products catalogue 2010
Post on 10-Apr-2015
1.837 Views
Preview:
DESCRIPTION
TRANSCRIPT
LETTER OF THE CHAIRMAN
At ECISGROUP we believe in the continual improvement of our performance and in customer satisfaction.
Our vision is to become the market leader by providing Engineered Systems to the Oil&Gas upstream and downstream, Petrochemical and Power Generation Industries to enhance their performance, productivity and efficiency.
Our facilities in the Milan area, at the heart of Italy’s Industrial district, are equipped with the newest and most sophisticated devices for complete design, fabrication and in house testing.
Our staff are all well qualified, experienced and trained to perform at the best level, according to customers requirements and to all the international standards and codes.
We are committed to our Health, Safety, Environmental and Quality Systems, which are certified by International standards and applied effectively through all levels of our organization, thus ensuring a top level performance.
At ECISGROUP we take care to meet all our customers’ requirements, aiming at their complete satisfaction.
We consider customers as our strength and our employees as assets, hence obtaining an increasing level of performance and a renowned name.
Fortunato Branda
SOLUTIONS FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
SOLUTIONS FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
YOUR GOBAL PARTNER FOR OIL&GAS, POWER ANDPETROCHEMICAL SOLUTIONS
ECISGROUP, having almost half - of - a-century worldwide experience, is special-
ized in supplying “Turn Key Engineered Solutions” for Oil&Gas, Petrochemical and
Power plants.
Our highly qualified team can meet customers’ requirements in an excellent way
supplying you with Engineering Procurement and Construction in conformy with
the International Quality ISO 9001: 2000, Health and Safety standards as well as
with the Environment Protection requirements.
We also assist our clients with commissioning, training, start-up and after sales
services for all the equipments we supply.
ECISGROUP its is structured in three business units:
MULTIDISCIPLINARY ENGINEERING DIVISION
This division is specialized in engineering consulting services for instrumentation,
process control, automation and telecommunications. It provides hardware and
software for supervisory systems (SCADA), DCS and PLC systems, Emergency
Shut Down (ESD) systems, Burner Management Systems (BMS), Fire and Gas
(F&G) and Safety PLC (TÜV certified systems)
PROCUREMENT
Specialized services like: PROCUREMENT ENGINEERING, PICKING AND PACKING,
LOGISTIC.
The search for and procurement of materials is made both on the domestic and
international markets through a network of ISO certified suppliers.
CONSTRUCTION
Our excellence is to supply Turn Key systems such as: Analyzer Shelter, CEMS,
Sampling Point, Pneumatic Hydraulic -Wellhead Control Panel, Fuel Gas System
(ESD, Filtering Skid, Gas Heater Skid, Gas Reduction Skid, Dehydration, Gas Meter-
ing Skid, Gas Analysis), Chemical Injection Skid, Corrosion Inhibitor Package, N2
Production Skid, Membrane and PSA Early Production Facilities (Well Test Pro-
duction, I°and II° Test Separator, Oil Stabilizer, Slug Catcher).
Thanks to the flexible and interacting structure and to the continuous exchange
of information inside the company, we can handle projects from concept to com-
pletion with a total responsibility covering all the various phases of a project from
basic to detailed engineering, Turn Key supply, training and after sale services.
ECISGROUP is a 360° solution for the development of your Oil&Gas, Power and
Petrochemical projects.
We are where you are.
Yours Faithfully,
ECISGROUP S.p.A.Fortunato Branda
CEO
COMPANY PROFILE Since 1980 CHEMIT has developed customized solutions and specialized
services like Concurrent Engineering, Procurement Engineering, Picking
& Packing and Logistics & Customer Care. CHEMIT Business Unit supplies High
Quality products such as: Instrument Mechanical Bulk Materials, Electrical Bulk
Materials for hazardous areas, Instrument Valves for severe service, Piping Valves
& Flanges Saving Solutions.
Since 1990 ECIS has provided tailor-made engineered solutions from
early production up to installation, commissioning and start-up, after
sales services and maintenance.
Our excellence is supplying turn-key solutions such as: Analyzer Shelters,
Environmental Monitoring Systems (CEMS); Sampling systems; Pneumo - Electro-
Hydraulic Wellhead Control Panels; Fuel Gas Systems: Intel ESD - Initial Filters -
Metering - Reduction - Final Filters - Outlet ESD, Gas Fired Reboiler.
Chemicals Injection Skids: DI-Ethylene Glycol (DEG), TRI-Ethylene Glycol (TEG) Skid,
N Production Skids: Membrane & PSA, Early Production, I° and II° Test Separator,
Oil Stabilizer, Slug Catcher.
Since 1999 E&C has provided consulting services for Instrumentation,
Automation, Electrical and Telecommunication engineering.
Recently E&C has added the Process and Piping engineering thus becoming a
Multidisciplinary Engineering Business Unit. E&C supplies Hardware and software
for supervisory systems (SCADA), DCS and PLC Systems, Emergency Shut Down
(ESD) Systems Burner Management Systems (BMS), Fire and Gas (F&G) and
Safety PLC (TÜV certified systems).
In 2007, after several years of cooperation between CHEMIT, ECIS and
E&C and a commonly shared business experience at international level,
the Management decided to accept a new challenge for the developing market:
to incorporate the three companies in a new holding structure, under the name
ECISGROUP. The group combines the human resources and professional skills
of all three ISO UNI EN 9001:2000 certified Business Units. Our supply covers
a wide range of products and services for the Oil&Gas (Onshore and Offshore),
Petrochemical and Energy Markets ensuring maximum Customer satisfaction
and high technological standards.
In 2008, another goal was achieved: ECISGROUP has changed its legal
status into ECISGROUP S.p.A. - a private Company Limited by Shares.
As our group is a dynamic one, a new target has been set: internationalization,
focusing on the GCC countries, Mediterranean area and Eurasia. Our group’s
continuous development has led us into being the ideal Global Partner of
Engineering, Procurement and Construction for the Oil&Gas, Petrochemical and
Energy plants.
ELECTRICAL
25%
PROCESS
14%
MECHANICAL
13%
CIVIL
7%
INSTRUMENTATION
19%
AUTOMATION
17%
TELECOMMUNICATION
5%
MULTIDISCIPLINARY
ENGINEERING DIVISIONFor over 20 years, ECISGROUP Engineering Division has provided Customers with qualified engineering services and has powered the development of advanced technology solutions in Control & Safety Systems, Instrumentation, Process Simu-lation, Multivariable Control and Optimization Technologies for plant management.
