspcl Durg Protocol
45/125
-
7/31/2019 Nspcl Durg Protocol
46/125
NSPCL - DURGAPUR
Page 45 of 45
PROTOCOL FOR FD FAN #1
SN DescriptionSubDescription
STATUS BEFORE O/H Description of Job done
Inlet Duct1 DUCTSOutlet DuctInlet Damper
2 Dampers OutletDamperInlet
3ExpansionJoints Outlet
4 INSULATION5 CASING6 IMPELLER
Fan DE Brg7 Bearings
Fan NDE Brg8 Suction Cone9 OIL COOLER
DE bearing10
BearingClearanceIn mm
NDE bearing
11 Coupling Coupling gap12 Oil
13
Alignment
reading
Axial Radial
Inspected By
M/M OPN CONTRACTOR FQA
NAMESIGNATURE
DATE
-
7/31/2019 Nspcl Durg Protocol
47/125
NSPCL - DURGAPUR
Page 46 of 46
PROTOCOL FOR FD FAN #2
SN DescriptionSubDescription
STATUS BEFORE O/H Description of Job done
Inlet Duct1 DUCTSOutlet DuctInlet Damper
2 Dampers OutletDamperInlet
3ExpansionJoints Outlet
4 INSULATION5 CASING6 IMPELLER
Fan DE Brg7 Bearings
Fan NDE Brg8 Suction Cone9 OIL COOLER
DE bearing10
BearingClearanceIn mm
NDE bearing
11 Coupling Coupling gap12 Oil
13Alignment
reading
Axial Radial
Inspected By
M/M OPN CONTRACTOR FQA
NAMESIGNATURE
DATE
-
7/31/2019 Nspcl Durg Protocol
48/125
-
7/31/2019 Nspcl Durg Protocol
49/125
NSPCL - DURGAPUR
Page 48 of 48
PROTOCOL FOR ID FAN # 2
SN DescriptionSub
DescriptionSTATUS BEFORE O/H Description of Job done
Inlet Duct1 DUCTS
Outlet DuctInletDamper
2 DampersOutletDamperInlet
3ExpansionJoints Outlet
4 INSULATION
5 CASING
6 IMPELLERFan DEBrg
7 BearingsFan NDEBrg
8 Suction Cone9 OIL COOLER
DE bearing10
BearingClearanceIn mm
NDEbearing
11 CouplingCouplinggap
12 Oil
13Alignmentreading
Axial Radial
Inspected By
M/M OPN CONTRACTOR FQA
NAME
SIGNATURE
DATE
-
7/31/2019 Nspcl Durg Protocol
50/125
-
7/31/2019 Nspcl Durg Protocol
51/125
-
7/31/2019 Nspcl Durg Protocol
52/125
PROTOCOL OF BOILER TUBE THICKNESS SURVEY OF UNIT #
Period of O/H:
BMD FQA
SUMMARY OF TUBE-THICKNESS SURVEY REPORT
S NO AREATubes / Points
measured[NOS]
Tubes / Bendsreplaced [NOS]
1 HANGER TUBES
2 CONVECTIVE SUPER HEATER COILS
3 PLATEN SUPER HEATER COILS
4 END SUPER HEATER COILS
5 ECONOMISER COILS
6 STEAM COOLED WALL
7 S-PANNEL
8 OIL BURNERS
9 COAL BURNERS
10 SPRAY LINES
11 PEEP HOLES
12 MAN HOLES
13 GOOSE NECK
14 WATER WALL
TOTAL
-
7/31/2019 Nspcl Durg Protocol
53/125
-
7/31/2019 Nspcl Durg Protocol
54/125
NSPCL - DURGAPUR
Page 53 of 53
1) Internal InspectionSADC MILL 1 CORENER C
2) Freeness Checking
1) Internal InspectionSADC MILL 1 CORENER D
2) Freeness Checking
1) Internal InspectionSADC MILL 2 CORENER A
2) Freeness Checking
1) Internal InspectionSADC MILL 2 CORENER B2) Freeness Checking
1) Internal InspectionSADC MILL 2 CORENER C
2) Freeness Checking
1) Internal InspectionSADC MILL 2 CORENER D
2) Freeness Checking
1) Internal InspectionSADC MILL 2 CORENER D
2) Freeness Checking
1) Internal InspectionSADC MILL 3 CORENER A
2) Freeness Checking
1) Internal InspectionSADC MILL 3 CORENER B 2) Freeness Checking
1) Internal InspectionSADC MILL 3 CORENER C
2) Freeness Checking
1) Internal InspectionSADC MILL 3 CORENER D
2) Freeness Checking
1) Internal InspectionSADC MILL 4 CORENER A
2) Freeness Checking
1) Internal InspectionSADC MILL 4 CORENER B
2) Freeness Checking
1) Internal InspectionSADC MILL 4 CORENER C 2) Freeness Checking
1) Internal InspectionSADC MILL 4 CORENER D
2) Freeness Checking
1) Internal InspectionDAMPER OF OB 1
2) Freeness Checking
1) Internal InspectionDAMPER OF OB 2
2) Freeness Checking
1) Internal InspectionDAMPER OF OB 3
2) Freeness Checking
1) Internal InspectionDAMPER OF OB 4 2) Freeness Checking
1) Internal InspectionDAMPER OF OB 5
2) Freeness Checking
1) Internal InspectionDAMPER OF OB 6
2) Freeness Checking
1) Internal InspectionDAMPER OF OB 7
2) Freeness Checking
1) Internal InspectionDAMPER OF OB 8
2) Freeness Checking
-
7/31/2019 Nspcl Durg Protocol
55/125
NSPCL - DURGAPUR
Page 54 of 54
1) Internal Inspection
2) Freeness CheckingIGV PAFAN 1
3) Limit switch adjustment
1) Internal Inspection
2) Freeness CheckingIGV PAFAN 2
3) Limit switch adjustment
1) Internal Inspection
2) Freeness CheckingIGV PAFAN 3
3) Limit switch adjustment
1) Internal Inspection
2) Freeness CheckingIGV PAFAN 4
3) Limit switch adjustment
1) Internal Inspection
2) Freeness CheckingCOLD AIR DAMP PAF 1
3) Limit switch adjustment
1) Internal Inspection2) Freeness CheckingCOLD AIR DAMP PAF 2
3) Limit switch adjustment
1) Internal Inspection
2) Freeness CheckingCOLD AIR DAMP PAF 3
3) Limit switch adjustment
1) Internal Inspection
2) Freeness CheckingCOLD AIR DAMP PAF 4
