2 |
“GOT ABOUT 100 REQUESTS FROM LOCAL AND INTERNATIONAL PUBLICATIONS ASKING TO CONNECT WITH OUR EXPERTS FOR INTERVIEWS ON THE EXTRAORDINARY PROJECTS WE TOOK. WE COULD NOT KEEP UP WITH THE REQUESTS!”
KLEOPATRA KYRIMI GROUP MARKETING & COMMUNICATIONS MANAGER
3 |
QUARTER 4
Click on the Press Clipping to Read the Complete Article
4 |
ENR MAGAZINE NAMES THE SGC-140 AMONG THE TOP PRODUCTS OF THE
YEAR
5 |
ENR MAGAZINE FEATURES SARENS IN THEIR SPECIAL SECTION TITLED
"INNOVATING LEADERS"
6 |
SARENS BRAND NEW CRANE, 450T LTM 1450-8.1 ALL TERRAIN CRANE
REACHES AUSTRALIA
7 |
SARENS LIFTS GIANT WIND TURBINE STRUCTURES FOR THE BEATRICE
OFFSHORE WIND FARM: PRESS CLIPPING 1
8 |
SARENS LIFTS GIANT WIND TURBINE STRUCTURES FOR THE BEATRICE
OFFSHORE WIND FARM: PRESS CLIPPING 2
9 |
SARENS HOISTS THE FIVE COMPONENTS OF THE ROTARY KILN AT
HEIDELBERGCEMENT AG IN SCHELKLINGEN, GERMANY: PRESS CLIPPING 1
10 |
SARENS HOISTS THE FIVE COMPONENTS OF THE ROTARY KILN AT
HEIDELBERGCEMENT AG IN SCHELKLINGEN, GERMANY: PRESS CLIPPING 2
11 |
SARENS DISMANTLES A TOWER CRANE AT VILNIUS TOWN HALL SQUARE IN
LITHUANIA
12 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 1
13 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 2
14 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 3
15 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 4
16 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 5
17 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 6
18 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 7
19 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 8
20 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 9
21 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 10
22 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 11
23 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 12
24 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 13
25 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 14
26 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 15
27 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 16
28 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 17
29 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 18
30 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 19
31 |
SARENS LAUNCHES THE BIGGEST CRANE OF ITS FLEET - THE SGC 140, IN A
GRAND LAUNCH EVENT AT GHENT, BELGIUM: PRESS CLIPPING 20
32 |
SARENS REPLACES RAIL BRIDGE IN TAMINES, BELGIUM
33 |
STIJN SARENS NOMINATED AS SECRETARY OF ESTA (EUROPEAN
ASSOCIATION OF ABNORMAL ROAD TRANSPORT AND MOBILE CRANES):
PRESS CLIPPING 1
34 |
STIJN SARENS NOMINATED AS SECRETARY OF ESTA (EUROPEAN
ASSOCIATION OF ABNORMAL ROAD TRANSPORT AND MOBILE CRANES):