Along with the group’s increasing needs, ECISGROUP Engineering Division with the implementation of Electrical, Process and Piping engineering depts., has grown to become a full Multidisciplinary Engineering Business Unit with over 125.000 Man-Hours/Year Multidisciplinary Engineering Staff
PROCESS ENGINEERING
ACTIVITIES DESCRIPTION:
• Feasibility study (i.e. process debottlenecking, yield improvement, energy savings, etc)• Development of Process Design Packages (PDP) and Front End Design Engineering• Process simulations • Development of Material and Energy Balances, Process Flow Sheets, P&ID’s• Process Equipment Sizing, Preparation of Equipment Data Sheets, Item Lists, Duty/Supply specifications • Process Control and Emergency Shut Down philosophies • Selection and Development of Advanced and Complex Controls, Multivariable Process Controls, process optimization applications • Auxiliary engineering systems, utilities, blowdown networks, flareS, off-sites• Plant Operating Manuals Development relative to Licensors’ Operating Guidelines • End User Field support (Operators’ Training, Troubleshooting)
TOOLS OF DEVELOPMENT FOR PROCESS ENGINEERING:
• Simulation: Hysys, PRO II• Heat Transfer Equipment sizing: TASC, HTRI• Specialized Calculation Spreadsheets for systems / equipment sizing
MECHANICAL & PIPING ENGINEERING
ACTIVITIES DESCRIPTION:
• General arrangement study• Equipment layout with plans and sections • P&I• Line list• General plot plans• Key plans• Layout in the plant area• Layout outside the plant area• Isometric drawings• Pipe and/or fittings of particular making, with material list• Stress analysis• Auxiliary piping support design, support list, material support list• Steam trap specifications and relevant material list• Nozzle orientation and elevation • Ladders and walkways construction design and relevant material list• General plan specification for equipment (compressor, pump, turbine, skip hoist, wagon, bridge etc.) • Equipment list
TOOLS OF DEVELOPMENT FOR MECHANICALAND PIPING ENGINEERING:
• Microstation• Autocad• Pds
CIVIL ENGINEERING
ACTIVITIES DESCRIPTION:
• Road plot plan and detailed design using Customer’s standard where necessary• Foundations (tunnel, sewerage etc.) plot plan and detailed design using Customer’s standard where necessary• General plot plan of foundation• Detailed plan foundation• One line diagram of building and metallic structure pipe racks, framework device, etc. • Offers of detailed drawing for average and light steel structures (ladders, walkways, platform, etc.) where not contemplated by Customer’s standard• Basic design for reinforced concrete work with static and dynamic stress• Construction drawing for reinforced concrete work• Approximate building project (plans, sections, front elevation etc..) with approximate metric computation for contracts• Executive design and construction plan of all reinforced concrete and other buildings• Executive design of reinforced concrete foundation plinth, single - line diagram of steel building and executive plan for civil work for completion of steel buildings• Executive plan of usual and special paving, antacid covering with technical specification• Executive design for heating and air conditioning plants, sanitary facilities, electrical installations, false ceiling etc for the complete realization of work• Material purchase note for civil work, not covered by Customer’s price list with possible specifications• Preliminary metric computation execution for contract purposes and final for each civil works of the plan covered by Customer’s price list• Preliminary and final material list with relevant estimation in compliance with Customer’s price list• Static control (not geometric) and possible calculation check of the documents developed by Vendors• General plot plan with indication of all the civil works• Document to be enclosed with documentation subset to competent Authorities authorization
TOOLS OF DEVELOPMENT FOR CIVIL ACTIVITIES:
• Autocad• Microstation• Sap 2000• Primus
INSTRUMENTATION &ANALYSIS ENGINEERING
INSTRUMENTATION:
• Project instrumentation general standards including plant packages • P&ID’s detailed itemization by means of ISA/ANSI standard symbols or Client standard• Instrumentation specification development based on process data • Material Requisition /Supply Specification/ Purchase Order preparation • Vendor Offer technical alignment; economical alignment and purchase if required• Instrumentation vendors follow up: documentation check/comment/approval, instrumentation test
INSTRUMENT FIELD INSTALLATION AND MOUNTING:
• Electrical/instrumentation interconnection signals table • Overall instrumentation electrical power supply engineering • Marshalling & Control cabinets design • Interconnection design, safety grounding design for control cabinets and instrumentation devices • Typical drawings for electrical installation, process installation, pneumatic installation• Field /control room electrical connection schemes • Single wire loop diagrams and Two–wire loop diagram• Cable and Multicore cable list. Cable coils schedule • Instrument and Junction Box positioning layout• Instrument air distribution layout
ANALYSIS ENGINEERING:
• Analyser House dimensional study drawings with analysers, power, interlock, HVAC cabinets, Material Requisition, Bid evaluation• Gas Chromatographs and process analysers specification and data sheet.• Primary and secondary sampling system with fast loops design and drawing for gas chromatograph and continuous analysers• Analyser vendors follow up, Factory Acceptance Test (FAT)
TOOLS OF DEVELOPMENT FOR INSTRUMENTATION &ANALYSIS ENGINEERING:
• InTools, Excel, Autocad, Microstation
TELECOMMUNICATIONS ENGINEERING
DESCRIPTION OF ACTIVITIES:
• Definition of the general requirements of the telecommunication systems; definition of basic design criteria• Estimate of quantities and costs of materials to be purchased and installed• Project programming and planning activity, review of the project time schedule, of materials supply and of identification of the critical items• Definition of the project vendor list• Definition of general inspection and testing criteria• Definition of the information required and development of technical specifications for telecommunication systems• Definition of the positioning of the main equipment (e.g. telephone exchanges, transmission equipment, PA/GA systems, etc.)• Definition of the main routes of the telecommunication cables• Preparation of documents for purchasing and inspection• Issue of material requisitions• Issue of the technical assessment of bids• Review of suppliers’ documentation• Preparation of installation drawings (“For Construction”)• Preparation of the necessary documents for contracting the erection works• Project activities close-out
TOOLS OF DEVELOPMENT FORTELECOMMUNICATION ENGINEERING:
• Autocad, Microstation• Calculation Spread-Sheets
ELECTRICAL ENGINEERING
DESCRIPTION OF ACTIVITIES:
• System analysis study and calculations for Load Flow, Short Circuit, Cable Sizing, Protection Coordination, Earthing and Lightning protection, Lighting system• General Electrical design Specification, Earthing and lightning specifications• Electrical general single line diagrams, protection and metering system diagrams• Single line diagrams for high voltage (HV) switchyards, and medium (MV) and low voltage (LV) Switchboard Single line diagrams for:• Logic and schematic control diagrams for switchyards and switchboards • Data sheets and Material requisitions (MR) for HV switchyards MV and LV switchboards, Motor Control Centers (MCC), auxiliary distribution boards, Emergency Diesel Generator Set, Uninterruptible Power Supply (UPS) systems• Switchyard and substation Layouts• Cable routing, power and distribution layouts• Lighting layouts and distribution• Cable sizing specification and MR• Earthing system layout and distribution• Specifications and MR for field power devices, lighting fixtures and distribution boards, earthing and bulk materials• Electrical Power, earthing and lighting installation details• Electrical equipment purchasing development, technical tabulations and evaluation• Electrical equipment vendor follow-up and Factory Acceptance Test (FAT)• Electrical erection specification, Site Acceptance Tests (SAT) specification and recording forms