3) Limit switch adjustment
1) Internal InspectionHOT AIR DAMP PAF 1
2) Freeness Checking1) Internal Inspection
HOT AIR DAMP PAF 22) Freeness Checking
1) Internal InspectionHOT AIR DAMP PAF 3
2) Freeness Checking
1) Internal InspectionHOT AIR DAMP PAF 4
2) Freeness Checking
1) Internal InspectionECO OUTLET DAMPERPASS A
2) Freeness Checking
1) Internal InspectionECO OUTLET DAMPERPASS B 2) Freeness Checking
1) Internal InspectionAIR PREHEATER FGOUTLET DAMPER PASS A 2) Freeness Checking
1) Internal InspectionAIR PREHEATER FGOUTLET DAMPER PASS B 2) Freeness Checking
1) Internal InspectionESP INLET FG DAMPERPASS A 2) Freeness Checking
1) Internal InspectionESP INLET FG DAMPERPASS B 2) Freeness Checking
-
7/31/2019 Nspcl Durg Protocol
56/125
NSPCL - DURGAPUR
Page 55 of 55
1) Internal InspectionESP OUTLET FG DAMPERPASS A 2) Freeness Checking
1) Internal InspectionESP OUTLET FG DAMPER
PASS B 2) Freeness Checking1) Internal Inspection
ID FAN 1 INLET DAMPER2) Freeness Checking
1) Internal InspectionID FAN 2 INLET DAMPER
2) Freeness Checking
1) Internal Inspection
2) Freeness CheckingID FAN 1 OUTLET DAMPER
3) Limit switch adjustment
1) Internal Inspection
2) Freeness CheckingID FAN 2 OUTLET DAMPER
3) Limit switch adjustment
Dept. OPRN MM C&I
Name
Sign.
Desgn.
-
7/31/2019 Nspcl Durg Protocol
57/125
NSPCL - DURGAPUR
Page 56 of 56
PROTOCAL FOR MECHANICAL /ELECTRICAL MAINTENANCETURBINE SIDE VALVE STATUS OF UNIT #
STATUS AFTER OVERHAULING
LOCATION DESCRIPTION NUMBER JOB DONE STATUS REMARKS
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
21 Mtr
Pegging steamisolating valve.[Steam isolatingvalve before FW
tank.]
1 2 9
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OL
Setting2. Limit switchsetting.3. Local andRemote operation
4 Indications
21 MtrDeaerator over-flow
isolating valve.1 3 2
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnet
condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemote operation
4 Indications
21 Mtr
M.S. to 12 ata. 20T/ hr [SHUTDOWNGENERALLY NOTAVAILABLE DUE
TO PASSING]
1 3 9
5. Auto operation
OPERATION TMD EMD
-
7/31/2019 Nspcl Durg Protocol
58/125
-
7/31/2019 Nspcl Durg Protocol
59/125
-
7/31/2019 Nspcl Durg Protocol
60/125
NSPCL - DURGAPUR
Page 59 of 59
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OF
Actuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
0 MtrHPH 2 Extraction
valve1 2 7
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing 4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
0 MtrHPH 1 Extraction
valve1 2 8
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switch
setting.3. Local andRemoteoperation
4 Indications
Ejector floorLPH 1 Extraction
valve9 1 2
5. Auto operation
OPERATION TMD EMD
-
7/31/2019 Nspcl Durg Protocol
61/125
-
7/31/2019 Nspcl Durg Protocol
62/125
-
7/31/2019 Nspcl Durg Protocol
63/125
-
7/31/2019 Nspcl Durg Protocol
64/125
-
7/31/2019 Nspcl Durg Protocol
65/125
NSPCL - DURGAPUR
Page 64 of 64
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnet
condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
BFP 2 dischargeValve
122
5. Auto operation
1) Lapping,2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
Isolating Valve of30% feed line
125
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OL
Setting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
Economizer inlet
valve124
5. Auto operation
OPERATION TMD EMD
-
7/31/2019 Nspcl Durg Protocol
66/125
-
7/31/2019 Nspcl Durg Protocol
67/125
NSPCL - DURGAPUR
Page 66 of 66
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnet
condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
0 MtrHot well levelcontrol valve
5 0 1. 1
5. Auto operation
1) Lapping,2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
0 MtrCEP recirculation
valve.5 0 1. 2
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OL
Setting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
MOT floorExtraction 1
check valve9 2 3
5. Auto operation
OPERATION TMD EMD
-
7/31/2019 Nspcl Durg Protocol
68/125
NSPCL - DURGAPUR
Page 67 of 67
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnet
condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
MOT floorExtraction 2check valve
9 2 4
5. Auto operation
1) Lapping,2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
MOT floorExtraction 3check valve
9 2 5
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OL
Setting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
