KEY DATES 2018 2019 2020 2047 2048
Approvals and Land Access
Groundwater Exploration
Construction of Northern Wellfield
Operation of Northern Wellfield
Decommissioning, closure and rehabilitation
OZ MINERALS CARRAPATEENA PROJECTNORTHERN WELLFIELD
KEY INFORMATION/ Water exploration has been undertaken by OZ Minerals
since 2013
/ Water demand from the Northern Wellfield during mining operations is expected to be 5 ML/day, with peak demand up to 7 ML/day
/ Mining operations would also be supported by other existing local wellfields
/ The average salinity of the groundwater is 50,000 mg/L to 60,000 mg/L (seawater is about 35,000 mg/L)
/ The target aquifers are the Tent Hill Aquifer and the Pandurra Formation
/ The Tent Hill Aquifer is 50 metres thick and about 120 metres under the ground
/ The Pandurra Formation is up to 1,000 metres thick and about 210 to 360 metres under the ground
QUESTIONSContact the Community Relations Superintendent
at info@ozminerals.com
OZ Minerals is developing the Carrapateena mine approximately 160 km north of Port Augusta. To support mining activities, OZ Minerals is proposing to build a wellfield located north of the Mining Lease, referred to as the Northern Wellfield. The Northern Wellfield would include access roads, pipeline corridors, staging tanks, wellheads and pumps to source groundwater from deep underground aquifers to provide raw saline water to the mining operations. Access would be via a borefield road that connects to the existing Mining Lease access road.
June 2018June 2018
PernattyLagoon
LakeWindabout
Lake Torrens
Pernatty
Arcoona
Bosworth
Stuart
Highway
NORTHERN WELLFIELD
CARRAPATEENAMINING LEASE
Raw water tanks
Main transfer pipeline to Carrapateena Mine
Transfer pipelines from wellfield
Transfer pipeline to staging complex
Workshop facilities
Hardstand area
Diesel tank
Generator
Access
GeneratorDiesel tank
Overflow sump
Wellhead and rising mainAccess
Raw water collection tank
Workshop facilities, metering and telemetryRaw water from adjacent well
Overflow pipe
Overflow sump
OZ MINERALS CARRAPATEENA PROJECTNORTHERN WELLFIELD
/ Groundwater production wells would be equipped with submersible pumps, flow meters, telemetric controls, pole-mounted transformer, contactors and a motor starting panel
KEY INFRASTRUCTURE
TYPICAL WELLHEAD SETUP AND INFRASTRUCTURE
WATER DISTRIBUTION WELLFIELD STAGING COMPLEX
/ Produced water from the production wells would be transferred via buried and/or aboveground branch lines within the wellfield to wellfield staging complexes
/ Staging complexes store and transfer water through the pipeline infrastructure to the Carrapateena raw water pond once abstracted at production wells
/ The total capacity of each staging complex is approximately 2 ML (2 million litres)
/ Each staging complex is made up of a series of tanks, an emergency outflow reservoir and a series of pumps
/ The approximate footprint of each staging complex is approximately 200 m by 200 m
T: +61 8 8229 6600 | info@ozminerals.com | www.ozminerals.comT: +61 8 8229 6600 | info@ozminerals.com | www.ozminerals.com
OZ MINERALS’ SEB APPROACH
To develop the Carrapateena mine, OZ Minerals will clear native vegetation and native habitat. This land clearance requires delivery of environmental offsets as specified by the Government’s regulatory approval conditions.
OZ MINERALS CARRAPATEENA PROJECTENVIRONMENTAL OFFSET
OZ MINERALS WILL ADDRESS OFFSET REQUIREMENTS THROUGH A
COMBINATION OF PAYMENT AND ON-GROUND MEASURES
The South Australian Arid Lands Natural Resources Management (SAAL NRM) Board uses the payment to support programs and projects across the local region for environmental and sustainable use of
natural resources
OZ Minerals intends to partner with Nature Foundation South Australia to deliver the offset program for the first 10 year period, on Witchelina Pastoral Station, located 100 km north east of Carrapateena. Chosen as it is the nearest private conversation reserve with similar
suitable habitats and species.
PAYMENT INTONATIVE VEGETATION
FUND
PURCHASE SEB CREDITS FROM
NATURE FOUNDATION SOUTH AUSTRALIA
AN OFFSET IS AN AREA, OR MULTIPLE AREAS, OF LAND THAT ARE SET UP TO PROTECT NATIVE VEGETATION, SPECIES AND HABITAT. THERE ARE TWO KINDS OF OFFSETS RELEVANT TO THE CARRAPATEENA PROJECT.