TOOLS OF DEVELOPMENT FOR ELECTRICAL ENGINEERING:
• Electrical Systems calculation and sizing: ETAP• Specialised Calculation Spreadsheets• Autocad, Microstation
AUTOMATION &ADVANCED PROCESS CONTROL
DESCRIPTION OF ACTIVITIES:
• Development of General Design Specification for plant automation systems: DCS (conventional architecture, Profibus, Fieldbus), ESD/protection systems, process equipment monitoring systems (VMS, BMS), local control stations/ panels• Control and ESD systems technical evaluation and specification for bid enquiry• Technical evaluation and alignment Vendor quotations. Interfacing with Vendors• Automation Design activities: AESD protection systems for plant and equipment/machine - ESD narratives - Cause and Effect matrix development - ESD logic diagrams - ESD integration with protection and monitoring sub systems (e.g. VMS, BMS) - ESD systems functional safety and SIL evaluation A Control Systems - Plant regulatory controls functional specification and relevant requirements - “Control loop narratives” for complex control logic - Control system integration with sub-systems and package control systems A System Engineering - System I/O Database (ESD, DCS,etc). Loop diagram development - Database of serial/LAN connections between sub-systems & packages - Man–Machine interface (MMI) development, graphic pages, reports - Two Wire Loop Diagram• Advanced and Multi - Variable Model Based Predictive Control process control engineering• Real Time Optimization applications for plants, process units and sections.• Plant Information Systems engineering
TOOLS OF DEVELOPMENT FOR AUTOMATION ENGINEERING:
• Autocad, Microstation• Access• Calculation Spread-Sheets
CONTROL & SAFETYSYSTEM DIVISIONFor over 20 years, the CONTROL & SAFETY SYSTEM Division of ECISGROUPhas supplied Customers with qualified project management for systems, complete from design and development through to FAT, SAT and start-up, followed by training, documentation and after-sales support.The Control & Safety System Division of ECISGROUP is a business unit with capability to integrate, configure and commission safety and process control applications. With more than 130,000 I/O delivered and 75 systems covered by a maintenance program with 24hr call-out for emergency intervention, we develop:
- Project management- Safety applications - design & construction- Process control applications - design & construction- System migration & revamping- System integration- On call maintenance programs (24hr call-out)
Our experience is the guarantee of a successful project maximizing efficiency and reliability.
Process: DCS - PLC - SCADA - RTU - BOP - BMS - HVAC Safety: ESD - SIS - F&G - BPS - ICSS - HIPPS
OIL&GAS
35%
PETROCHEMICAL
33%
POWER
22%
PHARMACEUTICAL
6%
WATER TREATMENT
4%
M A I N B U S I N E S S A R E A S
PROJECT MANAGEMENT
TYPICAL ACTIVITIES:
- Project progress and cost control- Resource workload and activities plan definition- Coordination with procurement group for purchase of equipment and material- Coordination with customer for clear understanding of project requirements- FAT supervision
INVENSYS I/A 9.000EMERSON (DELTAV + OVATION) 6.000MOORE 3.000YOKOGAWA 3.000HONEYWELL 2.000ABB (AC800 + TENORE) 2.000L&N - ALSTOM 2.000 HIMA 9.000SIEMENS 8.000TRICONEX 7.000GE 7.000SCHNEIDER 5.000RTP 4.000A&B 2.000
F&G SYSTEMS (NOTIFIER/GM/ ...) 5.000
WIN CC 6.000WITZCON 5.000CITEC 5.000iFIX 4.000WONDERWARE/INTOUCH 3.000
OPC - IEC870 - F.BUS - P.BUS 4.000
Manhours/year
TOOLS OF DEVELOPMENT FOR PROJECT MANAGEMENT:
- Gantt chart- Network diagram- Calculation spread sheets
PROCESS CONTROL APPLICATIONSDESIGN & CONSTRUCTION
ECISGROUP has hundreds of man-years experience in the design and construction of control systems. Although specific specialization has been in projects for power stations and oil and gas processing plant, including refineries and oil well equipment, ECISGROUP has attained deep understanding of the software and hardware of all major manufacturers, giving the company the knowledge and versatility for any project in the automation field.
TYPICAL ACTIVITIES:
- System architecture and functional design specification development- System interconnection and cable list definition- Typical wiring, I/O assignment and loop wiring development- Power consumption and heat dissipation calculation- Hardware design, engineering drawing and construction A Power distribution panels A Interposing relay panels A System & marshalling cabinets- Software development and implementation A Engineering control specification review A Simple and complex control loops A Sequential logic- Man-machine interface, graphic and reports development- Alarm system and sequence of event implementation- Communication gateway development- Multivariable Control Systems and Real Time Optimization
- Third party systems integration into central control solution- Custom programming in Visual Basic, C, Excel and Access- Control network design and implementation- Operator manual and training documentation development- FAT, SAT, commissioning and start-up
TOOLS OF DEVELOPMENT FOR PROCESS CONTROL APPLICATIONS:
- AutoCAD/Access/Calculation spread - sheets
HMI SOFTWARE SUPPLIERS:
- Citect/Cimplicity/I - Fix/Win CC/Wonderware/Wizcon
COMMUNICATION PROTOCOLS FOR SYSTEM INTEGRATION:
- OPC/Foundation Fieldbus/Profibus/Modbus
SAFETY APPLICATIONS DESIGN& CONSTRUCTION
ECISGROUP has been a major supplier of SIL certified safety systems for the power industry and oil and gas industries for over 10 years. The company has qualified personnel in this discipline.The management took the decision to follow a program to certify the company for Functional Safety Management that has been verified by TÜV.
TYPICAL ACTIVITIES:
- HAZOP analysis, LOPA analysis- System safety analysis and calculations for SIL conformity- ESD (Emergency Shut Down), F&G (Fire and Gas), BPS (Boiler Protection Systems), ICSS (Integrated Control and Safety Systems), and HIPPS (High Integrity Pressure Protection Systems)- System architecture and functional design specification development.- Hardware design, engineering drawing and construction
A Typical wiring, I/O assignment and loop wiring development A Power distribution panels A Local control panels A Auxiliary consoles A System & marshalling cabinets A Power consumption and heat dissipation calculation- Software development and implementation A Engineering safety specification review A Safety logic implementation A First - out logic development A Cause & effect tables- Integration with DCS/ICSS- HIPPS systems- FAT, SAT, commissioning and start-up- System certification for SIL
TOOLS OF DEVELOPMENT FOR SAFETY APPLICATIONS:
- AutoCAD / Access / Calculation spread-sheets
SUPPLIER OF IEC 61511 & IEC 61508 CERTIFIED SYSTEMS:
NETWORK SYSTEM INTEGRATION
Universal standards such as OPC, Ethernet and Modbus have made system integration between products of different suppliers much easier than in the past. Now the customer can select the most suitable equipment for his ap-plication regardless of existing equipment to which it must be interfaced. Nevertheless, the integration should be performed by experts if the end result is to be practical and reliable.