Ejector floorExtraction 4
check valve9 2 6
5. Auto operation
OPERATION TMD EMD
-
7/31/2019 Nspcl Durg Protocol
69/125
-
7/31/2019 Nspcl Durg Protocol
70/125
NSPCL - DURGAPUR
Page 69 of 69
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition
1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
13 Mtr12 ata to 6 ata
hdr.5 1 2
5. Auto operation
1) Lapping,
2) Blue matching3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
(-) MtrLPH- 2 drip to
condensate line5 0 3
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting
2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
(-) MtrLPH 3 to LPH -
2 drip5 0 4
5. Auto operation
OPERATION TMD EMD
-
7/31/2019 Nspcl Durg Protocol
71/125
-
7/31/2019 Nspcl Durg Protocol
72/125
NSPCL - DURGAPUR
Page 71 of 71
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnet
condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
BFP suction valve BFP 1
5. Auto operation
1) Lapping,2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
BFP 2
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OL
Setting2. Limit switchsetting.3. Local andRemoteoperation
4 Indications
BFP 1 discharge
Valve121
5. Auto operation
OPERATION TMD EMD
-
7/31/2019 Nspcl Durg Protocol
73/125
-
7/31/2019 Nspcl Durg Protocol
74/125
-
7/31/2019 Nspcl Durg Protocol
75/125
-
7/31/2019 Nspcl Durg Protocol
76/125
-
7/31/2019 Nspcl Durg Protocol
77/125
NSPCL - DURGAPUR
Page 76 of 76
PROTOCAL FOR MECHANICAL MAINTENANCEBOILER SIDE VALVE STATUS OF UNIT #
STATUS AFTER OVERHAULINGLOCATION DESCRIPTION NUMBER JOB DONE STATUS REMARKS
1) Lapping,
2) Blue matching3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Start upoverflow v/v
105
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switch
setting.3. Local andRemote operation
4 Indications
IBD valve 106
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OF
Actuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
IBD valve 107
5. Auto operation
OPERATION BMD EMD
-
7/31/2019 Nspcl Durg Protocol
78/125
NSPCL - DURGAPUR
Page 77 of 77
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnet
condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Bottom drainheader valves (
From LHS )1
5. Auto operation
1) Lapping,
2) Blue matching3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Bottom drainheader valves (
From LHS )2
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switch
setting.3. Local andRemote operation
4 Indications
Bottom drainheader valves (
From LHS )3
5. Auto operation
OPERATION BMD EMD
-
7/31/2019 Nspcl Durg Protocol
79/125
-
7/31/2019 Nspcl Durg Protocol
80/125
-
7/31/2019 Nspcl Durg Protocol
81/125
NSPCL - DURGAPUR
Page 80 of 80
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnet
condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Drain Header ToIBD tank Valves
2
5. Auto operation
1) Lapping,
2) Blue matching3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Boiler FillingValves
1
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switch
setting.3. Local andRemote operation
4 Indications
Boiler FillingValves
2
5. Auto operation
OPERATION BMD EMD
-
7/31/2019 Nspcl Durg Protocol
82/125
NSPCL - DURGAPUR
Page 81 of 81
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnet
condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Super heaterdrain valves
(From BOILERside) Total
number of valves 14
1 T/B
5. Auto operation
1) Lapping,
2) Blue matching3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Super heaterdrain valves
(From BOILERside) Total
number of valves 15
2 T/B
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switch
setting.3. Local andRemote operation
4 Indications
Super heaterdrain valves
(From BOILERside) Total
number of valves
16
3 T/B
5. Auto operation
OPERATION BMD EMD
-
7/31/2019 Nspcl Durg Protocol
83/125
-
7/31/2019 Nspcl Durg Protocol
84/125
NSPCL - DURGAPUR
Page 83 of 83
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnet
condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Drum / SH vents(From UNIT 3
side) Totalnumber ofvalves 20
5. Auto operation
1) Lapping,
2) Blue matching3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Drum / SH vents(From UNIT 3
side) Totalnumber ofvalves 21
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switch
setting.3. Local andRemote operation
4 Indications
108 A
5. Auto operation
OPERATION BMD EMD
-
7/31/2019 Nspcl Durg Protocol
85/125
NSPCL - DURGAPUR
Page 84 of 84