PRESS CLIPPING 2
35 |
QUARTER 3
Click on the Press Clipping to Read the Complete Article
36 |
SARENS LIFTS LOOP REACTORS AT IOCL'S PARADIP REFINERY, INDIA
37 |
BRIDGE DESIGN AND ENGINEERING MAGAZINE COVERS SARENS PLACING
FOOTINGS OF THE CHAMPLAIN BRIDGE IN CANADA
38 |
SARENS FIRST 360° VIDEO OF THE CRANE INDUSTRY
39 |
SARENS ASSISTS S-OIL EXPANSION PROJECT IN ULSAN, SOUTH KOREA
40 |
SARENS BRINGS THE WIND TO HORNSDALE
41 |
NIEUWSBLAD PUBLISHES AN ARTICLE ON THE SARENS BOOM IN AUSTRALIA
42 |
SARENS LIFTS THE M-30 BRIDGE IN MADRID, SPAIN: PRESS CLIPPING 1
43 |
SARENS LIFTS THE M-30 BRIDGE IN MADRID, SPAIN: PRESS CLIPPING 2
44 |
SARENS LIFTS THE M-30 BRIDGE IN MADRID, SPAIN: PRESS CLIPPING 3
45 |
ENGINEERING NEWS-RECORD (ENR) FEATURES SARENS IN THEIR AUGUST
ISSUE
46 |
SARENS GREEN INITIATIVES COVERED BY INTERNATIONAL CRANES AND
SPECIALIZED TRANSPORT
47 |
SARENS MOVES SMULDERS JACKET FOUNDATIONS FOR BEATRICE WIND
FARM: PRESS CLIPPING 1
48 |
SARENS MOVES SMULDERS JACKET FOUNDATIONS FOR BEATRICE WIND
FARM: PRESS CLIPPING 2
49 |
SARENS MOVES SMULDERS JACKET FOUNDATIONS FOR BEATRICE WIND
FARM: PRESS CLIPPING 3
50 |
SARENS MOVES SMULDERS JACKET FOUNDATIONS FOR BEATRICE WIND
FARM: PRESS CLIPPING 4
51 |
SARENS TRANSPORTS VESSELS AT THE RUMAILA OIL FIELD IN IRAQ
52 |
SARENS PERFORMS INSTALLATION AT PTOLEMAIDA POWER STATION IN
GREECE: PRESS CLIPPING 1
53 |
SARENS PERFORMS INSTALLATION AT PTOLEMAIDA POWER STATION IN
GREECE: PRESS CLIPPING 2
54 |
CRANES TODAY FEATURES SARENS IN THEIR FEATURE TITLED, "WORKING
WITHIN TIGHT LIMIT"
55 |
SINOTRANS SARENS JV PERFORMS TRANSPORT AND LOAD-OUT FOR 55 LNG
MODULES: PRESS CLIPPING 1
56 |
SINOTRANS SARENS JV PERFORMS TRANSPORT AND LOAD-OUT FOR 55 LNG
MODULES: PRESS CLIPPING 2
57 |
SINOTRANS SARENS JV PERFORMS TRANSPORT AND LOAD-OUT FOR 55 LNG
MODULES: PRESS CLIPPING 3
58 |
SINOTRANS SARENS JV PERFORMS TRANSPORT AND LOAD-OUT FOR 55 LNG
MODULES: PRESS CLIPPING 4
59 |
ENGINEERING NEWS-RECORD (ENR), THE BIBLE OF CONSTRUCTION
INDUSTRY, FEATURES SARENS
60 |
SARENS SECOND VIDEO OF THE DOCUMENTARY SERIES #HOWWEDOIT ON
THE ASSEMBLY OF SARENS QUEEN CRANE - SGC120 FEATURED BY
HEAVYLIFT NEWS
61 |
SARENS FEATURED IN THE JULY ISSUE OF INTERNATIONAL CRANES AND
SPECIALIZED TRANSPORT MAGAZINE
62 |
HOLLANDS MOST POPULAR NEWS CHANNEL, AD NEWS FEATURES SARENS
63 |
SARENS TRANSPORTS LUXURY YACHT FROM PAPENDRECHT TO ROTTERDAM
64 |
SARENS IN ABC NEWS, THE NATIONAL NEWS CORPORATION OF AUSTRALIA
65 |
SARENS TRANSPORTS AND LIFTS OFFSHORE JACKET CLUSTER IN UK: PRESS
CLIPPING 1
66 |
SARENS TRANSPORTS AND LIFTS OFFSHORE JACKET CLUSTER IN UK: PRESS
CLIPPING 1
67 |
SARENS TRANSPORTS AND LIFTS OFFSHORE JACKET CLUSTER IN UK: PRESS