Today’s plants require a common interface for DCS, ESD, F&G and SCADA systems that enable complex plant to be managed safely with a minimum number of operators, assisted with the right tools and expert programming to ensure that the information is filtered to give the priority to the most urgent tasks without omitting the details that enable the production to be optimize efficiently.
The choice of a competent system integrator with experience in multiple systems and disciplines is the customer’s guarantee that the work will be completed efficiently, in good time, and the finished system will be reliable in use for many years of successful operation without the loss of data or production time.
While having particular expertise in the Oil&Gas and Power sectors, ECISGROUP has experienced hardware, software and safety system engineers that are equipped to tackle the most diverse projects in any process industry.The ECISGROUP premises, on the outskirts of Milan, has an ample staging area for the combined IFAT (Integrated Factory Acceptance Test) with excellent facilities.
TYPICAL ACTIVITIES:
- Third party systems integration into central control solution- Custom programming in Visual Basic, C, Excel and Access- Control network design and implementation- Man - machine interface, graphic and reports development- Alarm system and sequence of event implementation
- Communication gateway development - Operator manual and training documentation development
TOOLS OF DEVELOPMENT FOR SYSTEM INTEGRATION:
- AutoCAD / Access / Calculation spread - sheets
COMMUNICATION PROTOCOLS FOR SYSTEM INTEGRATION:
- OPC- Fieldbus- Profibus
- Modbus- GSM for GE Mark VI- IEC 60870 - 5 - 104
SYSTEM MIGRATION & REVAMPING
Although the design of new plant continues to be an important sector of work, there is a growing market for the revamping of older plant.Many sites are still using control systems that are over 20 years old, and for which spare parts are becoming costly or unobtainable.These older systems are often unable to cope with the extra demands of modern management systems that requires detailed production data in real time, or the enhanced level of safety and reliability demanded by current standards. Revamping of existing systems requires extensive planning, based on acquired experience, to ensure that plant production is maintained during the changeover or that downtime is minimized by completing the site activities for the changeover during routine maintenance shutdowns.
TYPICAL ACTIVITIES:
- Reverse engineering - recovering all plant control data and logics from existing systems. This ensures that the new system will have identical characteristics and the plant will operate from day 1 without need for retuning control loops or adjusting processes setpoints, timings or alarm points etc. - Existing control process and safety system upgrade- System migration into new technological platforms- FAT, SAT, commissioning and start-up
MAINTENANCE SERVICES
ECISGROUP has, from the beginning, offered a complete after-sales service and assistance for systems delivered. The company also offers its services and experience for multiple platforms for service contracts for all automation equipment.
ECISGROUP runs a 24hour a day service, every day of the year for critical plant that requires round - the - clock support.Modern equipment is very reliable, and built in redundancy can guarantee plant operation even when there are multiple equipment failures. However, to maintain this level of availability, regular maintenance is required to check that redundant units are all working and that the any faulty units are replaced in good time, as well as ensuring that the systems are kept clean and protective systems are in good working order.Good maintenance can also prolong the working the working life of older equipment.
Manufacturers will promote the upgrade and replacement of obsolete systems and not without reason. New systems offer greater speed and reliability and more facilities for the operators. However, when the process equipment is also aging, the market for the end product is diminishing or the raw material becoming scarce, it is not economic to close down the plant for a revamping. Even older electronic equipment has been shown to be very serviceable and reliable when treated correctly, and well maintained.ECISGROUP is successfully maintaining systems that are over 20 years old and the reliability has dramatically improved with regular maintenance visits. At the end of the day, when the unit finally breaks down and there are no more spare parts available, the unit can be replaced promptly, with limited expenditure, with modern equipment that operates in parallel with the legacy equipment until the plant is decommissioned.
TYPICAL ACTIVITIES:
- On-call availability 24h/day & 365days/year.- Spare parts stock available in our headquarters.- Exchange repair solution contracts- Remote control diagnostic and on-call assistance.
TOOLS OF DEVELOPMENT FORON-CALL MAINTENANCE PROGRAM
- Development software for Citect, Emerson, Foxboro, GE, Fanuc, HIMA, Rockwell, RTP, Schneider, Siemens, Siemens - Moore, Triconex, Wizcon, Wonderware.
CONTROL & SAFETY SYSTEMDIVISION
References
REFERENCES: AUTOMATION DIVISION
CUSTOMER END USER PROJECT DESCRIPTION YEAR
IES MANTOVAREFINERY,ITALY
SUPPLY OF NEW DCS, ESD CERTIFIED TÜV SIL.3 IEC61508 (SRU3 - TGCU)
2009
2010
TURKEMBASHIREFINERY
TURKEMBASHIREFINERY,TURKMENISTAN
SUPPLY OF NEW DCS, ESD CERTIFIED TÜV SIL.3 IEC61508 (SRU3 - TGCU)
2009
2010
KT - MODERNIZATIONPROGRAM,MAZEIKIAI
7 COMPRESSOR CONTROL & MONITORING SYSTEMS
2007
2008
2009
ESSO BELGIE NV
AIRUP ACS/INSTRUMENTRELIABILITY UPGRADEPROJECT,BELGIUM
MARSHALLING CABINETS AND ESMS PB & LAMP PANELS
2007
2008
2009
SORGENIA
GISSI/SCANDALE/MODUGNOCOMBINED POWER PLANT,ITALY
SUPPLY, INSTALLATION ANDCOMMISSIONING OFN°6 ESD SYSTEM SIL.3 IEC 61508
2007
2008
2009
IES MANTOVAREFINERY,ITALY
DCS & BMS SYSTEMS FOR REFINERY POWER STATION
2007
2008
2009
FUSINA (VE)THERMOELECTRICPOWER PLANTITALY
SUPPLY, INSTALLATION ANDCOMMISSIONING OFN°2 ESD SYSTEM SIL.3 IEC 61508
2009
CIMIMONTUBI
EL KUREIMATHEGYPT, COMBINED POWER PLANT
SUPPLY, INSTALLATION COMMISSIONING &START - UP OF BOP PLC SYSTEM
2008
IES MANTOVAREFINERY,ITALY
BULLDOZING OPERATION:REVAMPING OF OBSOLETE CONTROL SYSTEM - SUPPLY OF NEW DCS, ESD CERTIFIED TUV SIL.3 IEC 61508 (WHITE AREA)
2008
TEVEROLA POWER PLANT,ITALY
DCS, ESD, SYSTEM SUPPLY - ENGINEERING,COMMISSIONING & START - UP
2007
2008
ENI E&P ENI E&P
OFF SHORE PLATFORMBARBARA C/G/H/T/T2,ITALY
REVAMPING AND SUPPLY OF SCADA SYSTEM 2007
CIMIMONTUBI
CEPC / CAIRO NORTHEGYPT, COMBINED POWER PLANT
SUPPLY, INSTALLATION COMMISSIONING &START - UP OF BOP PLC SYSTEM
2006
REFERENCES: AUTOMATION DIVISION
CUSTOMER END USER PROJECT DESCRIPTION YEAR
COMBINED CYCLE PLANTFERRARA
ESD SYSTEMS & DCS OVATION SW IMPLEMENTATION, COMBINED CYCLE PLANT, FERRARA
2006
LOMELLINA POWER PLANT,ITALY
INSTALLATION AND COMMISSIONING OF DCS SYSTEM 2006
CREMONA
POWER PLANTHEATING
INSTALLATION AND COMMISSIONINGOF DCS SYSTEM
2006
TERMINI IMERESE,COMBINED POWER PLANTITALY
SUPPLY, INSTALLATION ANDCOMMISSIONING OFN°1 ESD SYSTEM SIL.3 IEC 61508
2006
BAPCO BAHRAIN DESULPHURIZATION PLANT - ESD INTEGRATION 2006
LEGNANO
INCINERATOR,ITALY
MODIFICATION ON DCS SYSTEM YOKOGAWA 2005
AUGUSTA REFINERY, ITALY
PRESSURIZATED LOCAL PANELS 2005
GREENSTREAM B.V.
