Presentation to
ITS GeorgiaMarch 25, 2010
Presented by
Jon Ringler & David Spinney, Serco Mark Battle & Mike Holt, World Fiber Technologies
GDOT ITS Maintenance
Introduction & Welcome to our Facility
Facility acquired in September 2009
Facility shared by World Fiber and Serco
All GDOT ITS Maintenance equipment and materials stored at facility
Warehouse = 38,500 SF
Conference room, break room and offices
World Fiber, Serco staff introductions
Keynote Speakers
Representative Jon Burns
– Residence: Newington, GA
– Occupation: Agribusiness
– Committees: Agriculture & Consumer Affairs Appropriations Game, Fish & Parks – Secretary Special Rules – Chairman Transportation
Representative Jay Roberts
– Residence: Ocilla, GA
– Occupation: Farmer
– Committees: Appropriations Transportation - Chairman
Contract Overview
Contract Overview
Contract Overview
Network Operations Center (NOC)
What the NOC does
– Responsibilities across all aspects of the NaviGAtor ITS Maintenance Project
Routine Maintenance Replacement (CMS, VDS/PDS, CCTV) Preventive Maintenance
– Monitoring of the NaviGAtor ITS Infrastructure
– Receive & perform Triage for incidents created within M3
– Dispatch Work Orders
– Asset Management
– Validation of all work performed to GDOT Operational Standards
– Coordination with GDOT ITS PM & Quality Assurance Team
NOC – Device Maintenance Work Flow
Serco
Serco
The Tools we use – System
Pay for
PerformanceSystems
Ethernet
Serial
Monitoring &
Maintenance Management ( M 3 ) System
CCTV
CMS
VDS
PDS
RDS
RMS
Hub
Native DeviceMgmt Software
WATTS , TACTICS, …
SolarWinds
Network Mgmt SW
Event Log ServerRead-only query of Log dbase
TSS Log ServerRead-only query of Log dbase
MaximoEnterprise
Asset MgmtSystem
Nagios
The Tools we use – Work Orders
The Tools we use – KPIs / Dashboards
Device Replacement
ITS Devices to be replaced:
– 41 CMS (LED, Walk-in, Full Matrix [5 color], Type B)
– CMS Structures (quantity dependent on inspection)
– 199 CCTV Systems, Type B (dome type): Camera Mounting arm/hardware Cabling from camera to cabinet Surge suppressors
– 585 Video Detection Systems VDS camera VDS cable VDS system processor
Device Replacement
Replacement schedule/strategy
– CMS Night work due to lane closure requirement All CMS replaced within one year
– CCTV All CCTV replaced within one year
– VDS/PDS All VDS/PDS replaced within one year
Device Maintenance
Minor repairs as needed
Preventive maintenance
– CCTV Clean/vacuum cabinet, replace filters Check cables/connectors Check thermostat/fan/heater/light Check incoming voltage Visual inspection Pest control Verify video and control
Device Maintenance
Preventive maintenance (continued)
– VDS/PDS/RDS Clean/vacuum cabinet, replace filters Check cables/connectors Check thermostat/fan/heater/light Check incoming voltage Visual inspection Pest control Verify video/data quality
Device Maintenance
Preventive maintenance (continued)
– Ramp Meters Clean/vacuum cabinet, replace filters Check cables/connectors Check thermostat/fan/heater/light Check incoming voltage Visual inspection Pest control Verify detector operation/quality Check alignment of signal heads and advance warning flashers Wash signs and signal heads, if needed
Device Maintenance
Preventive maintenance (continued)
– CMS Clean/vacuum cabinet, replace filters Check cables/connectors Check thermostat/fan/heater/light Check incoming voltage Visual inspection Pest control Replaced failed LED pixels Perform diagnostic tests
Device Maintenance
Preventive maintenance (continued)
– Hubs Site maintenance (pest control, vegetation, fence/gate/lock) Building exterior (weatherproofing, sweeping, sealant, paint) Building interior (vacuum, dust, mop, visual inspection) Building mechanical (HVAC, alarms, security camera) Power system (surge protection, disconnect, panel, cables) Communications (conduits, cables, terminators, labels) Electronics (equipment mounts, access points, dust)
Maintenance Equipment
Maintenance Equipment
Maintenance Equipment
Maintenance Equipment
Maintenance Equipment
Maintenance Equipment
Products selected for Replacement Phase
Changeable Message Signs
– Daktronics Full Matrix Monochrome Full Matrix Color
– LEDstar Full Matrix Monochrome
Closed Circuit Television (CCTV)
– Videolarm [Utilicom Supply Associates, LLC]
Video Detection System (VDS)
– Traficon [Control Technologies]
Contract Team Members
Vendor Display Booths
Close