Performance-based Regulation Market in PJM

www.pjm.com

based Regulation Market in PJM

PJM©2014

Eric Hsia

Manager, Performance Compliance

NJ Energy Storage Working Group

July 29, 2014

• October 2011 – FERC Order 755 issued

• March 2012 – PJM Original filing w/ Benefits Factor

• May 2012 – Acceptance Order, subject to additional compliance filing

• October 2012 – PJM “go live” of PBR, but without incentive payment structure

2

• October 2012 – PJM “go live” of PBR, but without incentive payment structure

• November 2012 – Acceptance Order, subject to additional compliance filing

• January 2013 – PJM Compliance Filing w/ Mileage Ratio

• July 2013 – Acceptance Order, subject to additional compliance filing

• October 2013 – Final Acceptance Order

www.pjm.com

FERC Process

FERC Order 755 issued

PJM Original filing w/ Benefits Factor

Acceptance Order, subject to additional compliance filing

PJM “go live” of PBR, but without incentive payment structure

PJM©20142

PJM “go live” of PBR, but without incentive payment structure

Acceptance Order, subject to additional compliance filing

PJM Compliance Filing w/ Mileage Ratio

Acceptance Order, subject to additional compliance filing

Final Acceptance Order

5 MAJOR COMPONENTS OF

PERFORMANCE-BASED REGULATION

3

PERFORMANCE-BASED REGULATION

5 MAJOR COMPONENTS OF

BASED REGULATION

PJM©20143

BASED REGULATION

1. TWO REGULATION SIGNALS

4

1. TWO REGULATION SIGNALS

PJM©20144

Dynamic Signal (RegD):More ‘zero’ crossings“Energy neutral” over operating hourStrong correlation with system frequency

5

Traditional Signal (RegA):Greater time constant, more staying power

Slower rampingStrong correlation with system ACE

Sample RegA Test Signal (MW)

Dynamic Signal (RegD):More ‘zero’ crossings“Energy neutral” over operating hourStrong correlation with system frequency

Two Signals, Complimentary to System Control

PJM©20145

-1.100

-0.600

-0.100

0.400

0.900

00:00 07:12 14:24 21:36 28:48 36:00

No

rma

lize

d R

eg

A S

ign

al

Time (MM:SS)

Sample RegA Test Signal (MW)

6

Two Signals, Complimentary to System Control:5 Hour sample of production signal

PJM©20146

• What is the relative impact on

system control with fast vs.

traditional resources?

7

• What is an optimal mix of fast vs.

traditional resources, and how does

that impact the Regulation

Requirement?

www.pjm.com

KEMA Report (2011)

PJM©20147

2. CALCULATING MILEAGE

8

. CALCULATING MILEAGE

PJM©20148

• Mileage is the absolute sum of movement of the regulation signal in a given

time period (∆MW/MW)

• Resources following the dynamic signal will move much more than those on

traditional signal

9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Historical Jan-Jun 2012 Signal Mileage

Traditional

Mileage

Mileage is the absolute sum of movement of the regulation signal in a given

Resources following the dynamic signal will move much more than those on

March 7, 2014

PJM©20149

15 16 17 18 19 20 21 22 23 24 25 26 27 28

Jun 2012 Signal Mileage

Traditional Dynamic

March 7, 2014Dynamic Mileage = 16.5Traditional Mileage = 6.4

3. CALCULATING PERFORMANCE

10

. CALCULATING PERFORMANCE

PJM©201410

Accuracy – the correlation or degree of relationship between control signal and regulating unit’s response

Delay – the time delay between control signal and point of highest correlation (from A).

Precision – Difference between the areas under the curve for the control signal and the regulating unit’s response.

11

Composite Performance Score = A [ScoreC] + B [ScoreD] + C [Score

– A, B, C are scalars from [0..1], total to 1 – Produces a weighted average of component scores

Performance Score – 3 pieces

the correlation or degree of relationship between control signal and regulating unit’s response

the time delay between control signal and point of highest correlation (from A).

Difference between the areas under the curve for the control signal and the regulating unit’s response.

