pilot experiences. meeting cÓrdoba pilot experiences wp5 pilot experiences: design, implementation...

Post on 06-Jan-2018

222 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

DESCRIPTION

MEETING CÓRDOBA PILOT EXPERIENCES WP5 Pilot experiences: design, implementation and validation Optional Solutions - 1st. Solution: container veneering (aesthetic covering) - 2nd. Solution: underground containers. - 3rd. Solution: waste storage in public use room. - 4th. Solution: waste storage in private use room -Great producers (business with >300 sq meters that produce > 1 cubic meters of waste) - 5th. Solution: doorstep collection in difficult spaces. How many pilot experiences we perform? At least 10 PILOT EXPERIENCES expected to be implemented

TRANSCRIPT

PILOT EXPERIENCES

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

WP5 Pilot experiences: design, implementation and validation

WP5 Coordinator: P1

PPs involved: all

WP5 is engaged in the exact design, implementation and validation of 5 pilot solutions concerning waste deposit and collection for their applicability in medinas/city centres

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

WP5 Pilot experiences: design, implementation and validation

Optional Solutions

- 1st. Solution: container veneering (aesthetic covering)- 2nd. Solution: underground containers. - 3rd. Solution: waste storage in public use room. - 4th. Solution: waste storage in private use room

- Great producers (business with >300 sq meters that produce > 1 cubic meters of waste)

- 5th. Solution: doorstep collection in difficult spaces.

How many pilot experiences we perform? At least 10 PILOT EXPERIENCES expected to be implemented

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

Year 2014 2015Month 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

5.1 BD.5.3 VS5.4 AD5.6 Imp5(2,5,7,8) M.5.9 Val

WP5 Process phases5.1 Basic Design (Basic project) SADECO5.(2,5,7,8) Meeting (Córdoba,Sfax,Ragusa, Alejandria) P1, P4, P2,P65.3 Virtual Simulation of the 5 solutions P15.4 Adaptation of the model of general applicability to their local reality

Licenses, permissions and administrative pre-requisites Partners, Associates 5.6 Pilot experiences Contracting and Implementation Partners, Associates 5.9 Validation of pilot experiences Partners, Associates

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

Year 2014 2015Month 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

5.1 BD.5.3 VS5.4 AD5.6 Imp5(2,5,7,8) M.5.9 Val

WP5 Process phases5.1 Basic Design (Basic project) SADECO5.(2,5,7,8) Meeting (Córdoba,Sfax,Ragusa, Alejandria) P1, P4, P2,P65.3 Virtual Simulation of the 5 solutions P15.4 Adaptation of the model of general applicability to their local reality

Licenses, permissions and administrative pre-requisites Partners, Associates 5.6 Pilot experiences Contracting and Implementation Partners, Associates 5.9 Validation of pilot experiences Partners, Associates

MEETING CÓRDOBAMEETING CÓRDOBA

BASIC PROYECT

MEETING CÓRDOBAMEETING CÓRDOBA

-Dimensions: vary according to container model and size-Material: galvanized Steel and/or stainless Steel-Parts: front part, front folding doors or cam system with hydraulic damper,fixed sides and rear parts, opening lid through a frontal pedal-Support: height adjustable feet with rubber cushion

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBAHeight: 1,84 mLength(2/3/4 containers):2,94/4,14/5,35 mOccupied area (2/3/4 containers): 5,41/7,62/9,84 squared mArea/container (2/3/4 containers):2,7/2,5/2,5 squared m/containerUnderground height: 2,17 mStructure height: 1,70 mEntrance height: 0.96 mEntrance width: 0,73 m

Steel structure: St 37Machined Steel: F-114Corrosion protection: 60-200 micron hot galvanizedProfiles: structural tube y LFloor plate: folded 4 mm, hot dip galvanizedCover plate: flat plate 3 mm, hot dip galvanizedMovement stabilizer: simple scissor

 Hydraulic circuit: guided hoses and fittings galvanized fairingsPressure high / work at break: 200/330/1320 barNumber of heads/bore/stroke: 2 / 40-55mm / 1700 mmQuality used oil: ISO-46

 Pending: <15%Lid pavement: 60 mmProtection to water: board EPDMCrosswalk between containers: 500 mm

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

INSTALATION BUDGET (€) CAPACITY (m3) €/m3

DOOR TO DOOR COLLECTION

35 l 16 0,035 457

120 l 50 0,12 417

700 l 125 0,70 179

1100 l 200 1,10 182CONTAINER VENEERING

(INDIVIDUAL)  1100 l 2.575 1,10 2.341

CONTAINER VENEERING (GROUP)

