portfolio in power generati
Post on 03-Jun-2018
223 Views
Preview:
TRANSCRIPT
-
8/12/2019 Portfolio in Power Generati
1/34
ABB
UtilitiesGmbH
-1-
Allrightsreserved.
ABBsPortfolio inPower Generation
Peter Heuell
10th of July 2003
-
8/12/2019 Portfolio in Power Generati
2/34
ABB
UtilitiesGmbH
-2-
July20
03SeminarNeptunR
omania
ABB Portfolio for Power Generation
Business
Solutions
Process
Solutions
Operation&
Maintenance
ICEPackages
InstrumentationControl
Electrical Systems
Asset ManagementPlant Automation
Plant Management
Plant Optimization
Resource Scheduling
Turbine Automation
Combustion Management
Boiler Automation
Generator Automation
-
8/12/2019 Portfolio in Power Generati
3/34
ABB
UtilitiesGmbH
-3-
July20
03SeminarNeptunR
omania
Field Instruments,
Liquid &Gas Analyzer,Control Valves &Actuators
ICE Packages for Thermal and Hydro Power Plants
Control
Instrumentation
Electrical SystemsSystems forservice- and monitoring,management,
diagnosis- and documentation
(Data Acquisition, Close & OpenLoop Control, Diagnose- &Documentation, Protection)
MV/LV SwitchgearHV/MV/LV Transformers
UPS-SystemsIllumination SystemCommunication SystemsCablingSynchronization
LV/MV DrivesExcitation SystemsGenerator ProtectionGenerator breaker & bus ductEmergency Power Supply
-
8/12/2019 Portfolio in Power Generati
4/34
ABB
UtilitiesGmbH
-4-
July2003SeminarNeptunR
omania
Our Experts can execute all Project Phases
Expert Consulting
Site Assessments
Basic
Engineering
Detail
Engineering
Installation
Commissioning
Training
Project Management
Supply Management
-
8/12/2019 Portfolio in Power Generati
5/34
ABB
UtilitiesGmbH
-5-
July2003SeminarNeptunR
omania
Service Overview
ABB Service ensures
Cost-effective performance of yourplant
Extension of the plant life-cycle
Implementation of a modern uniform
system platform Spreading of the capital investment
through step-by-step replacement
Higher plant availability
-
8/12/2019 Portfolio in Power Generati
6/34
ABB
UtilitiesGmbH
-6-
July2003SeminarNeptunR
omania
Range of Electrical Products & Systems
LV/MV/HV TransformerLV/MV Switchgears, breakers
CableSynchronization
Generator protection
Generator breakerGenerator bus ductExcitation Systems
LV & MV Drive
-
8/12/2019 Portfolio in Power Generati
7/34
ABB
UtilitiesGmbH
-7-
July2003SeminarNeptunR
omania
Limits of supply of Plant Automation
Electrical Balance
of Plant
Standard approachin power generationindustry
-
8/12/2019 Portfolio in Power Generati
8/34
ABB
UtilitiesGmbH
-8-
July2003SeminarNeptunR
omania
Drives in Power Generation Starters, Pumps, Fans
Turbine
Condenser
Condensate pump
Heater pump
Cooling water pump
Raw water pump
1
23
4
Feeder pump
Primary fan
Secondary fan
Cooling towerfan
Variable Speed Drives in Power Generation
-
8/12/2019 Portfolio in Power Generati
9/34
ABB
UtilitiesGmbH
-9-
July2003SeminarNeptunR
omania
Portfolio of Drives
Softstarter
Water-cooled drives(1.8 MW 5 MW)
Air-cooled drives(315 kW 1.8 MW)
Air-cooled drives(1.5 kW 3 MW)
-
8/12/2019 Portfolio in Power Generati
10/34
ABB
UtilitiesGmbH
-10-
July2003SeminarNeptunR
omania
Solutions around the Generator
SYNCHRONOUS
GENERATORTURBINE
GOVERNOR
EXCITATION
TRANSFORMER
2
EXCITATION
SYSTEM
GENERATOR
BREAKER1
1
SYNCHRONIZING
2
PROTECTION
STATIC
STARTER
CONTROL
SYSTEMS
AC & DC
AUXILIARY
SYSTEMS
STEP UP
TRANSFORMER
HV- BREAKER
HV SYSTEM
CONTROL ROOM
PTs
&
CTs
AUX.
