EERSTER RIVER MULTI PURPOSE SPORTS CENTRE • PROFESSIONAL TEAM • RFP/TENDER FOR PROFESSIONAL SERVICES TO DESIGN A MULTI PURPOSE SPORTS HALL. VMA –ARCHITECTS /PROJECT MANAGER OWS-STRUCTURAL & CIVIL L2K –QUANTITY SURVEYOR ICE GROUP –ELECTRICAL ENG. MAN –MECHANICAL ENG. A.GEACH –LAND SURVEYOR G.FARMER –HEALTH & SAFETY CONSULTANT. SUBMISSION OF COMPLETED TENDER DOCUMENT

TRANSCRIPT

EERSTER RIVER MULTI PURPOSE SPORTS CENTRE

STAGE 1• RFP/TENDER FOR PROFESSIONAL SERVICESTO DESIGN A MULTI PURPOSE SPORTS HALL.

• PROFESSIONAL TEAMVMA – ARCHITECTS /PROJECT MANAGEROWS- STRUCTURAL & CIVILL2K – QUANTITY SURVEYORICE GROUP – ELECTRICAL ENG.MAN – MECHANICAL ENG.A.GEACH – LAND SURVEYORG.FARMER – HEALTH & SAFETY CONSULTANT.

SUBMISSION OF COMPLETED TENDER DOCUMENT

STAGE 2 & 3TENDER AWARD

• DESIGN CONCEPT & DESIGN DEVELOPMENT• THE BRIEFHALL 476 sqmMINOR HALL 42sqmKITCHEN 28sqmABLUTION 51sqmSEMINAR /ADMIN AREA -76sqmREFUSE ROOM - 8sqmSTORE ROOM 10sqmDISABLED TOILET 5sqmENTRANCE FOYER - 93sqmVIEWING DECK 30sqm

COORDINATION OF ALL CONSULTANTS INPUT INTO THE DESIGN.REVIEW DESIGN WITH ALL STATUTORY BODIES.

PRECEDENT STUDY

House Brebnor– Stanley Saitowitz

House Brebnor– Stanley Saitowitz

•Piazza del Campidoglio – Michelangelo Buonarroti

•Piazza del Campidoglio – Michelangelo Buonarroti

STAGE 4

• TECHNICAL DOCUMENTATION OF CONSULTING TEAM

• REVIEW THE ESTIMATED COST

• LOCAL AUTHORITY APPROVAL

• TENDER FOR CONSTRUCTION ADVERTISED

• CONTRACTOR RECOMMENDED FOR APOINTMENT

• SAFAZ (WOMAN BUILDER)

• CONTRACT ADMINISTRATION & SITE SUPERVISION

• PRACTICAL COMPLETION / WORKS COMPLETION / FINAL COMPLETION

• AS BUILT DRAWINGS –MAINTANANCE MANUAL COMPLIANCE CERTIFICATES – OCCUPATION CERTIFICATES

STAGE 5

THE END .THANK YOU