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnet
condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
108 B
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local and
Remote operation4 Indications
Boiler Start upvent
110
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Economizer inlet
valve
124
5. Auto operation
OPERATION BMD EMD
-
7/31/2019 Nspcl Durg Protocol
86/125
NSPCL - DURGAPUR
Page 85 of 85
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
SH spray mainiso v/v ( near
RCF)144
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
SP0 spraycontrol valve
LHS
Spraystation
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition
1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
SP0 spraycontrol valveRHS
5. Auto operation
OPERATION BMD EMD
-
7/31/2019 Nspcl Durg Protocol
87/125
NSPCL - DURGAPUR
Page 86 of 86
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
SP1 spraycontrol valve
LHS
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
SP1 spraycontrol valve
RHS
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
SP2 spraycontrol valve
LHS
5. Auto operation
OPERATION BMD EMD
-
7/31/2019 Nspcl Durg Protocol
88/125
-
7/31/2019 Nspcl Durg Protocol
89/125
NSPCL - DURGAPUR
Page 88 of 88
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Oil burner 3Steam / oil valve
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Oil burner 4Steam / oil valve
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Oil burner 5Steam / oil valve
5. Auto operation
OPERATION BMD EMD
-
7/31/2019 Nspcl Durg Protocol
90/125
-
7/31/2019 Nspcl Durg Protocol
91/125
NSPCL - DURGAPUR
Page 90 of 90
1) Lapping,
2) Blue matching
3) Gland packing4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Soot blowingsteam isolating
valve
5. Auto operation
1) Lapping,
2) Blue matching
3) Gland packing
4) Bonnetcondition1. O/H OFActuator/ OLSetting
2. Limit switchsetting.
3. Local andRemote operation
4 Indications
Soot blowingmanual isolating
valve
5. Auto operation
OPERATION BMD EMD
-
7/31/2019 Nspcl Durg Protocol
92/125
-
7/31/2019 Nspcl Durg Protocol
93/125
-
7/31/2019 Nspcl Durg Protocol
94/125
NSPCL - DURGAPUR
Page 93 of 93
CHECKLIST FOR O/H OF BFP 2 MOTOR
FRAMESIZE:
A NAME OF DRIVE :-
B SL.NO. OF MOTOR:BEARINGNO.
OLD BRGNEWBRG
a. DESIDE
C PTW NO.b.NDESIDE
BEARING
D START DATE :- CHANGEa. DESIDE
YES/NO.
E COMPLETION DATE:-b.NDESIDE
YES/NO.
SL.No.
JOB DESCRIPTION ACTIVITY REMARKS
1Disconnecting of Oil & Cooling water line
safely.YES / NO
2 Cooler removing from motor. YES / NO
3 Dismantling of motor & cooler . YES / NO4 Motor lowering & threaded-out the rotor. YES / NO
5 Cleaning of cooler tubes. YES / NO
6Replacement of end shield gaskets and
painting of coolerYES / NO
7*Cooler boxed-up & hydro test at 4.0 Kg.
Pr.YES / NO
8*Cleaning & Checking of stator winding and
rotor.YES / NO
9*Checking of rotor bars/ end rings / rubbing
/any defects etc.YES / NO
10 Heating of stator / rotor. YES / NO
11 *IR / PI checking. YES / NO
12 Varnishing of stator / rotor. YES / NO
13Rotor threaded-in & placement on
foundation.YES / NO
14*Cleaning & Servicing of both brgs.(DE
&NDE).YES / NO
15 *Replacement of bearings (if required). YES / NO
-
7/31/2019 Nspcl Durg Protocol
95/125
-
7/31/2019 Nspcl Durg Protocol
96/125
-
7/31/2019 Nspcl Durg Protocol
97/125
-
7/31/2019 Nspcl Durg Protocol
98/125
NSPCL - DURGAPUR
Page 97 of 97
CHECKLIST FOR O/H OF HT MOTORS [CEP-2]FRAMESIZE:
A NAME OF DRIVE :-
B SL.NO. OF MOTOR: BEARINGNO. OLD BRG NEWBRGa. DESIDE
C PTW NO.b.NDESIDE
BEARING
D START DATE :- CHANGEa. DESIDE
YES/NO.
E COMPLETION DATE:-b.NDESIDE
YES/NO.
SL.No.
JOB DESCRIPTION ACTIVITY REMARKS
1 Motor Sl. No. YES / NO
2 Dismantling of motor. YES / NO
3 Checking of all fasteners threads YES / NO
4 Cleaning of rotor & stator. YES / NO
5 *Checking of rotor bars / end rings / any YES / NOrubbing / defects etc. YES / NO
6 Cleaning of stator. YES / NO
7 *Checking of stator winding. YES / NO
8 Heating of stator / rotor. YES / NO
9 *IR / PI checking. YES / NO
10 Varnishing of stator / rotor. YES / NO
11Cleaning / servicing of bearings (DE &
NDE).YES / NO
12 *Bearing clearance checking & replacement. YES / NO
13 Space heater checking. YES / NO
14 End covers are proper fixed. YES / NO
15 Greasing of bearings. YES / NO
16 Sealing of stator by (sealing) compound. YES / NO
17 Tightness of fasteners with proper washers. YES / NO
18 Fitting of grease cup/check nuts/ coupling / YES / NO
Sleeve etc.
