Project title

Project number Date issued Scale

DateDrawn by

Drawing no.Sheet title

K-W Studio

519.575.2227 1.877.789.6662

www.mmmc.on.ca

ARCHITECTSMMMCBrantford Studio

127 Brant Ave., Brantford,ON N3T 3H5

519.756.6331 1.877.789.6662

564 Weber St. N., Suite 1, Waterloo,ON N2L 5C6

5 STOREY, 320 BED LONG TERMCARE FACILITY

OTTAWA ONTARIO

1844

SITE PLAN A100

1:500

VP 2020-07-01

REVERA

40,003

74,688

FR

BF

FR

BLOCK 8

BLOCK 5

BLOCK 2

BFBF

BF

DC

DC

LP

LP

LP

LP

LP

LP

W

WW

W

W

W

W

W

W

W

W

W

W

WW

W

W

W

LP

DC

RAMP DO

WN

27,990

CHAMPLAIN STREET

JOHN HOLDEN WAY

FAMILLE-CÔ

TÉ AVENUE

10

12

11

11

11

RESIDENT SECURECENTRE COURTYARD

FIRE ROUTE

16 BEDS

16 BEDS

16 BEDS

16 BEDS

PROPOSED 5-STOREY320 BED

LTC BUILDING

FIRST FLOOR 61.4mBASEMENT 57.8m

911

RESIDENTSECURE

WESTCOURTYARD

LANDSCAPEDOPEN SPACE

3

3

4

BLOCK 42.56 ACRES

0

HP

XMH

XCB

LP

W

SITE PLAN LEGEND

PROPERTY LINE

CHAIN LINK FENCE

HEAVY DUTY ASPHALT

LIGHT DUTY ASPHALT

BUILDING EXIT

BARRIER FREE PARKINGSTALL

CONCRETE SIDEWALK ORPAD

1 IN 12 SLOPE DOWN TODEPRESSED CURB

SNOW STORAGELOCATION

EXISTING FIRE HYDRANT

EXISTING CATCH BASIN

EXISTING MANHOLE

PROPOSED SOFFITMOUNTED LIGHT FIXTURE

PROPOSED WALL MOUNTLIGHT FIXTURE

PROPOSED LIGHT POLE

FR

BF BARRIER-FREE PARKINGSTALL SIGN

FIRE ROUTE, NO PARKINGSIGN

NEW BUILDING

HYDRO POLE

PROPOSED BOLLARDLIGHT FIXTURE

B

DEPRESSED CURB

BORE HOLE LOCATION ANDNUMBER

FIRE ROUTE - CENTRELINEAND WIDTH

SERVICE ENTRANCE

SECONDARY BUILDINGENTRANCE

SECONDARY PRINCIPALENTRANCE

MAIN ENTRANCE /PRINCIPAL ENTRANCE

BENCH

DC

XFH

MUNICIPAL REVIEW SITE DATA

REGULATION REQUIREMENT ACTUAL

PROJECT NO. 1844 850 CHAMPLAIN STREET OTTAWA ONTARIO K1C 1K3

DESCRIPTION

OFFICIAL PLAN

ZONING BY-LAW

ZONING

LOT WIDTH

LOT AREA

FRONT YARD

EXTERIOR SIDE YARD(CORNER SIDE YARD)

REAR YARD

MC[2179]

MINIMUM HEIGHT 6.7m

NO MINIMUM

5 STOREY, 320 BED LONG TERM CARE FACILITY

MIXED USE CENTRE / TOWN CENTRE

2008-250

10 445 m2 (2.6 ACRES)

26.3 m

N/A

+/- 1.30 m

0.05 m (E) and 18.60 m (W)

90.1 m

MAX. FLOOR SPACE INDEX (FSI) NO MAXIMUM 1.01 (OZBL) or 1.68 (normal GFA)