CLIPPING 1
68 |
SARENS TRANSPORTS AND LIFTS OFFSHORE JACKET CLUSTER IN UK: PRESS
CLIPPING 1
69 |
BELGIUM'S POPULAR NEWS DAILY - HET NIEUWSBLAD WRITES ABOUT
SARENS
70 |
SARENS PICTURE OF THE MONTH ANNIVERSARY VIDEO COVERED BY
HEAVYLIFT NEWS
72 |
SARENS DEPLOYS SGC120 TO OFFLOAD JACKET TOP PIECES AT THE
SMULDERS JACKET YARD IN WALLSEND (UK)
V
73 |
v
QUARTER 2
Click on the Press Clipping to Read the Complete Article
74 |
HENDRIK SARENS TO GIVE KEYNOTE ADDRESS AT THE WORLD CRANE AND
TRANSPORT SUMMIT (WCTS): PRESS CLIPPING 1
75 |
HENDRIK SARENS TO GIVE KEYNOTE ADDRESS AT THE WORLD CRANE AND
TRANSPORT SUMMIT (WCTS): PRESS CLIPPING 2
76 |
SARENS TRANSPORTS AND INSTALLS OIL RIG IN IRAQ: PRESS CLIPPING 1
77 |
SARENS TRANSPORTS AND INSTALLS OIL RIG IN IRAQ: PRESS CLIPPING 2
78 |
SARENS TRANSPORTS AND INSTALLS OIL RIG IN IRAQ: PRESS CLIPPING 3
79 |
SARENS TRANSPORTS AND INSTALLS OIL RIG IN IRAQ: PRESS CLIPPING 4
80 |
SARENS TRANSPORTS AND INSTALLS OIL RIG IN IRAQ: PRESS CLIPPING 5
81 |
INTERNATIONAL CRANES AND SPECIALIZED TRANSPORT MAGAZINE COVERS
SARENS IN THEIR JUNE ISSUE
http://www.sarens.com/media/1434018/ic_st_article_june_2017.pdf
82 |
SARENS PERFORMS 23.000T JACKET LOAD-OUT IN NORWAY
83 |
SARENS TRANSPORTS FIRST SECTIONS OF UTARK RAILWAY BRIDGE: PRESS
CLIPPING 1
84 |
SARENS TRANSPORTS FIRST SECTIONS OF UTARK RAILWAY BRIDGE: PRESS
CLIPPING 2
85 |
SARENS TRANSPORTS FIRST SECTIONS OF UTARK RAILWAY BRIDGE: PRESS
CLIPPING 3
86 |
SARENS RANKED #2 WORLDWIDE IN THE IC50 RANKING OF THE WORLD'S
LARGEST CRANE-OWNING COMPANIES FOR 2017
87 |
BRIDGE DESIGN AND ENGINEERING MAGAZINE COVERS SARENS
SUCCESSFULL COMPLETION OF THE NEW WEAR CROSSING PROJECT
88 |
SARENS - EXPERT OF SPECIAL TASKS, MANAGING DIRECTOR FOR POLAND,
MARIUSZ SUDOL INTERVIEWED
89 |
SARENS IN THE MAY/JUNE ISSUE OF HEAVY LIFT AND PROJECT
FORWARDING INTERNATIONAL MAGAZINE
90 |
SARENS MOVES THE 650T TBM FOR THE WARSAW METRO LINE
CONSTRUCTION: PRESS CLIPPING 1
91 |
SARENS MOVES THE 650T TBM FOR THE WARSAW METRO LINE
CONSTRUCTION: PRESS CLIPPING 1
92 |
HENDRIK SARENS TO GIVE KEYNOTE ADDRESS AT WORLD CRANE AND
TRANSPORT SUMMIT
93 |
THE OIL AND GAS YEAR REPUBLIC OF CONGO 2017 INTERVIEWS SARENS
REGIONAL DIRECTOR, NORTH AFRICA
94 |
SARENS SETS WORLD RECORD AT LUNEORT
95 |
HEAVY LIFT AND PROJECT FORWARDING INTERNATIONAL INTERVIEWS
SARENS TECHNICAL SOLUTIONS DIRECTOR AND SARENS SALES DIRECTOR
96 |
SARENS TRANSPORTS AND LIFTS 630T TANK MODULES FOR YAMAL LNG
PROJECT
97 |
SARENS INSTALLS STEEL BRIDGE OVER RHEIN-HERNE KANAL IN DUISBURG,
GERMANY: PRESS CLIPPING 1
98 |
SARENS INSTALLS STEEL BRIDGE OVER RHEIN-HERNE KANAL IN DUISBURG,
GERMANY: PRESS CLIPPING 2
99 |