19 Phase / neutral motor TB gaskets fixing. YES / NO
20 Fitting of cooling fan / cooling fan cover. YES / NO
21 Space heater cable connection. YES / NO
-
7/31/2019 Nspcl Durg Protocol
99/125
NSPCL - DURGAPUR
Page 98 of 98
22 Cable & earthling plates connection. YES / NO
23 PI / IR measuring. YES / NO
24Fitting/sealing of motor TB/ winding RTD /
Heater boxes covers (cable entry / holes).YES / NO
25Vibration of motor (decouple & couple). YES / NO
26 If any defect/ surprise inform to EIC. YES / NO
NOTE: Star (*) marks points to be checked by NSPCL representative.
Name of agency:- Signature of agency rep. :-
Name of NSPCL rep. :- Signature of NSPCL rep. :-
-
7/31/2019 Nspcl Durg Protocol
100/125
NSPCL - DURGAPUR
Page 99 of 99
CHECKLIST FOR O/H OF HT MOTORS [FD FAN -1]FRAMESIZE:
A NAME OF DRIVE :-
B SL.NO. OF MOTOR:BEARINGNO.
OLD BRGNEWBRG
a. DESIDE
C PTW NO.b.NDESIDE
BEARING
D START DATE :- CHANGEa. DESIDE
YES/NO.
E COMPLETION DATE:-b.NDESIDE
YES/NO.
SL.No.
JOB DESCRIPTION ACTIVITY REMARKS
1 Motor Sl. No. YES / NO
2 Dismantling of motor. YES / NO
3 Checking of all fasteners threads YES / NO
4Cleaning of rotor & stator.
YES / NO
5 *Checking of rotor bars / end rings / any YES / NO
rubbing / defects etc. YES / NO
6 Cleaning of stator. YES / NO
7 *Checking of stator winding. YES / NO
8 Heating of stator / rotor. YES / NO
9 *IR / PI checking. YES / NO
10 Varnishing of stator / rotor. YES / NO
11Cleaning / servicing of bearings (DE &
NDE).YES / NO
12 *Bearing clearance checking & replacement. YES / NO
13 Space heater checking. YES / NO
14 End covers are proper fixed. YES / NO
15 Greasing of bearings. YES / NO
16 Sealing of stator by (sealing) compound. YES / NO
17 Tightness of fasteners with proper washers. YES / NO
18 Fitting of grease cup/check nuts/ coupling / YES / NO
Sleeve etc.
19 Phase / neutral motor TB gaskets fixing. YES / NO
20 Fitting of cooling fan / cooling fan cover. YES / NO
-
7/31/2019 Nspcl Durg Protocol
101/125
NSPCL - DURGAPUR
Page 100 of 100
21 Space heater cable connection. YES / NO
22 Cable & earthling plates connection. YES / NO
23 PI / IR measuring. YES / NO
24Fitting/sealing of motor TB/ winding RTD /
Heater boxes covers (cable entry / holes).YES / NO
25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO
NOTE: Star (*) marks points to be checked by NSPCL representative.
Name of agency:- Signature of agency rep. :-
Name of NSPCL rep. :- Signature of NSPCL rep. :-
-
7/31/2019 Nspcl Durg Protocol
102/125
NSPCL - DURGAPUR
Page 101 of 101
CHECKLIST FOR O/H OF HT MOTORS [FD FAN 2]FRAMESIZE:
A NAME OF DRIVE :-
B SL.NO. OF MOTOR:BEARINGNO.
OLD BRGNEWBRG
a. DESIDE
C PTW NO.b.NDESIDE
BEARING
D START DATE :- CHANGEa. DESIDE
YES/NO.
E COMPLETION DATE:-b.NDESIDE
YES/NO.
SL.No.
JOB DESCRIPTION ACTIVITY REMARKS
1 Motor Sl. No. YES / NO
2 Dismantling of motor. YES / NO
3 Checking of all fasteners threads YES / NO
4Cleaning of rotor & stator.
YES / NO
5 *Checking of rotor bars / end rings / any YES / NO
rubbing / defects etc. YES / NO
6 Cleaning of stator. YES / NO
7 *Checking of stator winding. YES / NO
8 Heating of stator / rotor. YES / NO
9 *IR / PI checking. YES / NO
10 Varnishing of stator / rotor. YES / NO
11Cleaning / servicing of bearings (DE &
NDE).YES / NO
12 *Bearing clearance checking & replacement. YES / NO
13 Space heater checking. YES / NO
14 End covers are proper fixed. YES / NO
15 Greasing of bearings. YES / NO
16 Sealing of stator by (sealing) compound. YES / NO
17 Tightness of fasteners with proper washers. YES / NO
18 Fitting of grease cup/check nuts/ coupling / YES / NO
Sleeve etc.
19 Phase / neutral motor TB gaskets fixing. YES / NO
20 Fitting of cooling fan / cooling fan cover. YES / NO
-
7/31/2019 Nspcl Durg Protocol
103/125
NSPCL - DURGAPUR
Page 102 of 102
21 Space heater cable connection. YES / NO
22 Cable & earthling plates connection. YES / NO
23 PI / IR measuring. YES / NO
24Fitting/sealing of motor TB/ winding RTD /
Heater boxes covers (cable entry / holes).YES / NO
25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO
NOTE: Star (*) marks points to be checked by NSPCL representative.