NO MAXIMUM HEIGHT

INTERIOR SIDE YARD

0.05 m

PARKING NO MINIMUM REFER TO PARKINGCALCULATIONS ON THISDRAWING

DRIVING LANE WIDTH

PARKING AISLE WIDTH

PARKING SPACE MINIMUM 2.6 m x 5.2 m

MINIMUM 6.7 m

6.7 m

6.7 m

2.6 m x 5.2 m

LANDSCAPING 15% OF PARKING LOT(INCLUDING LANDSCAPED BUFFER & INTERIORLANDSCAPING)

27.3% (840 m2) OF PARKING LOT(INCLUDING LANDSCAPED BUFFER & INTERIORLANDSCAPING)

LANDSCAPED BUFFER AROUNDPARKING LOT

MINIMUM 6.7 m

MUNICIPAL REVIEW PARKING DATA

PERMITTED USES RESIDENTIAL CARE FACILITY

NO MINIMUM

NO MINIMUM

NO MINIMUM

NO MINIMUM

NO MINIMUM

ABUTTING STREET = 3 mNOT ABUTTING STREET = 1.5 m

MINIMUM NUMBER OF SPACES 2 SPACES 2 SPACES

MINIMUM LOADING DIMENSIONS

MINIMUM WIDTH OF DRIVEWAYACCESSING LOADING SPACE

REQUIRED SCREENING MINIMUM 2 m HIGH OPAQUESCREEN

MINIMUM 6.7 m

3.5 m x 9.0 m

6.7 m

3.5 m HIGH RETAINING WALLAND 1.8m FENCE

3.5 m x 5.2 m

MUNICIPAL REVIEW LOADING AREA DATA

LOCATION MINIMUM 9 m FROM LOT LINEABUTTING PUBLIC STREET

22.0 m

BUILDING FOOTPRINT AREA 3330.0 m2

OPEN SPACE AREA 7281.2 m2

REGULATION REQUIREMENT ACTUAL

ABUTTING STREET = 3 mNOT ABUTTING STREET = 1.5 m

REGULATION REQUIREMENT ACTUAL

GROSS FLOOR AREA(AS DEFINED BY OZBL)

10 600 m2

(AS DEFINED BY OZBL)

DISTANCE WILL CHANGE GIVENDESIGN-BUILD PREFAB MODULARCONSTRUCTION PROCESS

BUILDING HEIGHT(AS DEFINED BY OZBL)

SITE PLAN NOTES1. CONTRACTOR TO MAKE GOOD ALL EXISTING AREAS (INSIDE OR OUTSIDE THE

PROPERTY LINE) DISTURBED OR DAMAGED DURING PERIOD OF CONSTRUCTION,WHETHER SHOWN ON DRAWINGS OR NOT.

2. SITE PLANS ARE TO BE READ IN CONJUNCTION WITH DETAILS AND INFORMATIONSHOWN ELSEWHERE ON DRAWINGS. IN THE EVENT OF DISCREPANCIES THEMORE STRINGENT REQUIREMENT SHALL GOVERN.

3. ALL EXCAVATION SHALL BE UNDERTAKEN IN SUCH A MANNER AS TO PREVENTMOVEMENT WHICH WOULD CAUSE DAMAGE TO ADJACENT PROPERTIES,EXISTING STRUCTURES, UTILITIES, ROADS & SIDEWALS, ETC. AT ALL STAGES OFCONSTRUCTION. EXCAVATIONS THAT EXCEED 1.2 M (4 FT.) IN DEPTH SHALL BESHORED OR CUT BACK AT THE TOP SO THAT THE ANGLE OF THE CUT DOES NOTEXCEED 1:1 SLOPE. IF SHORING IS TO BE PROVIDED, SUBMIT DRAWINGS WITHDESIGN PARAMETERS CLEARLY STATED AND PREPARED BY P. ENG. (REGISTEREDIN ONTARIO) WITH SEAL AND SIGNATURE, FOE APPROVAL UNDER SEPARATEPERMIT APPLICATION.

4. DISTANCES SHOWN ON THIS PLAN ARE IN METERS AND CAN BE CONVERTED TOFEET BY DIVIDING BY 0.3048.

5. DO NOT DISTURB OR RENOVE ANY EXISTING VEGETATION (TREES, SHRUBS,GROUND COVER, ETC.) WITHOUT ARCHITECT'S WRITTEN APPROVAL.

