Ohio Department of TransportationOhio Department of TransportationMarian ThompsonMarian Thompson
Freeway Operations EngineerFreeway Operations EngineerSeptember 20, 2005September 20, 2005
Current / Future Direction of ITS Programs
OverviewOverview Incident Management versus Recurring CongestionIncident Management versus Recurring Congestion
• ITS/FMSITS/FMS• PlaybookPlaybook• Diesel Spill cleanupDiesel Spill cleanup• Hazardous Materials ContractsHazardous Materials Contracts• Freeway Service PatrolsFreeway Service Patrols• Quick ClearQuick Clear
Quality AssuranceQuality Assurance• ITS in ODOT’s organizationITS in ODOT’s organization• Performance measurementPerformance measurement
Freeway OperationsFreeway Operations
ITSITS• Incident Management Incident Management
or Freeway Operationsor Freeway Operations• FMS with District FMS with District
operated TMCoperated TMC
Freeway Management SystemsFreeway Management Systems ARTIMISARTIMIS ColumbusColumbus
▫ Phase 1Phase 1▫ Phase 2Phase 2
Cleveland FMSCleveland FMS Akron FMSAkron FMS Dayton Early Dayton Early
DeploymentDeployment Future Future
▫ Toledo FMSToledo FMS▫ ARTIMIS and Columbus ARTIMIS and Columbus
upgradesupgrades
ARTIMISARTIMIS
Equipment MaintenanceEquipment Maintenance Software and Systems Software and Systems
AdministrationAdministration OperationsOperations
Columbus FMSColumbus FMS
““Phase I” Phase I” operationaloperational
Full build out is Full build out is now under now under constructionconstruction• Miller Cable is Miller Cable is
prime contractorprime contractor Maintenance issuesMaintenance issues Operations issuesOperations issues
Cleveland Freeway Management Cleveland Freeway Management SystemSystem
Design underwayDesign underway DMJM+Harris is DMJM+Harris is
designerdesigner Software/ systems Software/ systems
integrationintegration Expect to sell in Expect to sell in
Spring 2007Spring 2007
Incident ManagementIncident Management ITS ITS PlaybookPlaybook Freeway Operations Freeway Operations
ManualManual Diesel Spill CleanupDiesel Spill Cleanup Haz Mat ContractsHaz Mat Contracts Urban Freeway Service Urban Freeway Service
PatrolsPatrols▫ AkronAkron▫ CincinnatiCincinnati▫ ClevelandCleveland▫ ColumbusColumbus▫ DaytonDayton▫ ToledoToledo
PlaybookPlaybook
Pre-defined freeway detour Pre-defined freeway detour routes and response routes and response proceduresprocedures
Applies to interstates and Applies to interstates and “lookalikes”“lookalikes”
Promotes cooperation Promotes cooperation between ODOT and local between ODOT and local public safety agenciespublic safety agencies
Promotes review of overly Promotes review of overly long freeway closures long freeway closures
Playbook Trailer conceptPlaybook Trailer concept District visitsDistrict visits OTISOTIS Web-based versus PaperWeb-based versus Paper
Freeway Operations ManualFreeway Operations Manual
Under DevelopmentUnder Development Incorporates/references the PlaybookIncorporates/references the Playbook Provides IM GuidelinesProvides IM Guidelines
• Quick ClearQuick Clear• Diesel Spill Response Diesel Spill Response • Hazardous Materials ContractsHazardous Materials Contracts• Incident Management and Response Incident Management and Response
ReviewsReviews• Cooperation with other entitiesCooperation with other entities
Freeway System PerformanceFreeway System Performance
Permitted Lane Closure criteria applied to Permitted Lane Closure criteria applied to Freeways and “Lookalikes” on ODOT Office Freeways and “Lookalikes” on ODOT Office of Traffic Engineering Webpage of Traffic Engineering Webpage
Number, location, and duration of closuresNumber, location, and duration of closures Full and Partial Closure EvaluationFull and Partial Closure Evaluation Log of DMS messagesLog of DMS messages Corridor reports (if instrumented): days in Corridor reports (if instrumented): days in
month that peak travel time exceeded two month that peak travel time exceeded two times the averagetimes the average
New and expanded Ramp MeteringNew and expanded Ramp Metering
ITS MaintenanceITS Maintenance
Preventive maintenance program for Preventive maintenance program for ITS equipmentITS equipment
Equipment up-time goalsEquipment up-time goals• Detector StationsDetector Stations• CCTVCCTV• HARHAR• DMSDMS
System up-time GoalsSystem up-time Goals
SummarySummary
Preventive maintenance program for Preventive maintenance program for ITS equipmentITS equipment
Equipment and System goalsEquipment and System goals Evaluation of incident responseEvaluation of incident response Cooperation with other entitiesCooperation with other entities Freeway Operations ManualFreeway Operations Manual