GAS & POWER
RECEIVING GASTERMINAL GELA,ITALY
DCS, ESD (TUV SIL.3 IEC 61508), FIRE & GASSYSTEMAND FIELD EQUIPMENT
2003
2004
2005
POWER PLANTSULCIS CAGLIARI, ITALY
SYSTEM SUPPLY ENGINEERING & COMMISSIONING 2004
CREMONA
POWER PLANTHEATING
MYCRO MOORE TECHNICAL ASSISTANCE 2004
TRECATE REFINERY, ITALY
PRESSURIZATED LOCAL PANELS 2004
SESTO S.G. POWER PLANTITALY
COMMISSIONING AND START - UPON ABB DCS CONFIGURATIONAND F.A.T.
2003
REFERENCES: AUTOMATION DIVISION
CUSTOMER END USER PROJECT DESCRIPTION YEAR
PIETRAFITTATHERMOELECTRICPOWER PLANT,ITALY
DCS, ESD, F&GAS SYSTEM SUPPLY - ENGINEERING,COMMISSIONING & START - UP
2002
2003
TERMINI IMERESE,COMBINEDPOWER PLANTITALY
SUPPLY, INSTALLATION ANDCOMMISSIONING OFN°1 ESD SYSTEM SIL.3 IEC 61508
2002
THERMOELECTRIC POWER PLANT -MANTOVA,BRINDISI, RAVENNA,FERRERA E.,ITALY
SUPPLY, INSTALLATION ANDCOMMISSIONING OFN°14 ESD SYSTEM SIL.3 IEC 61508
2002
OSTIGLIATHERMOELECTRICPOWER PLANT,ITALY
SUPPLY, INSTALLATION ANDCOMMISSIONING OFN°2 ESD SYSTEM SIL.3 IEC 61508
2002
TARANTO - STEP# 1 & 2,ITALY
CONFIGURATION, INTEGRATION, COMMISSIONING DCS + ESD CERTIFIED TUV SIL 3 IEC 61508
2002
ENI E&P
PLATFORM OFF SHOREDAVIDE 7,ITALY
SUPPLY, CONFIGURATION AND COMMISSIONING FORF&G + ESD INTEGRATED SYSTEM CERTIFIED SIL.3 IEC 61508
2002
PORTO CORSINI THERMO ELECTRIC POWER PLANT GR3, GR4 ,ITALY
SUPPLY, INSTALLATION ANDCOMMISSIONING OFN°2 ESD SYSTEM SIL.3 IEC 61508
2001
LA CASELLA THERMOELECTRIC POWER PLANT GR.1, GR.2, GR.3, GR4,
SUPPLY, CONFIGURATION ANDCOMMISSIONING OF N° 4 PLANTEMERGENCY SHUT DOWN(S.E.P. SYSTEMS) CERTIFIED TUV CL6
2001
CCT
INCINERATOR,ITALY
SUPPLY, CONFIGURATION INSTALLATION ANDCOMMISSIONING OF DCS/ESD/BMS
2000
2001
Sharjah Electricity and Water AuthorityComplex Al Layyah Area
LAYYAH POWERPLANT SHARJAH,UAE
BOILER PROTECTION AND BMS CERTIFIED TÜV 2000
CONDEAPACOL PEP DETAL AUGUSTA,ITALY
SUPPLY, INSTALLATION AND COMMISSIONING OF N°1 ESD SYSTEM SIL.3 IEC 61508
2000
CONDEAAGUSTA HEATRECOVER SYSTEM, ITALY
SUPPLY, INSTALLATION AND COMMISSIONING OF N°1 ESD SYSTEM SIL.3 IEC 61508
2000
REFERENCES: AUTOMATION DIVISION
CUSTOMER END USER PROJECT DESCRIPTION YEAR
ENI E&P
ORTONA, EMILIOPLATFORM,ITALY
SUPPLY, CONFIGURATION AND COMMISSIONING FORF&G + ESD INTEGRATED SYSTEM CERTIFIED SIL.3 IEC 61508
2000
RAVENNA / OFF-SHORE BARBARA T2,ITALY
SUPPLY, CONFIGURATION AND COMMISSIONING FOR F&G + ESD INTEGRATED SYSTEM CERTIFIED SIL.3 IEC 61508
2000
INTERMARE SARDARAVENNA, ANNALISA,OFF-SHORE,ITALY
SUPPLY, CONFIGURATION AND COMMISSIONINGFOR FIRE, AND GAS MONITORING SYSTEM
1999
ROSETTI MARINO INTERMARE SARDASASP OFF - SHORE
ENI E&P
CLARA COMPLEX PROJECT (OFF SHORE PLATFORMCALPURNIA, CLARA EST, CLARA NORD),ITALY
SUPPLY, INSTALLATION AND COMMISSIONING OFN° 3 ESD SYSTEM SIL. 3 IEC 61508 + RTUINTEGRATED
1999
ENGINEERINGDIVISION
References
REFERENCES: ENGINEERING DIVISION
CUSTOMER END USER PROJECT DESCRIPTION YEAR
ANSALDO ENERGIARIZZICONI POWER PLANTITALY
ELECTRICAL ENGINEERING 2007/2008
FOSTER WHEELER ITALIANA
AB MAZEIKIU NAFTA - OIL REFINERYLITHUANIA
FIELD INSTRUMENTATION AND AUTOMATIONENGINEERING ACTIVITIES AT REFINERY SITE AND HOME OFFICES
2007/2008
SAIPEM ENERGY SERVICES
EBOCHA OIL & GAS PLANTNIGERIA
SECONDMENT OF 1 PROCESS ENGINEER TO HELP INFEED ACTIVITIES FOR THE UPGRADING OF 1 OIL/GASSEPARATION AND GAS COMPRESSION STATION
2007/2008
SAIPEM ENERGY SERVICES
SAMBURGSKY NATURALGAS PLANTRUSSIA
DETAILED PROCESS SIMULATION AND FUNCTIONALREVIEW OF AN EXISTING OIL/GAS SEPAR + TREATMCENTRE, INSTRUMENTATION AND TELECOM SYSTEMSASSESMENT INCLUDING TECHNICAL VIABILITYASSESSMENT REPORT TO MGMT
2007/2008
TECNIMONTBOROUGE2 EXPANSIO PROJECT SAUDI ARABIA
COMPLETE PLANT ANALYSIS SYSTEM ENGINEERING 2007/2008
TECNIMONTAL WAHA PDH/PP PROJECT AL JUBAIL SAUDI ARABIA
DCS, ESD, F&G, TELECOM ENGINEERING.ASSISTANCE TO FAT
2007/2008
TECNIMONTAROMATICS PLANT KUWAIT
ANALYSER SYSTEMS F&G TELECOM SYSTEMSEVALUATION, VENDOR F.UP, FATINSTRUMENTATION ENGINEERING
2007/2008
TECNIMONTHDPE - NAOMESAIEED EPC - QATAR
INSTRUMENTATION DETAILED ENGINEERING 2007/2008
FOSTER WHEELER ITALIANA
EXXONMOBIL - ANTWERPBELGIUM
DETAILED UTOMATION SYSTEM ENGINEERINGACTIVITIES, REFINERY-WIDE ADVANCED CONTROLREVAMPING ACTVITIES C/O SITE
2005/2009
ABB ENERGY AUTOMATION
RIVA DEL GARDA POWER PLANT - ITALY
