 WE THE GROUP MEMBERS:

MD. BULBUL AHMED 10.01.03.003

MD.SHARIFUL ISLAM 10.01.03.008

MD.YOUSUF BIN AZIZ 10.01.03.018ABU SAYED MD.TARIN 10.01.03.020

MD.FARHAN ABIR 10.01.03.026

MD.SABBIR KARIM 10.01.03.037

MD.YASIN(GROUP LEADER) 10.01.03.038

MD.EZAZ AHMED 10.01.03.041

S.M.RAHAT RAHMAN 10.01.03.044

MD.ABU RAIHAN 10.01.03.049

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 3/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 4/60

 Deep Foundation

Foundation:Foundation is the lowest and

supporting layer of a structure.

Geotechnical engineers design foundations basedon the load characteristics of the structure.

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 5/60

FOUNDATION

 DEEP FOUNDATION  SHALLOW

FOUNDATION

The most common forms of construction pertaining to deep

foundation are :

PILES PIERS CAISSONS

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 6/60

 Shallow Foundation

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 7/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 8/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 9/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 10/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 11/60

 Classification of Piles

Depending upon materials used in their manufacture, piles can be classified as :

a) Concrete Piles

i) Cast-In-Place or cast-in-situ Piles

ii) Pre-cast Piles

iii) Pre-stressed concrete Piles

 b) Steel Pilesc) Timber Piles

d) Composite Piles

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 12/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 13/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 14/60

 Definition & Explanation

PRE-CAST PILE: Pre means before & cast

means made. So precast pile refers to a pile that

has made before it is being used.

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 15/60

 PRECAST PILE

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 16/60

 Why andWhere it is used?

Pre cast pile is used for extra heavy weight

structure because it can ensure full strength by

 proper maintaining.

It can be used under water.

There is no possibility of the reinforcements

getting displaced.

There is no possibility of the voids being left.

 Not to attack by corrosive constituents in the

soil and the sub-soil water.

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 17/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 18/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 19/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 20/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 21/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 22/60

 Structure of Precast pile & Related

Information

  By the soil test, we would be find the depth of penetrate.

By which length of a pile can be determined.

After determine the total weight of the building, we would find

the number of piles.

The diameter of the pile normally varies from 35 cm to 65 cm

and their length varies from 20 ft to 30 ft.

Besides bearing load for easy transportation & movement big

weir or reinforcement is used in the pre cast pile.

For easy driven rectangular pile is often made.

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 23/60

  Longitudinal reinforcement usually consists of one bar 20 mm to

50mm in diameter at each angle of the section of the pile.

The vertical rods are tied horizontally by bars 6mm to 10mm indiameter.

The horizontal bars may be provided in the form of stirrups

wound around the verticals.

Pile shoe & pile stirrup is used in the lower part of the pile to

driven the pile easily.

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 24/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 25/60

 SOILCONDITION

 Soil suitability

  Suitable in a wide

range of soil conditions

Working loads in excess

of 1000kN

Useful for very deep

 piling upto 40 m In soft ground or in

aggressive or 

contaminated soils

 Bearing Capacity

  High bearing capacity

Concrete formations

around the contracted

sections increase the

capacity.

Compact soil &increase the bearing

capacity

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 26/60

 Process of Precast pile

  Steel form is used for the precast pile

manufacture.

Before pore the concrete in to the

form, Mobil or other kind of oil have

 been used. cement, sand ,aggregate ratio is

normally 1:2:4 in pre cast pile.

But to make the foundation stronger 

mix ratio is used 1:1.5:3

When the concrete pore in the steel

form it would be ramming by the

vibrator.

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 27/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 28/60

Curing & Driving

 After 3 days, pile have been covering by

the sheet.

After 3 days of casting, steel form would

 be removed. Then the piles would be prepare for 4

weeks curing.

Then the piles are transported to the site

for driving

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 29/60

 Picture of CuringPicture of Curing

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 30/60

 Picture of DrivingPicture of Driving

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 31/60

 Advantages of Precast Pile

  Cast well before work.

