portfolio · 2020. 8. 6. · portfolio. title: fuel_systems created date: 5/11/2018 4:35:39 pm

Post on 02-Oct-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

www.aesmolds.com sales@aesmolds.com

Mold weight up to 5 Ton

Metal Insert Overmolded

Specialized Steel requirement

FAI (First Article Inspection) requirement

Molds with Spare component requirement

Product with Tight Tolerance requirements

Advanced Rheological Simulation requirements

Multi Cavity Tools with Hot Runner requirement

CPk (Statistical Dimensional Study) requirement

Product with High Volume Product requirement

Molds with 1 Million Shot warranty requirement

Specific Mold Engineering Know-how requirement

Looping for Dimensional Adjustments requirement

Internal pressure monitoring capability requirements

Scientific Injection Process Development requirement

FUEL SYSTEMSPORTFOLIO

top related