PEB Steel Alliance Ltd.

PRIDE OF OUR NATION...

MISSION

For PEB Steel Alliance to be

recognized as the benchmark in

the steel buildings industry. This

will be accomplished through

product perfection, engineering

Excellence and the Best customer

services in the industry.

VISSION To bring the PEB technology to where

it is most needed in the world and help others

"build a better life", through industrialization.

To (jointly) build high capacity, efficient & cost effective steel factories for

speedy delivery and for benefiting from “economies of large scale”.

To design and fabricate safe and technologically advanced buildings.

To offer customers versatility in design & fabrication to meet their exact

building requirements.

To offer customer services second to none in the industry.

VALUES

Be a leader and not a follower.

Share knowledge and success with others.

Forge local alliance wherever you go.

Apply only the latest design and buildings

codes.

Continually improve our products.

Customer services make all the difference;

customers are lifetime partners, always seek a

win-win solution.

The longest journey begins with the smallest

step, so begin with the end in mind and focus

on the long term, not just the short term.

Factory Location & General Info Location:

Chouddogram, Comilla

Distance:

112 km from Dhaka,

Beside Highway

Total Land Ar.: 35,000 m2

Factory Area:

Main frame Sectn.7650 m2

Cold form Sectn: 863 m2

Total Factory Ar. :9513 m2

Production Capacity: Over all

production capacity is 3000

MT per month.

Starting Date of production:

October 08

Factory Facilities BUILT UP & COLD FORMED SECTION NOS.

OVERHEAD CRANES:

Capacity: 10 tons

Capacity: 05 tons

Capacity: 2.5 tons

03

06

02

Fork Lift (Capacity: 5 tons) 01

CNC FABRICATION EQUIPMENT:

Band Saw

Punch & Shear Machines

Gas CNC Profile Cutting Machine

CNC Drilling Line

Plate Drill

Straightening Machine

Fit up Machine

Air Compressor

Radial Drilling Machine

01

01

01

01

02

01

01

01

06

02

EQUIPMENT NOS.

Angle Line

12 mm Shearing Machine

Bending Machine

Beveling Machine

01

01

01

02

WELDING EQUIPMENT:

Gas Shield Arc Welder 500 APS

Full Automatic Built-up Welding Line

AC Arc Welder

Fitting jig for welding line

50

02

01

BLASTING EQUIPMENT:

Shot Blast

INSPECTION EQUIPMENT:

Magnetic Particle Testing Machine

Painting Thickness Gauging

01

01

01

01

02

Factory Facilities

EQUIPMENT NOS.

3-12 mm Shear

Press Break

Bending Machine

PE 1000 Roll Former

PW 900 Roll Former

“Z” Purlin Roll Former

“C” Purlin Roll Former ( 2 nos for different sizes)

01

01

01

01

01

01

02

Factory Facilities

PEBSAL FaCTORY AT A GLANCE

PEBSAL FaCTORY office

Reception

Office

PEBSAL FaCTORY mANAGEMENT

Engr. Parvez Mahmud Plant Manager

Engr. Abdus Sahil Production In-Charge

Scope of work

Built-Up Sections Preparation •Column

•Rafter

•Joist

•Beam etc

Cold-Form Preparation •Purlin

•Sheeting

•Triming etc

BUILT UP fabrication process

BUILT UP fabrication process

Hot- Rolled Plates are Conveyed to the machine to make desired sized Plate

BUILT UP fabrication process

Materials Collection. Highest 12mm thick Plates can be cut by this Machine

BUILT UP fabrication process

This Machine is used to cut 12-75 mm thick Plate

BUILT UP fabrication process

The Nobs are Adjustable. 7 nos Plates become ready in one time

BUILT UP fabrication process

Circular Holes are easily made by this full automated machine

BUILT UP fabrication process

The Required sized plate is now being prepared to make built-up sections

BUILT UP fabrication process

Flanges & Webs are placed in place on the Assembly Line

BUILT UP fabrication process

Assembly Line rolls the Material to Fit Jig Machine.

BUILT UP fabrication process

The Flanges are Automatically being in place and Web goes between two Flanges

BUILT UP fabrication process

Fit Jig Machine holds the web in place and some tag welding is done to prepare material ready to go to the Submerged Arc Welding Machine

BUILT UP fabrication process

The best Quality Welding is Ensured by this machine

BUILT UP fabrication process

The welding depth is regulated by computer programming

BUILT UP fabrication process

The Welding Property is Verified. Welding in one side is completed

BUILT UP fabrication process

BUILT UP fabrication process

BUILT UP fabrication process

BUILT UP fabrication process

COLD FORMED fabrication process

Cold form fabrication process

Cold form fabrication process

Best quality accessories

Best quality accessories

top related