Name of agency:- Signature of agency rep. :-
Name of NSPCL rep. :- Signature of NSPCL rep. :-
-
7/31/2019 Nspcl Durg Protocol
104/125
NSPCL - DURGAPUR
Page 103 of 103
CHECKLIST FOR O/H OF HT MOTORS [ID FAN - 1]FRAMESIZE:
A NAME OF DRIVE :-
B SL.NO. OF MOTOR: BEARINGNO. OLD BRG NEWBRGa. DESIDE
C PTW NO.b.NDESIDE
BEARING
D START DATE :- CHANGEa. DESIDE
YES/NO.
E COMPLETION DATE:-b.NDESIDE
YES/NO.
SL.No.
JOB DESCRIPTION ACTIVITY REMARKS
1 Motor Sl. No. YES / NO
2 Dismantling of motor. YES / NO
3 Checking of all fasteners threads YES / NO
4 Cleaning of rotor & stator. YES / NO
5 *Checking of rotor bars / end rings / any YES / NOrubbing / defects etc. YES / NO
6 Cleaning of stator. YES / NO
7 *Checking of stator winding. YES / NO
8 Heating of stator / rotor. YES / NO
9 *IR / PI checking. YES / NO
10 Varnishing of stator / rotor. YES / NO
11Cleaning / servicing of bearings (DE &
NDE).YES / NO
12 *Bearing clearance checking & replacement. YES / NO
13 Space heater checking. YES / NO
14 End covers are proper fixed. YES / NO
15 Greasing of bearings. YES / NO
16 Sealing of stator by (sealing) compound. YES / NO
17 Tightness of fasteners with proper washers. YES / NO
18 Fitting of grease cup/check nuts/ coupling / YES / NO
Sleeve etc.
19 Phase / neutral motor TB gaskets fixing. YES / NO
20 Fitting of cooling fan / cooling fan cover. YES / NO
21 Space heater cable connection. YES / NO
-
7/31/2019 Nspcl Durg Protocol
105/125
NSPCL - DURGAPUR
Page 104 of 104
22 Cable & earthling plates connection. YES / NO
23 PI / IR measuring. YES / NO
24Fitting/sealing of motor TB/ winding RTD /
Heater boxes covers (cable entry / holes).YES / NO
25 Vibration of motor (decouple & couple). YES / NO
26 If any defect/ surprise inform to EIC. YES / NO
NOTE: Star (*) marks points to be checked by NSPCL representative.
Name of agency:- Signature of agency rep. :-
Name of NSPCL rep. :- Signature of NSPCL rep. :-
-
7/31/2019 Nspcl Durg Protocol
106/125
-
7/31/2019 Nspcl Durg Protocol
107/125
-
7/31/2019 Nspcl Durg Protocol
108/125
NSPCL - DURGAPUR
Page 107 of 107
CHECKLIST FOR O/H OF HT MOTORS [PA FAN - 1]FRAMESIZE:
A NAME OF DRIVE :-
B SL.NO. OF MOTOR:BEARINGNO.
OLD BRGNEWBRG
a. DESIDE
C PTW NO.b.NDESIDE
BEARING
D START DATE :- CHANGEa. DESIDE
YES/NO.
E COMPLETION DATE:-b.NDESIDE
YES/NO.
SL.No.
JOB DESCRIPTION ACTIVITY REMARKS
1 Motor Sl. No. YES / NO
2 Dismantling of motor. YES / NO
3 Checking of all fasteners threads YES / NO
4Cleaning of rotor & stator.
YES / NO
5 *Checking of rotor bars / end rings / any YES / NO
rubbing / defects etc. YES / NO
6 Cleaning of stator. YES / NO
7 *Checking of stator winding. YES / NO
8 Heating of stator / rotor. YES / NO
9 *IR / PI checking. YES / NO
10 Varnishing of stator / rotor. YES / NO
11Cleaning / servicing of bearings (DE &
NDE).YES / NO
12 *Bearing clearance checking & replacement. YES / NO
13 Space heater checking. YES / NO
14 End covers are proper fixed. YES / NO
15 Greasing of bearings. YES / NO
16 Sealing of stator by (sealing) compound. YES / NO
17 Tightness of fasteners with proper washers. YES / NO
18 Fitting of grease cup/check nuts/ coupling / YES / NO
Sleeve etc.
19 Phase / neutral motor TB gaskets fixing. YES / NO
20 Fitting of cooling fan / cooling fan cover. YES / NO
-
7/31/2019 Nspcl Durg Protocol
109/125
NSPCL - DURGAPUR
Page 108 of 108
21 Space heater cable connection. YES / NO
22 Cable & earthling plates connection. YES / NO
23 PI / IR measuring. YES / NO
24Fitting/sealing of motor TB/ winding RTD /
Heater boxes covers (cable entry / holes).YES / NO
25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO
NOTE: Star (*) marks points to be checked by NSPCL representative.
