IM-EN-SDI21INST-PGRev. 2.00
PR-23-SDSDI2-23-SN2-XSSDI2-23-WP2-XS
SDI2-23-PL-SSSDR2-23
Pocket Guidefor Installation
Safe-Drive™ Generation 2.1
SAFETY REQUIREMENTS
1. Drill
2. Hole saw 1" and 2"
3. Angle grinder
4. Welding machine
5. Adjustable wrench
6. Thread seal tape
7. Allen keys 5 and 8 mm
8. Installation pocket guide
9. Product user manual
10. Drilling guide sticker
INSTALLATION EQUIPMENT
1. Retractor inner casing
2. Retractor outer casing
3. Combination wrenches 32 mm, 14 mm, 8 mm
4. Allen keys 8 mm, 5 mm
5. Torque wrench
5a. open end fitting 19 mm
5b. hex bit socket 8 mm
6. Screwdriver
6a. Phillips head
6b. Flat head
7. Pliers
8. Thread seal tape
9. Pocket guide for insertion and retraction
10. Laminated instruction cards
11. Best Practices document
SENSOR INSERTION EQUIPMENT
INSTALLATIONLOCATION(horizontal)
Installation on the outsideregion of the pipe.
0.6m (2ft)
0.6m (2ft)
0,6
m
(1ft 10
ins)
0,4
m
(1ft 3
ins)
0,5m(1ft 6ins)
0,5m(1ft 6ins)
FLOW
23SD-021
INSTALLATIONLOCATION(vertical)
INSTALLING AT HEIGHT
DISASSEMBLY
DRILLING(horizontal)
dia
50m
m
2 in
ch
dia
25m
m
1 in
ch
DN 50
2 ”
DN 150
6 ”
DN
80
-100
D
N200
8”
or
larg
er
Process pipe
Position drilling guidesticker
Drilling guidesticker
Remove
between holes
accordingly positionedto suit process pipe size
Drill1in/25mm hole
Drill 2in/50mm hole
90° indicated area
WELDING(horizontal)
Weld
Cutout
SAFE-DRIVE mounting flange
Process pipe
Material:SAF 2205
(EN 1.4462 PGTN S33205/S31803)
Welding groundpoint near toweld position
Important:Remove nozzle before welding.
DRILLING(vertical)
dia 50mm
2 inch
dia 25mm
1 inch
DN
50
2”
DN
15
0
6”
DN80
-10
0
DN20
0
8”
or
la
rger
Remove indicated area between holes
Position drilling guidesticker
Drilling guidesticker
90°
Process pipe
Drill 1in/25mm hole
Drill 2in/50mm hole
accordingly positionedto suit process pipe size
WELDING(vertical) WeldCutout
SAFE-DRIVEmounting flange
Welding groundpoint near toweld position
Process pipe
Material:SAF 2205
(EN 1.4462 PGTN S33205/S31803)
Important:Remove nozzle before welding.
WeldCutout Safe-Drive
mounting flange
Process pipeProcess pipe
Cutout Weld1
Cut and remove2
Continueweld
3
Material: AISI 316 L
WELDING PLATE(Brown stock washing fiber line installation)horizontal, with knife
WELDING PLATE(Brown stock washing fiber line installation)vertical, with knife Weld
Cutout
Safe-Drive mounting flange
Process pipe
Cutout
Weld1
Cut andremove
2
Continue weld3
ASSEMBLY (horizontal)
Tightening torque 17 Nm (13 lb/ft)
M10 Nyloc nut
Tightening torque 17 Nm (13 lb/ft)
ASSEMBLY(vertical)
M10Nyloc nut
STEAMLINEINSTAL-LATION
Flow
Air
Max hoselength 0.6m
Min 1/2”
Steam in9-13 bar andmax 180°C
Steam supply
See user manualfor correct pressure
Pressurereducer
Water & steamdrain
Strainer
Steamshut-off
Steam trap
valve
STEAMLINEINSULATION
HIGHPRESSUREWATERINSTAL-LATION
Flow
Air
Air
Manometer
Preconditioningto sewer
Solenoid connectionsto Indicating transmitter DTR
Hot blow-outwater
Max hoselength 0.6m
Shut-off ball valve 3/8”
Shut-off ball valve 3/8”
INSULATION
Required
Recommended
TRANS-MITTERMOUNTING
1 2 3
4 5 6
7 8 9
- 0 .
BACK
ENTER
Flow
connection
Power switch
Eye
mA outputcable
Power supply110-240 v
Sensor connection
Solenoid valve
level
www.vaisala.com