TRANSF.
STAR
POINT
CUBICLE
LV SWITCHGEAR
-
8/12/2019 Portfolio in Power Generati
11/34
ABB
UtilitiesGmbH
-11-
July2003SeminarNeptunR
omania
UNITROLExcitation Systems
UNITROLF AVRUNITROL
F SES
UNITROL5000 SES UNITROL5000 SES
UNITROL1000 AVR
-
8/12/2019 Portfolio in Power Generati
12/34
ABB
UtilitiesGmbH
-12-
July2
003SeminarNeptunR
omania
UNITROLProduct range
Comple
xityofPerfo
rmance
Generator Power/Excitation current
Excitation with
rotating machinesStatic Excitation Systems
UNITROL
5000
UNITROLF
UNITROL1000
15A 500 A >10000 AIfn
-
8/12/2019 Portfolio in Power Generati
13/34
ABB
UtilitiesGmbH
-13-
July2
003SeminarNeptunRomania
UNITROLProduct Range
UNITROL1000
Automatic Voltage Regulatorfor small indirect excited
generators up to 15 ADC Ifn.
Suitable for all machinesup to 50 MVA
Single or dual channel
Automatic synchronisationincluded (optional)
-
8/12/2019 Portfolio in Power Generati
14/34
ABBUtilitiesGmbH
-14-
July2
003SeminarNeptunRomania
Features:
PSS reduces oscillation of real powerbetween Generator and Network
PSS is part of an excitation system PSS is indispensable at:
Power plants having long transmission lines
Quickly changing Loads(e.g. Electro Steel Manufacturer, wind parks)
Value Proposition:
Highly improves stability of the generator and the network even inpower outages
Improved availability of the generator and consequently of the network
We face increasing demand due to the fact that utilities reducesgeneration capacity (closer to the edge)
UNITROL
Stand alone PSS
Type: IEEE Std. 421.5
Power System Stabilizer (PSS)
-
8/12/2019 Portfolio in Power Generati
15/34
ABBUtilitiesGmbH
-15-
July2
003SeminarNeptunRomania
Project Example HPP Trebinje in Montenegro
HPP Trebinje 1 Rehabilitation Main Offer: Control System
Main Offer: Mech. & Hydromechanical Equipment
Option: Excitation System
Consortium: ABB - Litostroj
Customer rewarded ControlSystem and Excitation System
Unitrol 5000 for 3 units
-
8/12/2019 Portfolio in Power Generati
16/34
ABBUtilitiesGmbH
-16-
July2
003SeminarNeptunRomania
SYNCHROTACT5 Product Portfolio
SYN
5302
Singlechannel
SYN
5201
SYN
5202
Doublechannel
Required
Availibility
Re
quired
Sa
fety
No redundancy RedundantManual synchronization
Redundant automaticSynchronization
+ SYN 5100
oder SYN 5200 SYN 5302
Therma
lPP(Ga
sturbin
e/Steam
turbine)
Nucle
arPP
1 GVA
2 GVA
Hydro
Pumpsto
ragePP
800 MVA
10 MVA
9 MVA
100 MVA
25 MVA
500 MVA
9 MVA
-
8/12/2019 Portfolio in Power Generati
17/34
ABBUtilitiesGmbH
-17-
July2
003SeminarNeptunRomania
Generator Protection REG 216 / REG 316
REG216 / REG316 mostadvanced Protection devices onthe market.
REG216 / REG316 for all types
of generators and transformers forall type of power station.