ELECTRICAL ENGINEERING 2008
ANSALDO ENERGIAAPRILIA POWER PLANTITALY
ELECTRICAL ENGINEERING 2008
ANSALDO ENERGIALIVADIA POWER PLANTGRECIA
ELECTRICAL ENGINEERING 2008
REFERENCES: ENGINEERING DIVISION
CUSTOMER END USER PROJECT DESCRIPTION YEAR
ANSALDO ENERGIATURANO LODIGIANO POWER PLANTITALY
ELECTRICAL ENGINEERING 2008
ANSALDO ENERGIASAN SEVERO POWER PLANTITALY
ELECTRICAL ENGINEERING 2008
ANSALDO ENERGIATHISVI POWER PLANTGRECIA
ELECTRICAL ENGINEERING 2008
ANSALDO ENERGIACONGO POWER PLANTCONGO
ELECTRICAL ENGINEERING 2008
ANSALDO ENERGIAVADO LIGURE POWERPLANTITALY
ELECTRICAL ENGINEERING 2008
FOSTER WHEELER ITALIANA
AZAWIYA REFINERY LIBYA
MULTIDISCIPLINE PROJECTMANAGEMENT CONSULT-ING FOR REFINERY WIDE RE-INSTRUMENTATION ANDCONTROL ROOM REVAMPING
2008
FOSTER WHEELER ITALIANA
EL PALITO VENEZUELA
INSTRUMENTATION ENGINEERING 2008
FOSTER WHEELER ITALIANA
ESSO BELGIE - AIRUPPROJECTBELGIUM
INSTRUMENTATION ENGINEERING, ELECTRICALENGINEERING
2008
FOSTER WHEELER ITALIANA
TURKMENBASHI DCU & SDAPROJECT (TDSP) TURKMENISTAN
VALVES AND INSTRUMENTATION ENGINEERING 2008
FOSTER WHEELER ITALIANA
RGD - PROJECT BAHREIN
INTOOLS ACTIVITY, INSTRUMENTATION ENGINEERINGAND CONTROL SYSTEM FAT FOR REFINERYREVAMPIMG AND EXPANSION
2008
SADELMIBAHIA LAS MINAS PANAMA
REPOWERING PROJECT PANAMA 2008
TECNIMONT TATNEFTTANECORUSSIA
ENGINEERING ON CONTROLSYSTEMS,INSTRUMENTATION & PROCESS ANALYSERSYSTEMS, HAZOP, SIL
2008
REFERENCES: ENGINEERING DIVISION
CUSTOMER END USER PROJECT DESCRIPTION YEAR
TECNIMONTLD5 STENUNGSUND SWEDEN
ENGINEERING SERVICES - TELECOM & PACKAGECONTROL SYSTEMS DESIGN
2008
ANSALDO ENERGIAMONCALIERI POWER PLANTITALY
ELECTRICAL ENGINEERING 2007
FOSTER WHEELER ITALIANA
MANTOVA REFINERY, ITALY
INSTRUMENTATION FIELD ENGINEERING & DRAFTINGACTIVITIES
2007
SAIPEM ENERGY SERVICES
AZUZUAMA OIL & GAS PLANTNIGERIA
SECONDMENT OF A 2 PROCESS ENGINEER’S TEAM TODEVELOP FEED ACTIVITIES FOR THE UPGRADING OF 2OIL/GAS SEPARATION AND GAS COMPRESSIONSTATIONS
2007
SAIPEM ENERGY SERVICES
EL GAMIL GASCOMPLEXEPGYT
BASIC DESIGN OF THE EXISTING GAS TREATMENTFACILITIES REVAMPING
2007
SAIPEM ENERGY SERVICES
BORDOLANOITALY
INSTRUMENTATION ENGINEERING 2007
TECNIMONTTASNEE HDPE/LDPEPROJECT AL JUBAIL SAUDI ARABIA
TELECOMMUNICATION SYSTEMS ENGINEERING 2007
TECNIMONTPP NIZHNEKAMSK RUSSIA
BASIC ENGINEEERING ISTRUMENTATION 2007
FOSTER WHEELER ITALIANA
SAHARA - BASELL QATAR
PROJECT MANAGEMENT CONSULTING ACTIVITEIS 2006
SNAMPROGETTI
KHURAISPLANT WATERINJECTION PUMPS AND UTILITIESSAUDI ARABIA
COMPLETE PLANT ANALYSIS SYSTEM ENGINEERING 2006
SNAMPROGETTIQURAYYAH (EBP), UAE
DETAILED AUTOMATION ENGINEERING 2006
SNAMPROGETTI SAMIRSAMIR UPGRADE PROJECTMAROCCO
DETAILED ENGINEERING ACTIVITIES 2006
REFERENCES: ENGINEERING DIVISION
CUSTOMER END USER PROJECT DESCRIPTION YEAR
SNAMPROGETTIESCRAVOS GAS TO LIQUID PLANT, NIGERIA
INSTRUMENTATION ENGINEERINGASSISTANCE TO FAT
2005
SNAMPROGETTIKHURSANIYA ,SAUDI ARABIA
AUTOMATION ENGINEERING 2005
SNAMPROGETTIRAS LAFFANTRAIN 5,QATAR
AUTOMATION ENGINEERING 2005
SNAMPROGETTI SUD CHINA AUTOMATION & INSTRUMENTATION ENGINEERING 2005
TECNIMONTSIMERI CRICHI POWER PLANTITALY
DETAILED INSTRUMENTATION AND AUTOMATIONENGINEERING ACTIVITIES
2005
ENEL TORINOCHIEVO (VR),ITALY
ELECTRICAL ENGINEERING FOR HYIDROELECTRICGROUPS AND ELECTRIC SUBSTATION
2004
FOSTER WHEELER ITALIANA
TEVEROLA POWER PLANT, ITALY
INSTRUMENT AND AUTOMATION ENGINEERING 2004
TECNIMONTPE4 SCHWECHAT PLANTAUSTRIA
COMPLETE PLANT ANALYSIS SYSTEM ENGINEERINGASSISTANCE TO FAT
2004
TECNIMONTTURBIGO PLANT, ITALY
INSTRUMENTATION ENGINEERING 2004
F. TOSI MECCANICA
SESTO S.G.THERMOELECTRIC POWER PLANT, ITALY
INSTRUMENTATION ENGINEERING DEVELOPMENT FORTURBINE
2003
SNAMPROGETTIACERRA POLIESTER PLANTITALY
F&G – DETAILED ENGINEERING DEVELOPMENT 2002
SNAMPROGETTIQATIF GOSP 1COMPLEX,SAUDI ARABIA
INSTRUMENTATION ENGINEERING 2002
REFERENCES: ENGINEERING DIVISION
CUSTOMER END USER PROJECT DESCRIPTION YEAR
SNAMPROGETTIMANTOVA POWER PLANTITALY
INSTRUMENTATION AND AUTOMATION PLANT DETAILSIDE ENGINEERING
2001
TECNIMONTCSPCPETROCHEMICAL PROJECT
NANHAI PETRO CHEMICALPROJECTCHINA
COMPLETE PLANTS ANALYSIS SYSTEM ENGINEERING 2000
FOSTER WHEELER ITALIANA
LOMELLINA ENEGIA
PARONA/PAVIA RESOURCERECOVERY PLANT, ITALY