INSTALACIÓN TIPO 1 3.792 1,90 1.996

INSTALACIÓN TIPO 2 5.307 3,00 1.769

INSTALACIÓN TIPO 3 12.309 9,87 1.247

UNDERGROUND CONTAINERS

2 UD 15.948 2,20 7.249

3 UD 17.527 3,30 5.311

4 UD 21.265 4,40 4.833WASTE STORAGE FOR PRIVATE

USE 6 UD 1000 l  9.940 6,00 1.657

WASTE STORAGE FOR PUBLIC USE

WITH EXTERNAL ENTRANCE

40.227 6,00 6.705

WITH INTERNAL ENTRANCE 57.478 6,00 9.580

ACTIVITY BUDGET

MEETING CÓRDOBAMEETING CÓRDOBA

BUDGET

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

MEETING CÓRDOBAMEETING CÓRDOBA

VIRTUAL SIMULATION

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

SocialEnvironmentalFunctionalEconomical 

 

User centered design methodology

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

SocialEnvironmentalFunctionalEconomical 

 

User centered design methodology

Prior to the presentation of the project

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

SocialEnvironmentalFunctionalEconomical 

 

User centered design methodology

From Jordan to Córdoba Meeting

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

SocialEnvironmentalFunctionalEconomical 

 

User centered design methodology

NOW – First Iteration

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

SocialEnvironmentalFunctionalEconomical 

 

User centered design methodologyFrom NOW to mid JULY – Second Iteration

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

Deliverables

Virtual Simulation UCO

• VR Simulation of solutions

•Experts poll

•VR Simulation of solutions Rev. 2

•Experts and public poll

•…. Rev. 3 to final revision.

•Conclusions and recommendations. Update of functional specifications

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

FIRST ITERATION

Virtual Simulation in Usability Laboratory UCO

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

GADGETS

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

GADGETS

Action Movement

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

What does the test consist in?

Using the OCULUS VR Headset and the Wiimote to control movement, each solution will be tested by each participant, while being recorded withHD cameras. All the information will be processed lately by UCO.

After the VR test, each participant will answer a cuestionaire.

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

WHERE?

MEETING CÓRDOBAMEETING CÓRDOBA

Time

P6 MOMA

2 person

RV

Ass Alt-Sat2

peopleRV

P7 UJO2 people RV

+1 

P2 Ragussa2 people

RV

P3 SVIMED

2 peopleRV

P5 ARDES+Ass M

Alex

P8 ALEX UNI2 people

Rv+1

14:30

Bus Rectorate to CITEC Bus CITEC a CMC

15:00

RV aid coffee VISIT CMC

15:20

T RV aid

15:40

coffee T RV

16:00

aid coffee T BUS CMC a CITEC

16:30

BUS CITEC CMC RV aid    

16:40

VISIT CMC T RV coffee coffee

17:00

coffee T RV aid

17:20

aid coffee T RV

17:40

    aid T

18:00

BUS CMC to CITEC BUS CITEC to Town Hall

18:30

  VISIT TO THE COLLECTION AND DEPOSIT SYSTEMS

19:30 

PILOT EXPERIENCES

SCHEDULETime to:-VR Simulation.-Fulfill the cuestionaire.

MEETING CÓRDOBAMEETING CÓRDOBA

Time

P6 MOMA

2 person

RV

Ass Alt-Sat2

peopleRV

P7 UJO2 people RV

+1 

P2 Ragussa2 people

RV

P3 SVIMED

2 peopleRV

P5 ARDES+Ass M

Alex

P8 ALEX UNI2 people

Rv+1

14:30

Bus Rectorate to CITEC Bus CITEC a CMC

15:00

RV aid coffee VISIT CMC

15:20

T RV aid

15:40

coffee T RV

16:00

aid coffee T BUS CMC a CITEC

16:30

BUS CITEC CMC RV aid    

16:40

VISIT CMC T RV coffee coffee

17:00

coffee T RV aid

17:20

aid coffee T RV

17:40

    aid T

18:00

BUS CMC to CITEC BUS CITEC to Town Hall

18:30

  VISIT TO THE COLLECTION AND DEPOSIT SYSTEMS

19:30 

PILOT EXPERIENCES

SCHEDULETime to:-Talk to Marisa and Gema

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

SECOND ITERATIONVirtual Simulation in each country using a PC UCO with the aid of will be available at www.smotproject.eu in each PARTNER the next weeks.

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

FURTHER STEPS (After the end of July to Sfax Meeting)

Constructive project (Adaptation of the solutions) PARTNERS

• Dense documentation containing exhaustive engeneering and architectural

Specifications (Including updated functional specifications).- Executive briefing

- Descriptive memory

- Technical prescriptions

- Measurements and budget

- Plans

• The constructive project shall have to be certified by a competent authority in

terms of compliance of technical and constructive regulations.

MEETING CÓRDOBAMEETING CÓRDOBA

PILOT EXPERIENCES

FURTHER STEPS (After the end of July to Sfax Meeting)

Constructive project PARTNERS

PILOT EXPERIENCES

PILOT EXPERIENCES

Thank for your attention.

Any questions?

top related