15 years of R&D
Hard and Software modules
Features:
Many (51) Configurations forProtection
Integrated measurement andcontrol functions
Integrated line recorder
Most advanced HMI
Simple System
2 1 6 N G 6 2
216NG62
Half Redundant System
System A System B
216NG62
2 1 6 N G 6 2
Full Redundant System
System A System B
2 1 6 N G 6 2
-
8/12/2019 Portfolio in Power Generati
18/34
ABBUtilitiesGmbH
-18-
July2
003SeminarNeptunRomania
Portfolio of Generator Protection
REG 216 GeneratorUnit TransformerAuxiliary Transformer
REG 216C GeneratorUnit - TransformerAuxiliary Transformer
> 10 25 100 200 300 600 800 1000 PG in (MVA)
REG 316 GeneratorRET 316 Transformer
Features
Generator Power
9 Analog Inputs4 Trigger Levels8 Binary Inputs
20 Binary Outputs(Alarms)
REG 316 / RET 316
In / Outputs 12 - 24 Analog Inputs8 - 16 Trigger Levels
16 - 32 Binary Inputs16 - 32 Binary Outputs
(Alarms )
REG 216 C
-> 48 Analog Inputs-> 32 Trigger Levels-> 64 Binary Inputs-> 64 Binary Outputs
(Alarms)
REG 216
Cascading of several devices
-
8/12/2019 Portfolio in Power Generati
19/34
ABBUtilitiesGmbH
-19-
July2
003SeminarNeptunRomania
Generator Protection REG 216 / REG 316
ARAD 1
BACAU 2 BORZESTI 7
BRAILA 2+3
BRAZI 6 CRAIOVA 1+2
DEVA 5
DROBETA 1-4 IASI 1+2
IERNUT 5+6
IRON GATE II 1+2
ISALNITA 8 ORADEA 3
PAROSENI 4
PITESTI 5
PROGRESU 4
ROVINARI 3-6
SUCEAVA 1+2
TURCENI 1-7
References in RomaniaReferences in Romania
-
8/12/2019 Portfolio in Power Generati
20/34
ABBUtilitiesGmbH
-20-
July2
003SeminarNeptun
Romania
Around the Turbine
Service
Consulting
Trainings-
Simulators
Model based,integrated
Unit Control
Condensate andExtraction Stop
Model based,predicative start-up
Optimization
BasicTurbine Control
ExtendedTurbine Control
Sensors, Actuators& Electro-Hydraulic
Solutions
Diagnosis &Supervision of
Turbines
HP and LPBypass
-
8/12/2019 Portfolio in Power Generati
21/34
ABBUtilitiesGmbH
-21-
July2
003SeminarNeptun
Romania
Steam and Gas Turbine Control
ProductsSolutions
Services
Turbotrol
Egatrol
We deliver all electrical and hydraulic control equipment needed forTurbogenerators either as integrated solutions or as single components
-
8/12/2019 Portfolio in Power Generati
22/34
AB
BUtilitiesGmbH
-22-
July2
003SeminarNeptun
Romania
Turbine Control Systems
Developed for new Turbines and Rehabilitation Steam / Gas turbine governor
(Over-)speed, frequency, temperature,
load control
Open loop control Fully automatic start-up and shut down HP/LP bypass control and protection
Protection
Three channel protection system
Turbine supervision Vibration Thermal stress calculator (Turbomax)
Operating data counter Hydraulic components
EHC, Actuators, Trip-block
Fast link to control network
-
8/12/2019 Portfolio in Power Generati
23/34
AB
BUtilitiesGmbH
-23-
July2
003SeminarNeptun
Romania
Turbine Control Systems Main Features
High end controller Unbeatable performance Provides sequential combustion
control Exceptional control precision Bumpless redundancy switchover
Easy operation Fully automatic control User friendly on-line diagnostics Online repair
Open system architecture High scalability and extensibility
Seamless integration in DCS Fully integrated safety system Large variety of monitoring and
optimization packages
-
8/12/2019 Portfolio in Power Generati
24/34
AB
BUtilitiesGmbH
-24-
July2
003SeminarNeptun
Romania
Reference Example: 6 x KA24-1 ICS
Customer
Independent power producer
American National Power (ANP)
operates the Combined CyclePower Plant in Midlothian (USA)as merchant power plant
ABB Solution
6 x EGATROL 8 6 x TURBOTROL 8
Other integrated control nodes(BOP, boiler, water/steam cycle)