INSTRUMENTATION AND AUTOMATION ENGINEERINGDEVELOPMENT: SPECIALISTIC AND PLANT DETAIL SIDE
1999
H I P P SHigh Integrity Pressure Protection Systems
HIGH INTEGRITY PRESSURE PROTECTION SYSTEMS
The installation of HIPPS systems is rapidly gaining acceptance over thetraditional pressure safety valves (PSV) or rupture discs as the preferred meth-od for the primary protection of plant against overpressure.
Major advantages of HIPPS are:
• no or less capital cost for relief system (PSV, piping, flare, land space, etc.)• reduced piping pressure ratings• compliance with environmental constraints against discharge to flare
These advantages are especially significant for the debottlenecking of an exist-ing plant, where the flare system has been already setup for the lower original production capacity.
The introduction of a HIPPS system is subject to international technical refer-ence standards, such as API codes and ASME, that do not allow indiscriminate use of HIPPS systems to replace safety valves, but require a fully documented assessment to justify the choice of the HIPPS system.
The choice of a HIPPS system, the design details and concepts, the con-struction and the startup are subject to precise requirements of congruence and continuity with the evaluation of the safety and reliability of the process
COMPANY CERTIFICATION OFFUNCTIONAL SAFETY MANAGEMENT
Company certification of Functional Safety Management has been assessed by TÜV Rheinland. The certification ensures:
• Functional safety is a company target
• Clear organisation and responsabilities for safety
• Safety Planning
• Methodologies for measuring performance and conformity to safety requirements
• Methodologies to treat non - conformities
• Assessment of competence for each role
(HAZOP and SIL) all components and the whole system are subject to require-ments of functional safety and integrity (normally with a SIL 3 rating).The assessment is carried out in accordance with IEC61508 and IEC61511 standards.The the process analysis may require a dynamic simulation of the HIPPS system behaviour.ECISGROUP is a global service provider of HIPPS systems with decades of expe-rience in the construction of high integrity safety automation systems (with over 100 SIL certified shutdown systems supplied) and the construction of packaged equipment for the process industry and for the wellheads.
QATALUM /
SNC LAVALIN INTERNATIONAL
Mesaieed Industrial City, Qatar
FUEL GAS SYSTEM composed of:
Liquid Separator Skid, Filtration & Metering
Skid, Condensate Tank Skid, Gas Heater
Skid, Pressure Reduction Skid, Control Panel
Shelter
INTERNATIONAL STANDARDSCONCERNING HIPPS
1) Standards defining HIPPS vs. pressure relief devices
API RP 520: Sizing, Selection and Installation of Pressure Relieving Devices
API RP 521: Pressure Relieving and Depressuring Systems ASME BPV: Code Div. VII section1,2 - Code Case 2211
EN -12186 Gas Supply Systems - Gas Pressure Regulating Stations
2) Standards ensuring HIPPS functional safety requirements
IEC 61511: Safety Instrumented Systems for the process industry sector
IEC 61508: Functional safety of Electrical - Electronic - Programmable Electronic Safety related systems
ANSI/ISA S84.01: Application of Safety Instrumented Systems for the Process Industries
3) Other applicable standars
API RP 14C ASME SEC VIII D1 ASME SEC VIII D2 ASME SECTION VIII ASME B31.3 ASME B31.4 ASME B31.8
OUR GLOBAL SOLUTION PROVIDERAPPROACH:
TARGETRELIABILITY
CUSTOM SELECTION OF COMPONENTS
Selection of each HIPPS component is performed to meet the realtarget reliability requirements:
• Custom Detailed Design: - Sensors - Solver & Logics - Actuators & Valves - Partial Stroking system if required - Dynamic Modeling
• Planning of Integration, Construction, Validation, Commissioning
• SIL certification by architecture and reliability analysis
• Custom cut global (or partial) Scope of Supply
APPLICATIONS:
OIL&GAS UPSTREAM Vessel Overpressure Protection
OIL&GAS DOWNSTREAMColumn Top Header Overload Avoidance
PETROCHEMICALPolymerization Reactor (CSTR) Temperature Runaway Prevention
HIPPS - DESIGN STEPS
- HIPPS vs. relief motivation/justification - Hazard analysis of overpressure scenarios and equipment / controls failures.
