pearce portfolio
Post on 13-Jul-2015
259 Views
Preview:
TRANSCRIPT
E P
Academic Portfolio Doric AediculeHand drafting and watercolor
Academic Portfolio Chicago Townhouse
Hand drafting and watercolor
Academic Portfolio Community Theater
AutoCad drafting and watercolor
Academic Portfolio Community Theater
AutoCad drafting and watercolor
Academic Portfolio Pittsburgh Strip District - Urban Design
AutoCad drafting and colored pencil
Academic Portfolio Pittsburgh Strip District - Urban Design
Hand sketching and watercolor
Academic Portfolio Pittsburgh Strip District - Urban Design
Hand sketching and watercolor
Academic Portfolio Cristo Rey High School
AutoCad drafting and Photoshop
Academic Portfolio Cristo Rey High School
AutoCad drafting, Photoshop, & SketchUp (right) Hand sketching and watercolor
Professional Work
ROLES AND RESPONSIBILITIES:
•Created color rendering for public display and use at city council meetings.
•Designed complimentary architectural elements. (ie bus stops, parking ticket booths, etc.)
•Created graphic design elements for signage in the airport.
PROJECT DESCRIPTION:A new airport in Santa Barbara, California.
Santa Barbara AirportColor rendering in water color
Design and drafting by Fred Sweeney, PMSM Architects
Professional WorkChicago Public High School
Rendering by others
ROLES AND RESPONSIBILITIES:
•Served as part of the production staff from DD 60% though bidding addenda.
•Assisted in the development of various construction details.
•Picked up permit revisions and helped respond to multiple stages of review comments.
PROJECT DESCRIPTION:Thirty million dolar renovation and addition to an existing Chicago public high school. The project included a new competition gymnasium and swimming pool.
Professional Work
ROLES AND RESPONSIBILITIES:
•Aided in the investigative and urban planning dimension of the project.
•Developed schematic 3D massing models of the site and the planned development.
•Presented to the development team.
•Created initial facade studies.
PROJECT DESCRIPTION:A planned multi-family residential development on the south side of Chicago.
Multi-family Residential DevelopmentMassing model in SketchUp
Facade in AutoCad
Professional Work
ROLES AND RESPONSIBILITIES:
•Served as Project Manager.
•Worked with Client (Capital Development Board of Illinois) and the End User (Illinois Department of Public Health) to create an acceptable design solution within budget.
•Created bid documents and oversaw bidding process.
•Remained Project Manager for the Construction Administration phase and reviewed all submittals and shop drawings.
PROJECT DESCRIPTION:The renovation of two existing rooms in a public health laboratory building.
Public Health LaboratoryPhotograph of existing conditions
Professional Work
ROLES AND RESPONSIBILITIES:•Led Construction
Administration team. •Produced bi-monthly fieldreports over the course of construciton.
•Reviewed and processed submittals and RFIs.
•Actedasmyfirm’srepresentative at weekly Owner/Architect/Contractor fieldmeetings.
•Reviewed pencil draws and PCOs.
•Coordinated with the site superintendent to troubleshoot construction issues.
•Regularly produced fieldsketches to better explain problems and/or solutions to the construction team.
PROJECT DESCRIPTION:Five buildings in a multi-family residential development which covered two city blocks.
Multi-family Residential DevelopmentPhotograph of site mid-construction
&fieldsketch
top related