PPP International Best Practice and Regional Application

Overview of Public Private Partnerships (PPPs)

23-25 April, 2008Tegucigalpa, Honduras

Filip DrapakWorld Bank Institute

Why PPP

• Large infrastructure gap in both developed as well as developing countries

• Risk management

• Project management skill

• Lack of public funding available for infrastructure

• Procurement efficiency

How is PPP defined?

• Long term contract

• Between Private and Public body

• Contract contains risks that are withhold by private sector

Roles of Partners

Successful project

Public partnerPrivate partner

Rules of the game set up by public sector:

- Legislation and regulation- Institutions- Procedures- Procurement

Project inputs set up by private partner:

- Design- Construction schedule and content- Maintenance schedule- Subcontractors

Types of PPP

1. Who is paying? 2. Who has a demand risk?

Concession type PFI type

• User pays principle• Demand risk with private partner

• Public body pays on behalf of users• Demand risk with public partner

Hybrid type

• Shared payments between Public and User• Demand risk with private partner, public partner or shared

Contractual types of PPPs

• M&O ?– long term operation and maintenance contract

• DB ?– Design Build• BBO ?– Buy Build Operate• BOT – Build Operate Transfer• BOO – Build Own Operate• BOOT – Build Own Operate Transfer• DBFO- Design Build Finance Operate• Concession

How to make it a success?

Project

Public partner

Private partner

Finance providersUsers

Meet objectives of all stakeholders

Public sector objective

• Output based delivery of infrastructure and service

• Value for Money• Procurement according to regulation• Risk transfer to Private partner

Private partner objective

• Profit• Lowest possible procurement risks• Reference• Long term use of own capacity• Risks transferred to subcontractors• Projects pipeline

Financier objective

• Save return of loan• Profit margin reflecting the risk• Risks not with borrower (transferred to

public sector or to subcontractors)

Users objective

• Low or no user fees• Transparency of tariffs and procurement• Quality of infrastructure and services

Is there a Best practise?

Rules of game

Capacity

Political will Market capability

Political will

• Demonstrated political will

• Ideally not dependent on election terms

• Political rationale

Rules of game

• Clear procedures of project management

• Public procurement legislation

• Policy and regulation

• Law and legislation optimisation

• Standardised contacts

• Clear tolls of avaluation

Market capacity

• Availability of Experienced sponsors

• Availability of reliable subcontractors

• Availability of long term finance at a given risk profile

• Availability of risk mitigating instrument

Capacity

• Capacity (public) on national level

• Capacity (public) on executive level

• Institutional capacity, memory and experience

• Capacity with private sector – Advisory– Project Sponsors– Financiers

What is different in PPP?

• Extra costs:– For preparation and procurement– Cost of capital – Expensive debt

• Benefits– Life time costing– Risk transfer– Innovation

Fiscal space

• The Extent to which fiscal decisions can be made by a public body– Fiscal space is a key driver for PPPs– Successful PPPs tend to enlarge fiscal space– Fiscal space can be jeopardised by “bad”

PPPs

Project Finance and PPP

• Financing infrastructure using Public Debt is in terms of financing most cheapest ways, however each new debt can affect overall rating and make all debts more expensive

• Project finance is most expensive way of financing projects, however its influence on overall rating and fiscal space can be limited

• To accept all risks and use Project finance is the worst solution for a Government

Project Finance - Risk Analyses

Force major risks

Risk mitigation and credit enhancement

Sovereign risks

On-project risks

Construction risk

• Key risk in PPP/PFI

• Difficult to measure

• Fully transferred to Subcontractors

• Some issues:– site conditions, potential delays, credit rating

and track record of Subcontractor, new or existing project, vulnerability of project, risks of currency and inflation, planning risks

Demand risk

• Key risk in projects that apply user fees

• Difficult to predict

• Difficult to mitigate

• Some issues:– Users willingness to pay, level of fees,

alternatives, who is responsible if there is not demand….

What can jeopardise PPP

– Tender is not competitive or transparent– Project risks are not well defined and

contractually transferred– Risks are to high and can’t be mitigated– Change in political will