PROFESSIONAL MEDIA GROUP INTERVIEWS SARENS GLOBAL FLEET
DIRECTOR
100 |
SARENS INTERVIEWED BY THE YOUTUBE STARTUP, BUILTWORLDS
101 |
TRANSPORT AND INSTALLATION OF THE KIELDRECHTSLUIS, ANTWERP
102 |
SARENS DOUCUMENTARY SERIES #HOWWEDOIT COVERED IN THE MEDIA:
PRESS CLIPPING 1
103 |
SARENS DOUCUMENTARY SERIES #HOWWEDOIT COVERED IN THE MEDIA:
PRESS CLIPPING 1
104 |
SARENS DOUCUMENTARY SERIES #HOWWEDOIT COVERED IN THE MEDIA:
PRESS CLIPPING 1
105 |
SARENS AWARDED AT THE ESTA AWARDS OF EXCELLENCE 2017: PRESS
CLIPPING 1
106 |
SARENS AWARDED AT THE ESTA AWARDS OF EXCELLENCE 2017: PRESS
CLIPPING 2
107 |
QUARTER 1
Click on the Press Clipping to Read the Complete Article
108 |
SPECIAL TRANSPORT MAGAZINE INTERVIEWS OUR BOARD OF DIRECTOR,
LUDO SARENS
109 |
SARENS GETS EXCLUSIVE COVERAGE FOR THE INSTALLATION WORKS AT
EXXONMOBIL'S (ESSO) ROTTERDAM REFINERY IN THE NETHERLANDS: PRESS
CLIPPING 1
110 |
SARENS GETS EXCLUSIVE COVERAGE FOR THE INSTALLATION WORKS AT
EXXONMOBIL'S (ESSO) ROTTERDAM REFINERY IN THE NETHERLANDS: PRESS
CLIPPING 1
111 |
SARENS GETS EXCLUSIVE COVERAGE FOR THE INSTALLATION WORKS AT
EXXONMOBIL'S (ESSO) ROTTERDAM REFINERY IN THE NETHERLANDS: PRESS
CLIPPING 1
112 |
GAZET VAN ANTWERPEN COVERS SARENS MOVING THE CONTAINER
CRANES FROM ANTWERP TO LAS PALMAS
113 |
SARENS TRANSPORTS HUGE MODULE IN HOBOKEN, BELGIUM
114 |
SARENS FEATURED AS PART OF THE ARTICLE ON THE OIL AND GAS
INDUSTRY IN THE JANUARY/FEBRUARY 2017 ISSUE OF HEAVYLIFT AND
PROJECT FORWARDING INTERNATIONAL MAGAZINE
115 |
SARENS ORDERS A PACKAGE OF 33 NEW DEMAG® ALL TERRAIN CRANES:
PRESS CLIPPING 1
116 |
SARENS ORDERS A PACKAGE OF 33 NEW DEMAG® ALL TERRAIN CRANES:
PRESS CLIPPING 2
117 |
SARENS ORDERS A PACKAGE OF 33 NEW DEMAG® ALL TERRAIN CRANES:
PRESS CLIPPING 3
118 |
SARENS ORDERS A PACKAGE OF 33 NEW DEMAG® ALL TERRAIN CRANES:
PRESS CLIPPING 4
119 |
SARENS ORDERS A PACKAGE OF 33 NEW DEMAG® ALL TERRAIN CRANES:
PRESS CLIPPING 5
120 |
SARENS ORDERS A PACKAGE OF 33 NEW DEMAG® ALL TERRAIN CRANES:
PRESS CLIPPING 6
121 |
SARENS ORDERS A PACKAGE OF 33 NEW DEMAG® ALL TERRAIN CRANES:
PRESS CLIPPING 7
122 |
SARENS ORDERS A PACKAGE OF 33 NEW DEMAG® ALL TERRAIN CRANES:
PRESS CLIPPING 8
123 |
SARENS ORDERS A PACKAGE OF 33 NEW DEMAG® ALL TERRAIN CRANES:
PRESS CLIPPING 9
124 |
SARENS ORDERS A PACKAGE OF 33 NEW DEMAG® ALL TERRAIN CRANES:
PRESS CLIPPING 10
125 |
SARENS RAISES THE PYLON FOR NEW WEAR CROSSING IN SUNDERLAND:
PRESS CLIPPING 1
126 |
SARENS RAISES THE PYLON FOR NEW WEAR CROSSING IN SUNDERLAND:
PRESS CLIPPING 2
127 |
SARENS RAISES THE PYLON FOR NEW WEAR CROSSING IN SUNDERLAND:
PRESS CLIPPING 3
128 |
SARENS RAISES THE PYLON FOR NEW WEAR CROSSING IN SUNDERLAND:
PRESS CLIPPING 4
129 |
SARENS RAISES THE PYLON FOR NEW WEAR CROSSING IN SUNDERLAND:
PRESS CLIPPING 5
130 |
SARENS RAISES THE PYLON FOR NEW WEAR CROSSING IN SUNDERLAND:
PRESS CLIPPING 6
131 |
SARENS RAISES THE PYLON FOR NEW WEAR CROSSING IN SUNDERLAND:
PRESS CLIPPING 7
132 |
SARENS RAISES THE PYLON FOR NEW WEAR CROSSING IN SUNDERLAND:
PRESS CLIPPING 8
133 |
SARENS RAISES THE PYLON FOR NEW WEAR CROSSING IN SUNDERLAND:
PRESS CLIPPING 9
134 |
SARENS COMPLETES TRANSPORT AND LIFT AT FORT HILLS OIL SANDS
PROJECT, CANADA: PRESS CLIPPING 1
135 |
SARENS COMPLETES TRANSPORT AND LIFT AT FORT HILLS OIL SANDS
PROJECT, CANADA: PRESS CLIPPING 2
136 |
SARENS COMPLETES TRANSPORT AND LIFT AT FORT HILLS OIL SANDS
PROJECT, CANADA: PRESS CLIPPING 3
137 |
SARENS COVERED IN THE JANUARY ISSUE OF INTERNATIONAL CRANES AND
SPECIALIZED TRANSPORT MAGAZINE
138 |
SARENS DEBUTS NEW JACKING SOLUTION FOR SCHIERSTEIN BRIDGE: PRESS
CLIPPING 1
139 |
SARENS DEBUTS NEW JACKING SOLUTION FOR SCHIERSTEIN BRIDGE: PRESS
CLIPPING 2
140 |
SARENS DEBUTS NEW JACKING SOLUTION FOR SCHIERSTEIN BRIDGE: PRESS
CLIPPING 3
141 |
SARENS DEBUTS NEW JACKING SOLUTION FOR SCHIERSTEIN BRIDGE: PRESS
CLIPPING 4
142 |
SARENS DEBUTS NEW JACKING SOLUTION FOR SCHIERSTEIN BRIDGE: PRESS
CLIPPING 5
143 |
ANNEX: DECEMBER 2016
Click on the Press Clipping to Read the Complete Article
144 |
SPOTLIGHT: SARENS BUILDWELL NIGERIA
145 |
SARENS ORGANIZES EDENVALE MARATHON 2017: PRESS CLIPPING 1
146 |
SARENS ORGANIZES EDENVALE MARATHON 2017: PRESS CLIPPING 2
147 |
SARENS FEATURED IN THE DECEMBER ISSUE OF INTERNATIONAL CRANES
AND SPECIALIZED TRANSPORT MAGAZINE
148 |
SARENS MOVES THE CENTREPIECE OF SUNDERLAND'S NEW BRIDGE: PRESS
CLIPPING 1
149 |
SARENS MOVES THE CENTREPIECE OF SUNDERLAND'S NEW BRIDGE: PRESS
CLIPPING 2
150 |
SARENS MOVES THE CENTREPIECE OF SUNDERLAND'S NEW BRIDGE: PRESS
CLIPPING 3
151 |
SARENS MOVES THE CENTREPIECE OF SUNDERLAND'S NEW BRIDGE: PRESS
CLIPPING 4
152 |
SARENS MOVES THE CENTREPIECE OF SUNDERLAND'S NEW BRIDGE: PRESS
CLIPPING 5
153 |
SARENS MOVES THE CENTREPIECE OF SUNDERLAND'S NEW BRIDGE: PRESS
CLIPPING 6
154 |
SARENS MOVES THE CENTREPIECE OF SUNDERLAND'S NEW BRIDGE: PRESS
CLIPPING 7
155 |
SARENS MOVES THE CENTREPIECE OF SUNDERLAND'S NEW BRIDGE: PRESS
CLIPPING 8
156 |
SARENS OPENS NEW CANADIAN HEAD OFFICE IN LEDUC
157 |
SARENS NASS JV IN RECORD LIFT AT KUWAIT REFINERY: PRESS CLIPPING 1
158 |
SARENS NASS JV IN RECORD LIFT AT KUWAIT REFINERY: PRESS CLIPPING 2
3
159 |
SARENS NASS JV IN RECORD LIFT AT KUWAIT REFINERY: PRESS CLIPPING 3
161 |
Sarens Bestuur nv
Autoweg 10
1861 Wolvertem - Belgium
T +32 (0) 52 319 319
F +32 (0) 52 319 329
info@sarens.com
www.sarens.com
top related