ON-GROUND ENVIRONMENTAL
OFFSETEnvironment Protection and Biodiversity
Conservation Act 1999 (Cth)
SIGNIFICANT ENVIRONMENTAL
BENEFIT (SEB)Native Vegetation Act 1991 (SA)
$
SEE OVERLEAF
June 2018June 2018
OZ MINERALS CARRAPATEENA PROJECTENVIRONMENTAL OFFSET
OZ MINERALS’ ON-GROUND ENVIRONMENTAL OFFSET APPROACH
SIGNIFICANT ENVIRONMENTAL
BENEFIT (SEB)Native Vegetation Act 1991 (SA)
ON-GROUND ENVIRONMENTAL
OFFSETEnvironment Protection and Biodiversity Conservation Act 1999 (Cth) (EPBC Act)
Plains Mouse(Pseudomys australis)
Plains Mouse Habitat
THE PLAINS MOUSE IS A MATTER OF NATIONAL ENVIRONMENTAL SIGNIFICANCE
(MNES) UNDER THE EPBC ACT WHICH REQUIRES AN ON-GROUND ENVIRONMENTAL OFFSET APPROACH AS PART OF REGULATORY
APPROVAL CONDITIONS
Implementation has begun with the execution of an Offset Agreement with Nature Foundation South Australia for an area on Witchelina Pastoral Station
SECURE AN ENVIRONMENTAL OFFSET OF AT LEAST 1,740 HECTARES OF PLAINS MOUSE HABITAT
MANAGE THE OFFSET WITH AN ENVIRONMENTAL OFFSET MANAGEMENT
PLAN, DEVELOPED BY OZ MINERALS
T: +61 8 8229 6600 | info@ozminerals.com | www.ozminerals.comT: +61 8 8229 6600 | info@ozminerals.com | www.ozminerals.com
OZ MINERALSCONCENTRATE TREATMENT PLANT
OZ Minerals produces copper concentrates. These concentrates contain a mix of minerals that are high in copper and sold to domestic and overseas smelters to be converted into copper metal.The Concentrate Treatment Plant (CTP) is a proposed processing facility that utilises an innovative processing method to separate impurities from the copper, creating a higher grade copper concentrate. OZ Minerals is seeking to deliver a high grade concentrate with very low impurities to our customers. The premium product will have a higher market value and potentially open up new markets and opportunities for OZ Minerals.
CTP LOCATION/ The preferred location for the CTP is near Port Augusta
where a parcel of land has been purchased
/ This means while other sites, including Whyalla and Carrapateena, have not been discounted, the Port Augusta location has been selected to progress environmental and engineering studies in 2018
/ If the CTP is located near Port Augusta, the high grade concentrate may be trucked or railed to Port Adelaide and then shipped to customers
/ An iron and calcium precipitate (what’s left over) would be transported back to OZ Minerals’ Carrapateena operation
/ The CTP is separate to the Carrapateena project and has the potential to treat concentrate from both Prominent Hill and Carrapateena
/ A final investment decision is anticipated by the end of 2018.
OZ MINERALS’ PARTNERSThe CTP process has been developed by OZ Minerals and our project partners:
/ Orway Mineral Consultants – specialists in hydrometallurgy
/ Adelaide University’s Institute for Mineral and Energy Resources – host of the ARC Australian Copper Uranium Research Hub
/ The Government of South Australia’s Department of the Premier and Cabinet (then Department of State Development) – joint sponsor of University of Adelaide’s Institute for Mineral and Energy Resources
June 2018June 2018
T: +61 8 8229 6600 | info@ozminerals.com | www.ozminerals.comT: +61 8 8229 6600 | info@ozminerals.com | www.ozminerals.com
OZ MINERALSCONCENTRATE TREATMENT PLANT
DEVELOPMENT PHASES
The CTP project is in design phase and OZ Minerals is undertaking a range of environmental and engineering studies to inform the future direction of the project.
In 2017, a number of studies were completed including geotechnical investigations, baseline cultural heritage and environment work and trade-off studies. A successful pilot plant campaign was also completed, confirming plant performance.
OZ Minerals has committed to spend up to $12 million in 2018 to continue progressing study work on the CTP project. The primary focus of this work will be to improve the accuracy of capital and operating cost estimates. Development of the documentation to support government approvals is also underway.
Engineering consultants have been engaged to complete the remaining detailed study work, with a final investment decision on the project to be made by the end of 2018.