Name of agency:- Signature of agency rep. :-
Name of NSPCL rep. :- Signature of NSPCL rep. :-
-
7/31/2019 Nspcl Durg Protocol
110/125
NSPCL - DURGAPUR
Page 109 of 109
CHECKLIST FOR O/H OF HT MOTORS [PA FAN - 2]FRAMESIZE:
A NAME OF DRIVE :-
B SL.NO. OF MOTOR: BEARINGNO. OLD BRG NEWBRGa. DESIDE
C PTW NO.b.NDESIDE
BEARING
D START DATE :- CHANGEa. DESIDE
YES/NO.
E COMPLETION DATE:-b.NDESIDE
YES/NO.
SL.No.
JOB DESCRIPTION ACTIVITY REMARKS
1 Motor Sl. No. YES / NO
2 Dismantling of motor. YES / NO
3 Checking of all fasteners threads YES / NO
4 Cleaning of rotor & stator. YES / NO
5 *Checking of rotor bars / end rings / any YES / NOrubbing / defects etc. YES / NO
6 Cleaning of stator. YES / NO
7 *Checking of stator winding. YES / NO
8 Heating of stator / rotor. YES / NO
9 *IR / PI checking. YES / NO
10 Varnishing of stator / rotor. YES / NO
11Cleaning / servicing of bearings (DE &
NDE).YES / NO
12 *Bearing clearance checking & replacement. YES / NO
13 Space heater checking. YES / NO
14 End covers are proper fixed. YES / NO
15 Greasing of bearings. YES / NO
16 Sealing of stator by (sealing) compound. YES / NO
17 Tightness of fasteners with proper washers. YES / NO
18 Fitting of grease cup/check nuts/ coupling / YES / NO
Sleeve etc.
19 Phase / neutral motor TB gaskets fixing. YES / NO
20 Fitting of cooling fan / cooling fan cover. YES / NO
21 Space heater cable connection. YES / NO
-
7/31/2019 Nspcl Durg Protocol
111/125
-
7/31/2019 Nspcl Durg Protocol
112/125
-
7/31/2019 Nspcl Durg Protocol
113/125
NSPCL - DURGAPUR
Page 112 of 112
22 Cable & earthling plates connection. YES / NO
23 PI / IR measuring. YES / NO
24Fitting/sealing of motor TB/ winding RTD /
Heater boxes covers (cable entry / holes).YES / NO
25 Vibration of motor (decouple & couple). YES / NO
26 If any defect/ surprise inform to EIC. YES / NO
NOTE: Star (*) marks points to be checked by NSPCL representative.
Name of agency:- Signature of agency rep. :-
Name of NSPCL rep. :- Signature of NSPCL rep. :-
-
7/31/2019 Nspcl Durg Protocol
114/125
-
7/31/2019 Nspcl Durg Protocol
115/125
NSPCL - DURGAPUR
Page 114 of 114
21 Space heater cable connection. YES / NO
22 Cable & earthling plates connection. YES / NO
23 PI / IR measuring. YES / NO
24Fitting/sealing of motor TB/ winding RTD /
Heater boxes covers (cable entry / holes).YES / NO
25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO
NOTE: Star (*) marks points to be checked by NSPCL representative.
Name of agency:- Signature of agency rep. :-
Name of NSPCL rep. :- Signature of NSPCL rep. :-
-
7/31/2019 Nspcl Durg Protocol
116/125
-
7/31/2019 Nspcl Durg Protocol
117/125
NSPCL - DURGAPUR
Page 116 of 116
21 Space heater cable connection. YES / NO
22 Cable & earthling plates connection. YES / NO
23 PI / IR measuring. YES / NO
24Fitting/sealing of motor TB/ winding RTD /
Heater boxes covers (cable entry / holes).YES / NO
25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO
NOTE: Star (*) marks points to be checked by NSPCL representative.
Name of agency:- Signature of agency rep. :-
Name of NSPCL rep. :- Signature of NSPCL rep. :-
-
7/31/2019 Nspcl Durg Protocol
118/125
NSPCL - DURGAPUR
Page 117 of 117
CHECKLIST FOR O/H OF HT MOTORS [COAL MILL - 2]FRAMESIZE:
A NAME OF DRIVE :-
B SL.NO. OF MOTOR:BEARINGNO.
OLD BRGNEWBRG
a. DESIDE
C PTW NO.b.NDESIDE
BEARING
D START DATE :- CHANGEa. DESIDE
YES/NO.
E COMPLETION DATE:-b.NDESIDE
YES/NO.
SL.No.
JOB DESCRIPTION ACTIVITY REMARKS
1 Motor Sl. No. YES / NO
2 Dismantling of motor. YES / NO
3 Checking of all fasteners threads YES / NO
4Cleaning of rotor & stator.
YES / NO
5 *Checking of rotor bars / end rings / any YES / NO
rubbing / defects etc. YES / NO
6 Cleaning of stator. YES / NO
7 *Checking of stator winding. YES / NO
8 Heating of stator / rotor. YES / NO
9 *IR / PI checking. YES / NO
10 Varnishing of stator / rotor. YES / NO
11Cleaning / servicing of bearings (DE &
NDE).YES / NO
12 *Bearing clearance checking & replacement. YES / NO
13 Space heater checking. YES / NO
14 End covers are proper fixed. YES / NO
15 Greasing of bearings. YES / NO
16 Sealing of stator by (sealing) compound. YES / NO
17 Tightness of fasteners with proper washers. YES / NO
18 Fitting of grease cup/check nuts/ coupling / YES / NO
Sleeve etc.