Well supervised

Reinforcement remain in their proper position Can be driven under water 

After driven they can be loaded soon

We can get required strength Detect the damage before use

Properly cured by water 

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 32/60

 Disadvantages of Precast Pile

  Difficult to manufacture

 Not economical

Subject to longitudinal and transverse cracking

 Not aesthetic

 Not appropriate for curved or flared structures

Complicated for skews

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 33/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 34/60

 Difference of Theoretical & Practical

Theoretical

  We can joint two pile

together 

Maximum length 40 ft

All of the test have todone before use

 Practical

We use one pile to

drive.

They use 50~55 ft pile

They only do some testin site

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 35/60

 Cast In Situ Pile

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 36/60

 WHAT IS CAST-IN-SITU PILES?

 Cast in situ piles are those piles which are

cast in position in side the ground.

Reinforcements are necessary to be provided

in a cast in situ Piles , when the pile acts as a

column and is subjected to a lateral force.

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 37/60

 WHAT IS CAST-IN-SITU PILES?

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 38/60

 PURPOSE OF CAST-IN-SITU PILE

 

Load Transmission Load Resistance

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 39/60

 TYPES OF CAST IN SITU PILES

 SIMPLEX PILE FRANKI PILE

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 40/60

 TYPES OF CAST IN SITU PILES

 VIBRO PILE  VIBRO EXPANDED PILE

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 41/60

 TYPES OF CAST IN SITU PILES

 RAYMOND PILE MAC ARTHUR PILE

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 42/60

 CONSTRUCTION PROCEDURE OF CAST IN SITU PILE

 LOOSANING OF SOIL

 I. Cutting and ScrapingBoring Grab

Cutting Teeth For Rotary Drilling

ii. Ripping

iii. Percussion

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 43/60

 REMOVAL OF SOIL

 Intermittent Transport Rope Grab

Rotary Drill

 CONTINUOUS TRANSPORT

  Flush Drilling

Continuous Auger

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 44/60

 TEMPORARY SUPPORT

 Drill Casing Vibrating

Oscillating

Rotating

 DRILLING MUD

Water  Bentonite

Polymer 

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 45/60

 ENLARGED BASE

  Under reaming

Grouting

Plug Expulsion

 CASTING Of Pile

ReinforcementConcrete

Mix

Casting of 

Concrete

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 46/60

 BORING PROCESS

 Choice of place and boring machine

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 47/60

 FIELD TANK AND REMOVAL OF OVERFLOWING

WATER 

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 48/60

 THE PROCESS OF CASTING

 Insertion of temporary casing with shoe

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 49/60

 THE PROCESS OF CASTING

 Placement of reinforcement

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 50/60

 THE PROCESS OF CASTING

 CASTING OF CONCRETE

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 51/60

 THE PROCESS OF CASTING

 CASTING OF CONCRETE

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 52/60

 THE PROCESS OF CASTING

 Removal of temporary tube and finish of casting

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 53/60

 COMPARISON BETWEEN THEORY AND PRACTICAL

FIELD

Theoretically Practical Field

  Pouring of Concrete

and Withdrawing of steel tube gradually

Polymer, Bentonite,

or Steel Case is used Auger or rotary drill

is used

  Steel tube is

withdrawn after 28days

Only Bentonite

solution is used Only Rotary drill is

used

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 54/60

 DIFFICULTIES OF PILEING AND HOW TO

OVERCOME THIS

PROBLEM SOLUTION

  Rocky layer of soil

with stone

Rising water from

the bottom of hole

Corrosion can beoccurred

  Abort drilling

Pump the water.

Best, use precast pile

Soil test is needed.

Corrosion resistantcement

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 55/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 56/60

  Cannot be used under water 

Displacement of reinforced

Dumping of concrete from a great height Inspection is not possible; voids may be left

Contact of water of concrete to the dry soil if uncased

Freshly laid concrete is susceptible to soil components

Driving of adjacent piles may rupture shell-less cast-in-

situ pile

 DISADVANTAGES OF CAST-IN-SITU PILES

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 57/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 58/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 59/60

8/3/2019 presentation on window

http://slidepdf.com/reader/full/presentation-on-window 60/60

top related