QUESTIONSContact the CTP Project Director at
info@ozminerals.com
Subject to the outcomes of the final design studies, the CTP will likely comprise:/ a rail siding, truck unloading area and container storage
yard/ a processing plant with a Copper Pressure Leach
autoclave, a Non-oxidising (Nonox) Leach autoclave and a Barren Liquor Treatment process
/ material filtration and handling infrastructure
STUDY WORK CTP COMPONENTS
COMMUNITY CONSULTATIONOZ Minerals is speaking regularly with neighbouring landowners and the local community to keep them
informed of the CTP project’s progress
PHASE 1
OPTION ASSESSMENTSComplete
IMPROVE PROJECT DEFINITIONUnderway
ENVIRONMENTAL BASELINE ASSESSMENTS
Underway
APPROVALSGOVERNMENT AND
OZ MINERALSUnderway
CONSTRUCTIONFinancial investment decision to progress by end of 2018
OPERATIONSFinancial investment decision to progress by end of 2018
PHASE 2 PHASE 3 PHASE 4 PHASE 5
Carrapateena ProvincePunt HillKhamsin
Fremantle Doctor
Eloise
Coompana
Musgrave Province
Alvito, Portugal
Oaxaca, Mexico
OZ MINERALS UPDATEEXPLORATION
OZ Minerals has a strong pipeline of exploration and development projects. OZ Minerals seeks opportunities that are aligned to its strategy, that meet rigorous investment hurdles and are value accretive before adding them to its portfolio. OZ Minerals’ exploration approach is a lean and agile one, underpinned by capital discipline.
APRIL 2018 EXPLORATION LOCATIONS
CARRAPATEENA PROVINCEPunt Hill / In discussions with traditional owners and landowners
to obtain local level agreementsKhamsin/ Drill hole testing of existing mineralisation underway / Encouraging bornite mineralisation intersected in first
Khamsin drill hole/ Over 2 km of drilling completed at the end of Q1 2018 Fremantle Doctor / Drilling to commence Q2 2018 DRILL RIG ON SITE AT KHAMSIN
June 2018June 2018
OZ MINERALS UPDATEEXPLORATION
T: +61 8 8229 6600 | info@ozminerals.com | www.ozminerals.comT: +61 8 8229 6600 | info@ozminerals.com | www.ozminerals.com
DRILL RIG ON SITE AT ELOISE
ELOISE PROJECT
OAXACA, MEXICO
ALVITO, PORTUGAL
COOMPANA
MUSGRAVE PROVINCE
/ Targeting Eloise style massive sulphides in partnership with Minotaur Exploration/ Located 60 km south-east of Cloncurry, Queensland/ Eight holes completed on the Jericho target, with all holes intersecting the
targeted mineralised system/ ~5,000 m drill program commenced April 2018
/ In July 2016, OZ Minerals entered into an agreement with Mithril Resources to explore seven exploration licences in South Australia’s far western Coompana Province
/ Local community support secured for drilling at Riqueza Marina/ Additional mapping and geochemical sampling at Zaachilia outlined
further copper mineralisation at surface
/ West Musgrave in Pre-Feasibility Study and stakeholder engagement has started / Work area and heritage clearances for East Musgrave to start in Q2 2018
/ Regional geologic mapping and potential field geophysics completed/ 2,100 m drill program started in April 2018
OAXACA COPPERMINERALISATION
ALVITO BRECCIATEDHOSTED COPPER (R)
June 2018June 2018
OZ MINERALS UPDATEPROMINENT HILL
Prominent Hill has continued to reinforce its credentials as a reliable, low cost producer. The mine life is currently to 2029 and OZ Minerals intends to convert enough of the existing estimated ~80 Mt resource each year to maintain a circa 10+ year mine life ahead of it. In March 2018, Prominent Hill transitioned to an underground-only mining operation with closure of the open pit. The processing plant will remain at full capacity of around 9 to 10 Mtpa to 2023 with the processing of stockpiled open pit ore and underground ore. Over one hundred million tonnes of ore had been mined from the open pit since it started 10 years ago.