19 Phase / neutral motor TB gaskets fixing. YES / NO
20 Fitting of cooling fan / cooling fan cover. YES / NO
-
7/31/2019 Nspcl Durg Protocol
119/125
NSPCL - DURGAPUR
Page 118 of 118
21 Space heater cable connection. YES / NO
22 Cable & earthling plates connection. YES / NO
23 PI / IR measuring. YES / NO
24Fitting/sealing of motor TB/ winding RTD /
Heater boxes covers (cable entry / holes).YES / NO
25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO
NOTE: Star (*) marks points to be checked by NSPCL representative.
Name of agency:- Signature of agency rep. :-
Name of NSPCL rep. :- Signature of NSPCL rep. :-
-
7/31/2019 Nspcl Durg Protocol
120/125
-
7/31/2019 Nspcl Durg Protocol
121/125
-
7/31/2019 Nspcl Durg Protocol
122/125
NSPCL - DURGAPUR
Page 121 of 121
CHECKLIST FOR O/H OF HT MOTORS [COAL MILL 4]FRAMESIZE:
A NAME OF DRIVE :-
B SL.NO. OF MOTOR:BEARINGNO.
OLD BRGNEWBRG
a. DESIDE
C PTW NO.b.NDESIDE
BEARING
D START DATE :- CHANGEa. DESIDE
YES/NO.
E COMPLETION DATE:-b.NDESIDE
YES/NO.
SL.No.
JOB DESCRIPTION ACTIVITY REMARKS
1 Motor Sl. No. YES / NO
2 Dismantling of motor. YES / NO
3 Checking of all fasteners threads YES / NO
4Cleaning of rotor & stator.
YES / NO
5 *Checking of rotor bars / end rings / any YES / NO
rubbing / defects etc. YES / NO
6 Cleaning of stator. YES / NO
7 *Checking of stator winding. YES / NO
8 Heating of stator / rotor. YES / NO
9 *IR / PI checking. YES / NO
10 Varnishing of stator / rotor. YES / NO
11Cleaning / servicing of bearings (DE &
NDE).YES / NO
12 *Bearing clearance checking & replacement. YES / NO
13 Space heater checking. YES / NO
14 End covers are proper fixed. YES / NO
15 Greasing of bearings. YES / NO
16 Sealing of stator by (sealing) compound. YES / NO
17 Tightness of fasteners with proper washers. YES / NO
18 Fitting of grease cup/check nuts/ coupling / YES / NO
Sleeve etc.
19 Phase / neutral motor TB gaskets fixing. YES / NO
20 Fitting of cooling fan / cooling fan cover. YES / NO
-
7/31/2019 Nspcl Durg Protocol
123/125
NSPCL - DURGAPUR
Page 122 of 122
21 Space heater cable connection. YES / NO
22 Cable & earthling plates connection. YES / NO
23 PI / IR measuring. YES / NO
24Fitting/sealing of motor TB/ winding RTD /
Heater boxes covers (cable entry / holes).YES / NO
25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO
NOTE: Star (*) marks points to be checked by NSPCL representative.
Name of agency:- Signature of agency rep. :-
Name of NSPCL rep. :- Signature of NSPCL rep. :-
-
7/31/2019 Nspcl Durg Protocol
124/125
NSPCL - DURGAPUR
Page 123 of 123
CHECKLIST FOR O/H OF HT MOTORS [CW PUMP-1]FRAMESIZE:
A NAME OF DRIVE :-
B SL.NO. OF MOTOR:BEARINGNO.
OLD BRGNEWBRG
a. DESIDE
C PTW NO.b.NDESIDE
BEARING
D START DATE :- CHANGEa. DESIDE
YES/NO.
E COMPLETION DATE:-b.NDESIDE
YES/NO.
SL.No.
JOB DESCRIPTION ACTIVITY REMARKS
1 Motor Sl. No. YES / NO
2 Dismantling of motor. YES / NO
3 Checking of all fasteners threads YES / NO
4Cleaning of rotor & stator.
YES / NO
5 *Checking of rotor bars / end rings / any YES / NO
rubbing / defects etc. YES / NO
6 Cleaning of stator. YES / NO
7 *Checking of stator winding. YES / NO
8 Heating of stator / rotor. YES / NO
9 *IR / PI checking. YES / NO
10 Varnishing of stator / rotor. YES / NO
11Cleaning / servicing of bearings (DE &
NDE).YES / NO
12 *Bearing clearance checking & replacement. YES / NO
13 Space heater checking. YES / NO
14 End covers are proper fixed. YES / NO
15 Greasing of bearings. YES / NO
16 Sealing of stator by (sealing) compound. YES / NO
17 Tightness of fasteners with proper washers. YES / NO
18 Fitting of grease cup/check nuts/ coupling / YES / NO
Sleeve etc.
19 Phase / neutral motor TB gaskets fixing. YES / NO
20 Fitting of cooling fan / cooling fan cover. YES / NO
-