planning autonomous vehicles in the absence of speed lanes using lateral potentials

Post on 30-Jan-2016

21 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Planning Autonomous Vehicles in the Absence of Speed Lanes using Lateral Potentials. Rahul Kala, Kevin Warwick. - PowerPoint PPT Presentation

TRANSCRIPT

IV 2012, Spain rkala.99k.org5th June, 2012

Planning Autonomous Vehicles in the Absence of Speed Lanes using Lateral PotentialsRahul Kala, Kevin Warwick

Publication of paper: R. Kala, K. Warwick (2012) Planning autonomous vehicles in the absence of speed lanes using lateral potentials, Proceedings of the 2012 IEEE Intelligent Vehicles Symposium, Alcalá de Henares, Spain, pp. 597-602. 

IV-2012, Spain, 5th June, 2012 2

Is speed lane traffic best?

Requires a deep thought!

When bad?

• Diverse widths

• Diverse speeds

• Indian traffic!

Disadvantages applicable

here?• Intelligent

Vehicles• Is future

diverse?

• Motorists between lanes?

IV-2012, Spain, 5th June, 2012 3

Problems?

Beyond imaginations

Controls

Vision

LocalizationPlanning

Coordination

IV-2012, Spain, 5th June, 2012 4

What we do?

Height of madness!

Squeeze In Get aside Overtake

Brake Brake Brake

Oops Struck

IV-2012, Spain, 5th June, 2012 5

How we do?

Its ‘not’ like planning a mobile robot

Fuzzy Inference System

Genetic Algorithms

Graph-based solutions

Hierarchical Planning

Potential

IV-2012, Spain, 5th June, 2012 6

LATERAL POTENTIALS

Simple, Elegant, Fast

IV-2012, Spain, 5th June, 2012 7

Artificial Potential Fields

A Primer

Source: Tiwari R, Shukla A, Kala R. (2013) Intelligent Planning for Mobile Robotics: Algorithmic Approaches, IGI Global Publishers, doi: 10.4018/978-1-4666-2074-2.

IV-2012, Spain, 5th June, 2012 8

Planning

Longitudinal

Distance, Speed,

Acceleration measures

Lateral

Lateral Potentials

IV-2012, Spain, 5th June, 2012 9

The basics

and coordinate system of use

IV-2012, Spain, 5th June, 2012 10

Lateral Potentials

How would ‘you’ have done it?

IV-2012, Spain, 5th June, 2012 11

Considerations

• Decision 1: Clockwise or Anti-Clockwise?

• Decision 2: Magnitude?– Time to Collision (any?)– Distance Measure

IV-2012, Spain, 5th June, 2012 12

RESULTS

IV-2012, Spain, 5th June, 2012 13

Results - 1

IV-2012, Spain, 5th June, 2012 14

Results - 2

IV-2012, Spain, 5th June, 2012 15

Parameters

ParametersLateral Sensitivity

Longitudinal Sensitivity

Mixed Sensitivity

Cooperation

IV-2012, Spain, 5th June, 2012 16

Analysis -1

IV-2012, Spain, 5th June, 2012 17

Analysis - 2

IV-2012, Spain, 5th June, 2012 18

Analysis - 3

IV-2012, Spain, 5th June, 2012 19

Personal Advertisement

Obviously Recommended

IV-2012, Spain, 5th June, 2012 20

THANK YOU

Acknowledgements:

• Commonwealth Scholarship Commission in the United Kingdom

• British Council

top related