PARKING REQUIRED FOR CITY OF OTTAWA

1. ZONING REQUIRES NO PARKING

2. BARRIER FREE PARKING FOR 76-100 TOTAL SPACES - 4 SPACES (2 TYPE A + 2 TYPE B)

3. BICYCLE PARKING = 10,600 m2 / 1500 m2 = 8 SPACES

4. PARKING PROVIDED 63 STANDARD SPACES 18 REDUCED WIDTH SPACES (22% of TOTAL PROVIDED) 4 BARRIER FREE SPACES TOTAL - 85 SPACES 8 BICYCLE PARKING SPACES

PARKING CALCULATIONPARKING REQUIREMENTS FROM ZONING BY-LAW 2008-250

LANDSCAPING SURROUNDING PARKING (within 3 m) REQUIRED FOR CITY OF OTTAWA

TOTAL LANDSCAPED AREA (WITHIN 3 m OF PARKING LOT) = 840 m2

TOTAL AREA (PARKING LOT + SURROUNDING 3 m) = 3,075 m2

LANDSCAPED AREA = 27.3% OF TOTAL AREA

LANDSCAPING CALCULATION

PLAN

NORTH

1:500

1 OVERALL SITE PLANA100

1:1

2 MUNICIPAL REVIEWA100

Survey information based on drawing ACAD-Aecon-asbuilt surface-20200114.dwg received from Ainley on January 14, 2020.

Planner & Landscape: FOTENN Planning + Design 223 McLeod Street Ottawa, ON, K2P 0Z8

Structural: Entuitive 200 University Avenue, 7th Floor Toronto, ON, M5H 3C6

Mechanical & Electrical: exp 499 King Street East, Suite 200 Hamilton, ON, L8N 1E1

Civil: Ainley Graham & Associates Limited 2724 Fenton Road Ottawa, ON, K1T 3T7

Geotechnical: Paterson Group 154 Colonnade Road South Ottawa, ON, K2E 7J5

Transportation: Parsons Transportation Group 1223 Michael Street, Suite 100 Ottawa, ON, K1J 7T2

Noise/Wind: Gradient Wind Engineering Inc. 127 Walgreen Road Ottawa, ON, K0A 1L0

Environmental Kilgour & Associates LTD 2285 St. Laurent Boulevard Ottawa, ON, K1G 4Z6

ISSUED FOR SPA 1ST SUBMIT 1 20/07/02 DL

Prints issued to

Particulars No. Date By

Particulars No. Date By

All previous issues of thisdrawing are superseded.Revisions to drawing

Project title

Project number Date issued Scale

DateDrawn by

Drawing no.Sheet title

K-W Studio

519.575.2227 1.877.789.6662

www.mmmc.on.ca

ARCHITECTSMMMCBrantford Studio

127 Brant Ave., Brantford,ON N3T 3H5

519.756.6331 1.877.789.6662

564 Weber St. N., Suite 1, Waterloo,ON N2L 5C6

5 STOREY, 320 BED LONG TERMCARE FACILITY

OTTAWA ONTARIO

1844

ENLARGED SITE PLAN A101

1:200

VP 2020-07-01

REVERA

6,700

6,75

0

9,000

3,50

0

1,650 1,500

R 6,000

R 6,000

R 8,818

R 6,000

R 9,000

R 15,000 R 15,000

R 9,000

PERMANENTBUILDING SIGNAGE

6.0 METRE FIREROUTE

1,070 mm H GUARD ALONG TOPOF RETAINING WALL - TOPBACK EDGE OF RETAININGWALL ON SUBJECT PROPERTY

EXTENT OF MAINENTRANCECANOPY

LINE OF BALCONYABOVE

BICYCLE PARKING(8 SPACES)

