Agile with Blueprint
1
ⓒ 2008 Blueprint Systems Inc. - Confidential & Proprietary
Requirements
• We start with a high level requirements / feature lists etc.
• Each sprint -> “just enough requirements detail”
• Initial “baseline” of requirements are done in sprint (s) prior to build sprint(s)
• We expect and plan for changes to these requirements during later sprints
• Last few sprints are “stabilization” sprints (bug fixes only)
Sprint1
requirem
ents
soft
ware
20% 5%
Sprint 2
requ
irem
ents
soft
ware
30%
10%
Sprint 3
requ
irem
ents
soft
ware
50%
15%
Sprint N
90%
75%
… Release Backlog
Sprint Plan Sprint Plan Sprint Plan Sprint Plan
How Blueprint sets up it’s project structure…
Product Backlog
• One Model File for the “product backlog”• Custom properties for (priorities, effort, release ……etc)• Use Filtering and Totals in Requirements Spreadsheet for both
Release and Sprint Planning
Detailed Requirements Models
• For each feature outlined in the Product Backlog we have a corresponding detailed requirements model
One Project Contains All Models
RELEASE Planning using a “Product Backlog” Model…
Feature & DescriptionPlanned Release
BacklogPriority
ReleasePriority
EffortEst.
Total Effort currently allocated to this
“RELEASE”
SPRINT Planning using a “Product Backlog” Model…
Feature description
Feature EffortHigh level tasks/goals
for this sprintWhich sprint
Total Effort currently allocated to this
“SPRINT”
Export from Blueprint to Scrumworks
During a Sprint
Iterative Evolution of Requirements during sprints…
Product Backlog Model
Auto Updated Test Cases
Simulation (Validate & Communicate)
Iterative Evolve Requirements
Custom Properties to
manage scope
A Requirements model for a Feature
Blueprint and Distributed Agile
• The challenges with Distributed Agile Teams….
– Distributed teams remove a key cornerstone of agile
• No longer Co-located teams
• Language, culture & distance issues
• Reduced communication efficiency and accuracy
– Studies show defect rate doubles, projects take longer
• Blueprint helping solve these challenges….
– Provides mechanism to gain back a significant portion of communication accuracy and efficiency
• Integrated Requirements
• Auto Gen (test cases, docs etc)
• Centralized & version controlled repository
– Supports iterative nature of Agile
• Elicit, Elaborate, Visualize, Accept
• Variable fidelity – “just enough spec details”
Supporting Iterative & Evolution of Requirements
• Blueprint supports Iterative and Evolutionary Requirements by…
– Version Control
– Variable & incremental fidelity of Requirements details / UI mockups / Use Cases
– Simulation to communicate (great for co-located or distributed/offshore teams)
– Simulation to validate (like a compiler for requirements)
– Typical Iterative, evolutionary process
• Start
– Start with Features list
– Create simple low-fidelity mockups
– Perhaps add a simple set of use cases
– Review via simulation - encourage discussion and creative ideas
• Continuous
– Continue with Elaboration of features, mockups and use cases and simulation review sessions until there is “enough” detail to start development.
– Continue to review requirements (Features, Mockups, Use Cases) – Review changes via simulations.