Observation of Reconstruction Process in Pisco, Peru

International Conference - SATREPS PROJECTJAPAN PERU Cooperation

for the Earthquake and Tsunami Disaster Risk ReductionOsamu MURAO

Disaster Life Cycle

Response

Recovery(Reconstruction)

Mitigation

Preparedness

Damage Assessment

Prediction & Early Warning

Disaster

Information & Communication

Contemporary Chicago as a result of 1871 Fire

Location of Pisco Province (INDECI)

Reconstruction Stage in FORSUR Strategy

Field Survey in July, 2012

Central San Clemente Cathedral of Pisco

Recovery of Public Facilities

Empty Lots

New Façade Gate Instead of Solid New House

Temporary Houses

Based on analysis, 87.6% of seriously damaged buildingsand 98.3% of severely damaged buildings had beenreoccupied by the time of the survey.

ZTE

RESERVA NACIONALDE PARACAS

ICA75 KM

LIMA250 KM

PISCO: LA CIUDAD DE LA INTEGRACIÓN INTERNA Y EXTERNA

VISIÓN PISCO 2011 - 2021+ MASTER PLAN : PISCO

SANCLEMENTE

TUPAC AMARU

INTERCAMBIOVIAL PISCO1

2

4

1

2

2

1 Aeropuerto Internacional de PiscoÁrea: 176 Ha.

Puerto San MartínÁrea: 42.20 Ha.

INFRAESTRUCTURA

B A H Í A P A R A C A S

3a

3b

OU-EQ

ZTE

ZTE

ZTEZTE OU-EQ

ZTE

ZTE

ZTE

ZHR

RDM

RDM

I2

I3

PARQUEEÓLICO

RELLENOSANITARIO

2

3

1 Parque Cultural (Universidades)

Parque Comercial (Mall y Supermercados)

Parque Industrial

EQUIPAMIENTO

4 Parque Recreacional (Ferias Internacionales)

ZTE1

OU

FECHA: 03 DE ENERO 2012

3b

PARQUE LINEALSección: 100.00 m.Longitud: 10.0 Km.Área: 100.00 Ha.

7

FAJA MARGINALSección: 50.00 m.Longitud: 6.50 Km.Área: 60.00 Ha.

PLANTA FUNSUR24.50 Ha.

PLANTA ACEROS AREQUIPA220.95 Ha.

PLANTA PLUSPETROL253.20 Ha.

PLANTA PESQUERAS75.15 Ha.

MINSUR101.10 Ha.

SOLDEXA1213.90 Ha.

RÍO PISCO

ZONADE

RESERVA

AYACUCHO340 KM

I42,261.90 Ha.

5

OU

ZTE

ZTE

ZTE

ZTE

SIMBOLO DENOMINACIÓN DE AREAS AREA (Ha)

AUA ÁREA URBANA ACTUAL 1978.90

RDM RESIDENCIAL DE DENSIDAD MEDIA 800.00

I4 INDUSTRIA PESADA 2261.50

I3 INDUSTRIA MEDIA 151.90

I2 INDUSTRIA LIVIANA 572.20

ZHR ZONA DE HABILITACIÓN 

RECREACIONAL1058.30

ZTE ZONA DE TRATAMIENTO ESPECIAL 13596.20

ZTE 1ZONA DE TRATAMIENTO ESPECIAL    

‐ TURISMO842.20

ZR ZONA RESERVADA 5478.20

OU OTROS USOS ‐ AÉREO MARÍTIMO 812.80

OU ‐ EQOTROS USOS ‐ CULTURAL 

COMERCIAL INDUSTRIAL338.60

TOTAL 27890.80

I2

I2

I2

2

3

4

51 Vía Nacional (Panamericana Sur)Sección: 120 m.

Nuevo Trazo Vía NacionalSección: 120 m.Longitud: Tramo Chincha - San Andrés 42.00 Km.

Vía de Acceso Malecón y PuertoSección: 60 m.Longitud: Tramo a) Vía Turística 20.50 Km. Tramo b) Vía Transporte Pesado 31.00 Km.

Vía Acceso al AeropuertoSección: 60 m.Longitud: 17.70 Km.

Vía Separadora IndustrialSección: 60 m.Longitud: 20.50 Km.

VIAS

Vía VecinalSección: 20 m.Longitud: 27.60 Km.

6

Ruta Nacionales a ClasificarSección: 60 m.Longitud: 4.70 Km.

7

6

SAN ANDRÉSÁrea Distrito: 23,236 Ha.Área Urbana: 338 Ha.

PARACASÁrea Distrito: 142,627 Ha.Área Urbana: 188 Ha.

PISCOÁrea Distrito: 2,294 Ha.Área Urbana: 842 Ha.

1

PARQUE LINEALSección: 100.00 m.Longitud: 7.15 Km.Área: 71.50 Ha.

PARQUE LINEALSección: 100.00 m.Longitud: 10.80 Km.Área: 108.00 Ha.

1923 Great Tokyo Earthquake

1657 1872 1923 1945 1976 1986 1995

University of Tokyo

11:58amSeptember 1, 1923Death Toll: 99,331

1919

1935

1955

1976

1986

1993

2000

Importance of Pre-disaster Urban Recovery Plan

Master Plan for the Future of Tokyo (1921)

Post-disaster Recovery Plan(1924-30)

Future Research Development

Urban Risk Changes in Pisco

Pre-disaster Urban Recovery Plan in …

Gracias por su atencion!

top related