Overall plant control, operationand information managementsystem
-
8/12/2019 Portfolio in Power Generati
25/34
AB
BUtilitiesGmbH
-25-
July2003SeminarNeptun
Romania
Thermal Power Plant Automation
BoilerPro-tection
BalanceofPlant
BurnerMana-gement
Fuel/AirSupply
Tempe-ratureControl
TurbineAuxilia-ries
Gene-rator
TurbinePro-tection
TurbineControl
Boiler automation Turbine automation
Unit automation
Unit operation and supervision
Mechanical interface to process or equipment
-
8/12/2019 Portfolio in Power Generati
26/34
AB
BUtilitiesGmbH
-26-
July2003SeminarNeptun
Romania
Application Advanced Control
Model based boiler / turbine co-ordination with MODAKOND
Set up in Rostock
pFDk f
+ -
+
+
+
Turbinen-Leistungs-regler
dynamischesModell
Dampferzeuger
Block-SW
FD-Druckregelung
Brennstoff-Regelung
dynamischeVorsteuerung
Dampferzeuger
dynamischesModell
KW
Stellungsregler
dynamische
Vorsteuerung
ABB-CONDSTOP
dynamischeVorsteuerung
Turbine
PElP
GZ
K Tt
Totzeit
Dynamisches Modell Kraftwerk
K
VZ1
T2 K
VZ1
T3K
VZ1
T1
-
8/12/2019 Portfolio in Power Generati
27/34
AB
BUtilitiesGmbH
-27-
July2003SeminarNeptun
Romania
Achieved results with MODAKOND/ABB-CONDSTOP(Rostock power plant, 550 MW)
setpoint fuelflow
load
setpoint generatorload
current boiler
load
simulated grid-frequency drop
utilized energy bythrottling
utilized energy byABB-CONDSTOP
restored energy forABB-CONDSTOP
restored energy forthrottling
The gain in efficiency through the use of ABB-CONDSTOP: is 0.4% , whichresults in a reduced fuel consumption of approx. 2,315 t coal per year
The gain in efficiency through the use of ABB-CONDSTOP: is 0.4% , whichresults in a reduced fuel consumption of approx. 2,315 t coal per year
-
8/12/2019 Portfolio in Power Generati
28/34
AB
BUtilitiesGmbH
-28-
July2003SeminarNeptun
Romania
Hydro Power Plant Automation
Overall Automation
Turbine 1
Turbine Protection
Turbine Control
Turbine Auxiliaries
Generator 1
Generator Protection
Generator Control
Generator Auxiliaries
Turb -GenGroup 1
CommonInstallations
Turbine n
Turbine Protection
Turbine Control
Turbine Auxiliaries
Generator n
Generator Protection
Generator Control
Generator Auxiliaries
Turb -GenGroup n
-
8/12/2019 Portfolio in Power Generati
29/34
AB
BUtilitiesGmbH
-29-
July2003SeminarNeptun
Romania
Multi Barrage Control
L L
Centralized controlOptimizationCoordinationForecast
Waterway controlHigh water controlSimulationInformation
-
8/12/2019 Portfolio in Power Generati
30/34
AB
BUtilitiesGmbH
-30-
July2003SeminarNeptun
Romania
Multi Target Co-ordination
Headwater/ flow controller
Water way/ cascade
Flow & level set-point
Grid controller
Electric grid
Load
Hydro Power Plant 1 Hydro Power Plant n
Load Frequency Flow Level
Hydro Co-ordination Center
-
8/12/2019 Portfolio in Power Generati
31/34
AB
BUtilitiesGmbH
-31-
July2003SeminarNeptun
Romania
Operator Station and Information Management
One operator for theprocess handling
Work place example with
Large screen(chart)
Three CRT One keyboard and
one mouse for all fourdisplays
Process handling onlywith mouse
Control room lay-out HKW Mannheim Nord (MK4)
-
8/12/2019 Portfolio in Power Generati
32/34
AB
BUtilitiesGmbH
-32-
July2003SeminarNeptun
Romania
Operator Station and Information Management
KW Schkopau (2x450 MW coal ): Large Screen
Double control room
Only large screenoperation
Pure mouse operation
One operator per unit
-
8/12/2019 Portfolio in Power Generati
33/34
AB
BUtilitiesGmbH
-33-
July
2003SeminarNeptun
Romania
Portfolio Highly Specialized Packages
-
8/12/2019 Portfolio in Power Generati
34/34
Your Partnerfor Economically and Ecologically
Efficient Power Generation
top related