PJM©201411

] + C [ScoreP]

Produces a weighted average of component scores

Performance Score

12

Performance Score – Example, Combine Cycle

Accuracy = 0.95

Delay = 0.66

Precision = 0.74

PJM©201412

Total Score = 0.78

1/6 1/11 1/16 1/21 1/26 1/31

Steam

Average Performance Scores by Resource Type (Jan ‘13)

13

Pe

rfo

rma

nce

Sco

re

1/6 1/11 1/16 1/21 1/26 1/31

Battery

0.4

0.5

0.6

0.7

0.8

0.9

1.0

1/1 1/6 1/11 1/16 1/21 1/26

Pe

rfo

rma

nce

Sco

re

Hydro

Average Performance Scores by Resource Type (Jan ‘13)

PJM©201413

0.4

0.5

0.6

0.7

0.8

0.9

1.0

1/1 1/6 1/11 1/16 1/21 1/26

Pe

rfo

rma

nce

Sco

re

Demand-side Resources

4. EFFECTIVE MEGAWATTS (THE BENEFITS FACTOR)

14

. EFFECTIVE MEGAWATTS (THE BENEFITS FACTOR)

PJM©201414

• Benefits factor provides a sliding scale that makes dynamic resources more

desirable until the optimal resource mix of dynamic and traditional resources is

reached.

Benefits Factor of First Resource

Benefits Factor of Second Resource

15

Benefits Factor of Second Resource

Point when RegD resource is equivalent to RegA resource

Benefits Factor

Benefits factor provides a sliding scale that makes dynamic resources more

desirable until the optimal resource mix of dynamic and traditional resources is

Benefits Factor of Second Resource

PJM©201415

Benefits Factor of Second Resource

Point when RegD resource is equivalent to RegA resource

Point of Diminished Returns

5. TWO PART OFFER, TWO PART SETTLEMENT

16

5. TWO PART OFFER, TWO PART SETTLEMENT - EFFECTED BY 1-4

PJM©201416

Regulation Offer

CostUp to limits described in as

described in M11, Section 3.2.1 and Manual 15,Section 2.8

Performance

17

• The $/∆MW will be multiplied by the ratio of ∆convert to ($/MW)

Capability ($/MW)

Reservation Cost for MW which

includes the Fuel Cost increase and $12 Margin Adder

Performance ($/∆MW)

Is the incremental cost of MW movement

which includes Cost Increase due to Heat Rate Increase during

non-steady state operation and Cost Increase in VOM

Regulation Offer

PriceUp to 100 $/MWH As described in

M11, Section 3.2.1

Regulation Offers – Cost and Price

PJM©201417

MW will be multiplied by the ratio of ∆MW/MW for the signal that resource follows to

Capability ($/MW)

the price to reserve MWs for regulation

Performance ($/∆MW)

the price to provide regulation movement

The Capability Offer is adjusted as follows:

Resource owner’s Offer for reserving MW’s

18

Benefits factor translates a Dynamic resource’s MWs into traditional MWs to estimate Effective MWs. For Traditional

resources, this value is “1”.

The Capability Offer is adjusted as follows:

Qualified Regulation MW’s

Resource owner’s Offer for

Adjusted Capability Offer

PJM©201418

Average of last 100 hours of performance scores

Benefits factor translates a Dynamic resource’s MWs into traditional MWs to estimate Effective MWs. For Traditional

resources, this value is “1”.

30 day average of historical

The Performance Offer is adjusted as follows:

Resource owner’s Offer for MW’s movement

19

Benefits factor translates a Dynamic resource’s MWs into traditional MWs to estimate Effective MWs. For Traditional

resources, this value is “1”.

30 day average of historical mileage

The Performance Offer is adjusted as follows:

Qualified Regulation MW’s

Adjusted Performance Offer

PJM©201419

Average of last 100 hours of performance scores

1 YEAR+ --

20

-- RESULTS

PJM©201420

21

Pricing

PJM©201421

Milford Control Center:

Solar + Storage

Milford Control Center:

Solar + Storage

PJM©2014

23

Laurel Mountain, West Virginia (AES Energy Storage)

Largest Li-ion battery in the world

32 MW, 8 MWh

Provides fast-response Frequency Regulation in PJM’s Wholesale Markets

PJM©201423

Laurel Mountain, West Virginia (AES Energy Storage)

response Frequency Regulation in PJM’s Wholesale Markets

24

Ecoult and Deka Ultrabattery ®

3 MW (<3 MWh)

Regulation Service, from behind the meter

PJM©201424

25

Viridity Energy and Axion PowerCube™

500 kW

Regulation Service, from behind the meter

PJM©201425

Viridity Energy and Axion PowerCube™

26

VCharge, Inc

4-5 kW (aggregated to >100 kW)

Regulation Service, from behind the meter at multiple locations

PJM©201426

from behind the meter at multiple locations

Market Test

27

Credit: Tim Shaffer for The New York Times

Market Test – Electric Vehicles and Ancillary Services

PJM©201427