TYPICAL PARKINGSPACE

LANDSCAPEBUFFER

LANDSCAPEBUFFER

LANDSCAPEBUFFER

RETAINING WALL

6m SITE TRIANGLE

PAD MOUNTTRANSFORMER

GARBAGEENCLOSURE

RETAINING WALLTERMINATION TO BECONFIRMED AFTERGRADES UPDATED

RETAINING WALL TERMINATIONTO BE CONFIRMED AFTERGRADES UPDATED

RETAINING WALLTERMINATION TO BECONFIRMED AFTERGRADES UPDATED

GATEWAY SIGNAGEPENDING OWNER

AGREEMENT

ENHANCED LANDSCAPING FORLENGTH OF PARKING STALLS

1,070 mm H GUARD

1,070 mm H GUARD

1,070 mm H GUARD

TYPICAL PARKINGSPACE

TYPE BACCESSIBLEPARKINGSPACES

TYPE AACCESSIBLEPARKINGSPACES

TYPICAL PARKINGSPACE

1,070 mm H GUARD

THIS DIMENSION TO CHANGEGIVEN DESIGN-BUILD PREFAB

MODULAR CONSTRUCTIONPROCESS

GAP IN RETAINING WALL WITHGATE FOR SERVICE ACCESS TOCOURTYARD

GRADE TO SLOPE UP TOSTREET LEVEL TOWARDS

CORNER OF SITE

BENCH BENCH

FR

BF

FR

BFBF

BF

DC DC

LP

LP

LP

LP

LP

LP

WW

W

W

W W W W

W WWW

W

WWW

W

W

LP

DC

RAMP DOWNLOADING SPACE 1LOADING SPACE 2

9,8195,2006,7005,2006,0006,

700

1,650

4,00

0

2,600

5,20

06,

700

10,4

006,

700

3,00

03,

000

3,0002,000

3,40

01,

500

3,40

0

5,2001,800

5,20

06,

700

5,20

0

6,700

3,000

1,650

1,800

31,609 15,200 19,530 15,200 31,609

15,200 15,200

39,2

05

39,2

05

15,2

00

+/- 1,300 15,2

00

MAXIMUM BUILDING LENGTH = 114,513

MAX

IMU

M B

UIL

DIN

G W

IDTH

= 7

1,44

2

2,40

02,

400

2,40

02,

400

2,60

0

5,200

3,00

0

1,650

1,500

5,20

0

2,400 2,400 2,400 2,400

2,400 2,400 2,400 2,400

2,4002,4002,4002,400

2,40

01,

500

2,40

0

5,200

4,188

2,440 2,400

2,600

5,20

0

9,65

06,

000

2,95

0

18,6

00

31,660

8,20

0

1,500CHAMPLAIN STREET

JOHN

HO

LDEN

WAY

FAMILLE-CÔTÉ AVENUE

10

12

11

11

11

RESIDENT SECURECENTRE COURTYARD

8,200 sq ft

16 B

EDS

16 B

EDS

16 BEDS 16 BEDS

PROPOSED 5-STOREY320 BED

LTC BUILDING

FIRST FLOOR 61.4mBASEMENT 57.8m

9

11

RESIDENT SECUREWEST COURTYARDWITH 1.53m HIGH

FENCE

767 sq ft

LANDSCAPED OPENSPACE

3

3

4

BLOCK 42.56 ACRES

PLAN

NO

RTH

1:200

1 ENLARGED SITE PLANA101Axxx

Planner & Landscape: FOTENN Planning + Design 223 McLeod Street Ottawa, ON, K2P 0Z8

Structural: Entuitive 200 University Avenue, 7th Floor Toronto, ON, M5H 3C6

Mechanical & Electrical: exp 499 King Street East, Suite 200 Hamilton, ON, L8N 1E1

Civil: Ainley Graham & Associates Limited 2724 Fenton Road Ottawa, ON, K1T 3T7

Geotechnical: Paterson Group 154 Colonnade Road South Ottawa, ON, K2E 7J5

Transportation: Parsons Transportation Group 1223 Michael Street, Suite 100 Ottawa, ON, K1J 7T2

Noise/Wind: Gradient Wind Engineering Inc. 127 Walgreen Road Ottawa, ON, K0A 1L0