UNDERGROUND OPERATIONS
/ Underground haulage ramp up is on track
/ A third and fourth decline is being built at Prominent Hill so production can ramp up
/ The third decline is under construction and will be completed in Q2 2018
/ The fourth decline is scheduled for completion in Q3 2018
/ Award of the run-of-mine and underground ore rehandle contract
/ Finalisation of tender process for the Malu paste plant
UNDERGROUND MINING, COMBINED WITH STOCKPILE PROCESSING, WILL MAINTAIN THE PROCESSING PLANT AT FULL CAPACITY TO 2023
UPCOMING ACTIVITY
OZ MINERALS UPDATEPROMINENT HILL
OPEN PIT CLOSURE
/ Malu Open Pit ore production was completed safely and on time
/ 12 m deep ‘Goodbye cut’ was completed at the base of pit
/ Minor south dump closure works and open pit abandonment bund construction is ongoing as part of commitment to progressive mine closure
/ Safe and timely demobilisation of excess contractor equipment taking place in Q2 2018
OPEN PIT AT COMPLETION OF MINING ON 28 MARCH 2018
T: +61 8 8229 6600 | info@ozminerals.com | www.ozminerals.comT: +61 8 8229 6600 | info@ozminerals.com | www.ozminerals.com
Carrapateena is one of the largest mines under construction in Australia and will generate around 1,000 jobs from construction through to production.Located approximately 160 km north of Port Augusta in South Australia, Carrapateena will be a 4.25 Mtpa copper-gold underground mine with an estimated life of 20 years. Carrapateena is situated on Pernatty Pastoral Station with supporting infrastructure located on Oakden Hills Pastoral Station. The Kokatha People are the traditional owners of the land.
The Carrapateena Project’s Australian Industry Participation Plan requires the project to foster relationships with key regional stakeholders, providing business and employment opportunities directly, and through it's major contractors who are also critical stakeholders for the project
OZ MINERALS CARRAPATEENA ENTERPRISELOCAL SUPPLIERS AND CONTRACTORS
/ OZ Minerals has partnered with Global Maintenance Upper Spencer Gulf (GMUSG) to drive local content activities, facilitating connection of local businesses to the Carrapateena project supply chain
/ OZ Minerals has actively facilitated lead contractor introductions to local suppliers and businesses, which has resulted in a number of Indigenous and local contractors and suppliers being engaged onsite
OZ Minerals is committed to prioritising sustainable local procurement and local employment, with particular attention on the Upper Spencer Gulf and Outback Communities
OZ MINERALS APPROACH
PROJECT UPDATE
INFORMATION AND SUPPORT
HOW TO GET INVOLVED
1Register your business
on the ICN portalozminerals.icn.org.au
2Register to
receive alerts on the Carrapateena Project
3Update your
business profile
4Download and
fill in yourpre-qualification form
5Submit an
Expression of Interest or respond to a
Request for Tender
Global Maintenance Upper Spencer GulfContact Mark Malcolm on
0419 820 641, mark@markmalcolm.com.auwebsite: www.gmusg.com
Industry Capability Network (ICN SA)Contact Gavin Asikas on
(08) 8303 2472, gavin.asikas@sa.gov.auwebsite: ozminerals.icn.org.au
June 2018June 2018
OZ MINERALS CARRAPATEENA JOB CREATIONEMPLOYMENT OPPORTUNITIES
KOKATHA COMPLETE JOINT VENTURE
HOW TO FIND OUT ABOUT JOB OPPORTUNITIES
HOW TO REGISTERRegister with Kokatha Complete Joint Venture
at www.complete-personnel.com.auPaul Hancock at (08) 8642 0900 or40 Flinders Terrace, Port Augusta
T: +61 8 8229 6600 | info@ozminerals.com | www.ozminerals.comT: +61 8 8229 6600 | info@ozminerals.com | www.ozminerals.com
OZ Minerals is partnering with Kokatha Complete Joint Venture (KCJV) to facilitate direct pathways to all OZ Minerals and contract partners. KCJV are our preferred labour suppliers and experts on local sourcing.
OZ Minerals is Australia's third largest copper producer. We own and operate the Prominent Hill copper-gold-silver mine and are advancing the Carrapateena copper-gold project, which is currently in construction phase. We have a pipeline of exploration growth opportunities, with the most advanced being the West Musgrave copper-nickel project currently in scoping study phase.We are a Modern Mining Company creating value for our stakeholders through operating a lean business with a copper core, having multiple assets and a customer focus.We know our greatest asset is our people. That's why we're committed to attracting, motivating and retaining the very best.
/ Register with Kokatha Complete Joint Venture / Visit our website ozminerals.com/careers / Search for advertised OZ Minerals roles based on a range of criteria (e.g. location, profession, etc.) / Apply for advertised roles/graduate or vacation positions via our website’s Careers section/ Receive job alerts by creating a profile of your preferences. This will allow us to contact you when an
opportunity of interest becomes available
top related