Faculty of Engineering, Information and SystemsUniversity of Tsukuba
www.murao.net
Observation of Reconstruction Process in Pisco, Peru
International Conference - SATREPS PROJECTJAPAN PERU Cooperation
for the Earthquake and Tsunami Disaster Risk ReductionOsamu MURAO
Disaster Life Cycle
Response
Recovery(Reconstruction)
Mitigation
Preparedness
Damage Assessment
Prediction & Early Warning
Disaster
Information & Communication
Contemporary Chicago as a result of 1871 Fire
Location of Pisco Province (INDECI)
Reconstruction Stage in FORSUR Strategy
Field Survey in July, 2012
Central San Clemente Cathedral of Pisco
Recovery of Public Facilities
Empty Lots
New Façade Gate Instead of Solid New House
Temporary Houses
Based on analysis, 87.6% of seriously damaged buildingsand 98.3% of severely damaged buildings had beenreoccupied by the time of the survey.
ZTE
RESERVA NACIONALDE PARACAS
ICA75 KM
LIMA250 KM
PISCO: LA CIUDAD DE LA INTEGRACIÓN INTERNA Y EXTERNA
VISIÓN PISCO 2011 - 2021+ MASTER PLAN : PISCO
SANCLEMENTE
TUPAC AMARU
INTERCAMBIOVIAL PISCO1
2
4
1
2
2
1 Aeropuerto Internacional de PiscoÁrea: 176 Ha.
Puerto San MartínÁrea: 42.20 Ha.
INFRAESTRUCTURA
B A H Í A P A R A C A S
3a
3b
OU-EQ
ZTE
ZTE
ZTEZTE OU-EQ
ZTE
ZTE
ZTE
ZHR
RDM
RDM
I2
I3
PARQUEEÓLICO
RELLENOSANITARIO
2
3
1 Parque Cultural (Universidades)
Parque Comercial (Mall y Supermercados)
Parque Industrial
EQUIPAMIENTO
4 Parque Recreacional (Ferias Internacionales)
ZTE1
OU
FECHA: 03 DE ENERO 2012
3b
PARQUE LINEALSección: 100.00 m.Longitud: 10.0 Km.Área: 100.00 Ha.
7
FAJA MARGINALSección: 50.00 m.Longitud: 6.50 Km.Área: 60.00 Ha.
PLANTA FUNSUR24.50 Ha.
PLANTA ACEROS AREQUIPA220.95 Ha.
PLANTA PLUSPETROL253.20 Ha.
PLANTA PESQUERAS75.15 Ha.
MINSUR101.10 Ha.
SOLDEXA1213.90 Ha.
RÍO PISCO
ZONADE
RESERVA
AYACUCHO340 KM
I42,261.90 Ha.
5
OU
ZTE
ZTE
ZTE
ZTE
SIMBOLO DENOMINACIÓN DE AREAS AREA (Ha)
AUA ÁREA URBANA ACTUAL 1978.90
RDM RESIDENCIAL DE DENSIDAD MEDIA 800.00
I4 INDUSTRIA PESADA 2261.50
I3 INDUSTRIA MEDIA 151.90
I2 INDUSTRIA LIVIANA 572.20
ZHR ZONA DE HABILITACIÓN
RECREACIONAL1058.30
ZTE ZONA DE TRATAMIENTO ESPECIAL 13596.20
ZTE 1ZONA DE TRATAMIENTO ESPECIAL
‐ TURISMO842.20
ZR ZONA RESERVADA 5478.20
OU OTROS USOS ‐ AÉREO MARÍTIMO 812.80
OU ‐ EQOTROS USOS ‐ CULTURAL
COMERCIAL INDUSTRIAL338.60
TOTAL 27890.80
I2
I2
I2
2
3
4
51 Vía Nacional (Panamericana Sur)Sección: 120 m.
Nuevo Trazo Vía NacionalSección: 120 m.Longitud: Tramo Chincha - San Andrés 42.00 Km.
Vía de Acceso Malecón y PuertoSección: 60 m.Longitud: Tramo a) Vía Turística 20.50 Km. Tramo b) Vía Transporte Pesado 31.00 Km.
Vía Acceso al AeropuertoSección: 60 m.Longitud: 17.70 Km.
Vía Separadora IndustrialSección: 60 m.Longitud: 20.50 Km.
VIAS
Vía VecinalSección: 20 m.Longitud: 27.60 Km.
6
Ruta Nacionales a ClasificarSección: 60 m.Longitud: 4.70 Km.
7
6
SAN ANDRÉSÁrea Distrito: 23,236 Ha.Área Urbana: 338 Ha.
PARACASÁrea Distrito: 142,627 Ha.Área Urbana: 188 Ha.
PISCOÁrea Distrito: 2,294 Ha.Área Urbana: 842 Ha.
1
PARQUE LINEALSección: 100.00 m.Longitud: 7.15 Km.Área: 71.50 Ha.
PARQUE LINEALSección: 100.00 m.Longitud: 10.80 Km.Área: 108.00 Ha.
1923 Great Tokyo Earthquake
1657 1872 1923 1945 1976 1986 1995
University of Tokyo
11:58amSeptember 1, 1923Death Toll: 99,331
1919
1935
1955
1976
1986
1993
2000
Importance of Pre-disaster Urban Recovery Plan
Master Plan for the Future of Tokyo (1921)
Post-disaster Recovery Plan(1924-30)
Future Research Development
Urban Risk Changes in Pisco
Pre-disaster Urban Recovery Plan in …