I-64 Kanawha River Bridge

South Charleston & Dunbar W.V

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 2/59

 

Contract Information

Owners: WVDOT / FHWADesigner: T.Y. Lin InternationalLet: February 2007

Contractor: Brayman Construction Corporation Finley Engineering GroupMichael Baker, Jr.

Awarded: March 2007

Start Date: May 2007Completion Date: October 2010

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 3/59

 

Bid Results

Steel Alternative $113 Million

Concrete Alternative $83 Million

Bridge Items: $75Million 

( $379 / SF )Second Largest Contract Awarded

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 4/59

 

Concrete

Segmental Box Girder 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 5/59

 

Topics of Interest

• Superstructure Concrete strength 6,500 psi• Mass Concrete• Main Piers• Balanced cantilever construction

• 167 cast-in-place segments• 760’ Main Span length longest continuous segmental

span in North America• 90 cantilever tendons 22-0.6”•

34 span tendons 19-0.6”• Post Tensioning• Grouting

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 6/59

 

 WVDOH Class H Modified (6500 psi) concrete

Arrow Concrete

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 7/59 

Mix Design Requirements

Air Entrained 6500 psi

Low E modulus of elasticity, and creep

Workable mix ranging from a 4” to 8”Slump

Low Rapid Chloride Permeabilityrequirement.

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 8/59 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 9/59 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 10/59 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 11/59 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 12/59 

Special Provision SP601: Mass Concrete•Any Placement with Least Dimension Greater then 48.0Inches

•Maximum Allowable Temperature Difference Shall be

Limited to 35 Degrees F•Maximum Allowable Concrete Temperature Shall beLimited to 160 Degrees F

•Temperature Monitoring System to Ensure Compliance

•Thermal Control Plan Submitted Describing Methods andProcedures to Satisfy Requirements

•Temperature Monitoring System to Ensure Compliance

•Mix Design’s Conforming to SP601 Requirements

•Conforming to These Requirements will be at no Addition

(I-64 KRB) MASSCONCRETE

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 13/59

 

Insulated Forms

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 14/59

 

Insulated Blankets

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 15/59

 

Method of Controlling Maximum Temperature andDifferential

(EMBEDDED COOLING PIPE)

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 16/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 17/59

 

CL

PIER

7'-0"

15'-0"

15'-0

"

CL BOX

18'-3" 18'-3"12'-0" 12'-0"

60'-6"

18'-3"

18'-3"

12'-0"

12'-0"

60'-6"

14'-3" 9'-0" 7'-0"14'-3"

7'-0"

1

4'-3"

9'-0"

7'-0"

14'-3"

7' SHAFT (TYP.)

9'-0"

9'-0"

Main Pier Foundation

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 18/59

 

Main Piers

Transverse View Elevation View

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 19/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 20/59

 

Erection of the Form Traveler 

.

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 21/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 22/59

 

Form Traveler Construction

Balanced cantilever construction method

Strukturas form travelers with DOKA

formworkCross Sections varied from 16’ to 38’ inheight created unique formwork

challenges

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 23/59

 

Superstructure Cross-section

10'-0“SHOULDER

12'-0" AUXLANE

6'-0“OFFSET

3 TRAVEL LANES@ 12'-0" = 36'-0"

1'-6"

2" OVERLAY

NEAR MID-SPAN

1'-6"16'-0"

38'-0"

9"

1 3/8 '' VERTICALPT BAR

TRANSVERSE TENDON4-0.6'' STRANDS

5'-0"

NEAR MAIN PIER

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 24/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 25/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 26/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 27/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 28/59

 

Cantilever Cycle

L

T 1T 1

C P I E R

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 29/59

 

Cantilever Cycle

LC P I E R

 

1 W

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 30/59

 

Cantilever Cycle

LC P I E R

1 W

T 2

T 2

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 31/59

 

Cantilever Cycle

LC P I E R

1 W1 E

 

2 W

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 32/59

 

Cantilever Cycle

LC P I E R

1 W1 E

 

2 W

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 33/59

 

Cantilever Cycle

 

T 3

T 3

LC P I E R

1 W1 E

2 W

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 34/59

 

Cantilever Cycle

LC P I E R

1 W2 W1 E

2 E

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 35/59

 

Cantilever Cycle

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 36/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 37/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 38/59

 

Post Tensioning (Stressing)

Tendons stressed to 75% of guaranteed yieldstrength

Vertical P.T. Bar Longitudinal Deck Tendons

Cantilever Tendons

Draped TendonsSpan Tendons

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 39/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 40/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 41/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 42/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 43/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 44/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 45/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 46/59

 

Cantilever Tendons

 

Cantilever TendonDuctsSpare

Ducts

Anchorage

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 47/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 48/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 49/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 50/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 51/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 52/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 53/59

 

Span Tendons

Anchorage

SpanTendonDucts

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 54/59

 

Tendon Grouting

High Shear Colloidal Mixer 

Pre Bagged, Thixotropic, ZERO Bleed,grout supplied by BASF Chemical

Start grout from the Low Point to HighPoints

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 55/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 56/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 57/59

 

8/6/2019 OTEC (Kanawha River Bridge) s Williamson

http://slidepdf.com/reader/full/otec-kanawha-river-bridge-s-williamson 58/59

 

Low Points and High Points