Phillips Park Bicycle Bridge
Group 98.07
Benjamin Osborne
Brian Richard
Jeffrey M. Lawrence
Francisco Narvaez-Fabrega
Advisor - Dr. Michael Santare
Mission
Approach
To redesign a cost-effective widened overpass and bridge with all safety and accessibility
concerns addressed.
To use benchmarking along with TQD to develop and decide upon an improved bridge design satisfying our
customers’ wants within building code constraints.
Willett Kempton Coordinator Off Road Bike CommitteeTom Zaleski
Parks SuperintendentLiam Campion
Skate Shop ClerkRobert Gifford
Roller Blade Enthusiast
Jim WoodsHandicapped Traveler
Brian DearolfMountain Biker
Anthony RipantiNewark Pedestrian
Jack McFannLocal Resident
Wheeled AccessableSkateboard DeterrantWide PassageEasily AccessableWheels Cannot Get StuckGuard RailsWeather Proof
Non-Slipperay SurfaceNatural ApperanceVandal DeterrantQuiet Operation
Continous PathwayQuiet ConstructionNature Observable
Major Gary Summerville
Public Safety Trails for the Twenty-First Century
Rails-to-trails Conservancy Recommended Bridges
Amtrack cross in South College
Rail line across Rt. 4 Old Structure
Board Spacing
Ramp Pitch
Platform Width
Railing Height
Color / Form
Traction
Life
Sound
Crossing Time
Sight Line
Close slats on platforms
Wide slats on ramp Rumble Strips on
ramp Uneven approach to
ramps Railings on bridge /
overpass
Decide upon ramp pitch
“Soft” region Bridge support Tight ramp railings Add new beam to
widen
Concept Ident. Concept DescriptionsA "Wheelchair" Bridge
B Skateboarders' Nightmare
C Happy Compromise
A Prioritized List of Wheel Skate HappyQuality Metrics % Target value
Board Spacing 16.72 0.25 in. b w b
Ramp Pitch 15.05 3-12 b b b
Platform Width 15.05 8 ft. b b b
Railing Height 11.71 56 in. b b b
Color / Form 11.71 7 s s s
Traction 7.36 0.4 s w b
Life Expectancy 7.02 20 years b b b
Sounds 6.02 40 db s s s
Crossing Time 4.68 30 sec b b b
Sight Line 4.68 30 ft. s s s
Better than benchmark 6 5 7Worse than benchmark 0 2 0Same as benchmark 4 3 3Unknown relationship 0 0 0
Score 0% 68% 36% 76%
Test ResultRamp Pitch okayPlatform Width 1.5 ft.Railings 1/2 inchBoard Spacing okayCrossing Time 17 sec.Sight Line 85 ft.Tractor Test okay
Upon the initial prototype build, we realized that the railing construction was not adequate for our testing procedure. We therefore replaced the 2x4 railing posts with 4x4’s. Also, the 2x4 railings were replaced with 2x6’s.
In the design, the ramps were extruded normal to the platform. In the construction, we had to angle them to fit with the natural path and surroundings.
Start from scratch
Equidistant / symmetrical construction
Build second structure
Not rule out skateboard issue
Observation platform
Item Quantity Cost Each Total Cost6"x6"x8' 16.00$ 20.99$ $335.842"x10"x12' 18.00 18.49 $332.822"x10"x14' 10.00 19.99 $199.90deckingx8' 120.00 5.69 $682.80deckingx10' 50.00 6.99 $349.504"x4"x6' 33.00 5.49 $181.172"x6"x12' 38.00 7.49 $284.623/8"x8" Carriage Bolts 92.00 1.49 $137.083/8" Washer 92.00 0.05 $4.603/8" Nut 92.00 0.05 $4.60Decking Screws 50lb 45.00 $45.001/2"x8" Lag Bolts 32.00 1.49 $47.68
Total: $2,605.61
Task Man HoursFootings 16Stringers 16Crossbeams 8Decking 16Ramp 1 32Ramp 2 32Railings 24Total: 144