- HAZOP
- Develop feasible HIPPS configurations or HIPPS + relief combinations
- Functional and integrity requirements. Required speed of closure, LOPA, acceptable RISK, ALARP
- Quantified risk analysis for proposed protection system configuration to
establish probability of failure on demand.
- Selection of HIPPS options that meet the target reliability requirements
- DETAILED DESIGN Sensors, Solver, Actuators, Valves, Power Supply, actuation Air/Oil
systems, Bypass, Overall configuration
- Dynamic Modeling of transient
- Performance of other layers of protection (e.g. such as ESD)
- HIPPS valve re-opening procedure
- Valve Leakage - Restart/Bypass considerations Relief valve provision
- Performance standards. Safety Requirement Specification to define the basis and assumptions made for design, functional, performance and
testing requirements for the HIPPS
- Commissioning
- Certification of Architecture and reliability analysis
Lifecycle as per IEC 61511 standard
ANALYSISIMPLEM
ENTATION
V E R I F I C A T I O N
OPERATION
Safety Requirements Specifications for the SIS
Hazzard and Risk Assessment
Design andEngineering of Safety Instrumented System
Allocation of Safety Function to Protection Layers
Installation, Commissioningand Validation
Modification
Operation and Maintenance
Decommissioning
Design andDevelopment of Other
Means of Risk Reduction
PROCUREMENT DIVISIONThe Supply Chain develops solutions for the optimization of the project manage-ment cycle thanks to a skilled and highly qualified staff, whose activities include:
PRELIMINARY COST EVALUATION
• the pre-evaluation of the technical specification according to the mainly used European and American standards• the development of the Bills of Materials according to Bidding Vendors List• the issuance of preliminary RFQ’s or in-house estimate• the commercial evaluation of the received quotations
PROCUREMENT
It is important to point out first that the Procurement is carried out according to the company procedures and in accordance with the ISO 9001 standards, while for those jobs where the Procurement is done on the Customer’s behalf, procure-ment procedures dedicated to the specific job are agreed with the Customer and issued accordingly.• the preparation of Vendors List during the Bid Phase• the issuance of enquiries in accordance with internal procedures and technical requirements• the economical evaluation of received quotations, after the technical evaluation phase and Vendors shortlist• the negotiation with Vendors and issuance of recommendation• the issuance of purchase orders to the approved and selected Vendors• the sourcing and procurement of materials both on the domestic and international markets through a network of ISO certified suppliers
LOGISTICS & CUSTOMER CARE
• the expediting of orders to sub-suppliers• the handling of import-export procedures• the professional follow up of the whole order• the connection of our computer network to the Customers operating systems to be able to provide a real-time job progressing• the carrying out of expediting activities according to the Customers procedures and reports throughout the whole order development cycle
• the performance of quality checks and visual inspections on the goods received from the sub-suppliers under the supervision of our inspectors reporting to our Quality Control Manager• the storage of the goods in our warehouse and depots• the computerized inventory control• the material handling, sorting, palletizing & labelling• the co-ordination of the inspection activities with the Customers appointed Third Parties• the review of the Vendors certificates and preparation of all the Customers contractual documentation: certification dossiers, manufacturing data report books, operation & maintenance manuals• the transportation scheduling and daily shipment of goods to the final destination by all major international carriers
BULK MATERIAL FOR BOP
Instrument Mechanical Bulk Materials
- High Pressure Valves, Fittings and Tubing- Instrument Valves and Manifolds- Ball and Needle Valves- Double Block & Bleed Valves- Monoflange Valves
Electrical Bulk Materials for hazardous area
- Cable Glands and Electrical Fittings IEC/NEC- Junction Boxes IEC/NEC- Plugs and Sockets IEC/NEC- Control Stations IEC/NEC- Fluorescent and Floodlight Lighting IEC/NEC- Metal / Fiber Glass Cable Trays & Ladders- Trefoil Cable Cleats- Multi Cable Transit Systems
Piping Valves & Flanges Saving Solutions
High Performance Metal to Metal Valves & Flanges:- Dual Plate Check Valves- Twinsafe® Double Block & Bleed Ball Valves- Triple-offset Butterfly Valves- Double Isolate Triple-offset Butterfly Valves
Instrument Valves for severe service
- Choke and Control Valves- Subsea Ball, Needle, Gate, Check & Relief Valves- Triple-offset Control Butterfly Valves
PROCUREMENTDIVISION
References
REFERENCES: PROCUREMENT DIVISION
CUSTOMER VENDOR PLANT DESCRIPTION YEAR
SAIPEM VARIOUS
KHURAIS WATERINJECTION PROJECTSAUDI ARABIA
INSTRUMENT SUNSHADES 2009
SAIPEM COMERCIOMARITIMO SOCIEDADE LDA/ENGROCHEMICALPAKISTAN
VARIOUSENGRO PROJECTPAKISTAN
INSTRUMENT BULK MATERIALS 2009
TECHNIP ITALY/MOTOR OIL HELLAS
VARIOUSCORINTH REFINERYGREECE
SAMPLING SYSTEMS 2009
SNAMPROGETTI/ARAMCO KHURAIS GOSP
VARIOUSARAMCO KHURAISGOSPSAUDI ARABIA
INSTRUMENT SUNSHADES 2009
INTERMARE SARDA VARIOUSMAAMOURAPLATFORMTUNISIA
INSTRUMENT BULK MATERIALS 2008
SNAMPROGETTI SUD VARIOUSETILENE RAGUSA GELA,ITALY
CATALYTIC SENSOR FOR COMBUSTIBLE GAS,ROTAMETERS AND SAMPLING SYSTEMS 2008
APIANCONA REFINERYITALY
COMPRESSION FITTINGS ANDPREINSULATED TUBING 2008
TECNIMONT VARIOUSLLDP NIZHNEKAMSKRUSSIA
INSTRUMENT BULK MATERIALS 2008
TECNIMONTQ - CHEM IIQATAR
PREINSULATED TUBING AND SEAMLESS TUBING 2008
TECHIMP IMPIANTI VARIOUSOMV GAS GmbHAUSTRIA
INSTRUMENT ENCLOSURES 2008
SIIRTEC NIGI
KASHAGAN FIELDDEVELOPMENTPROJECTKAZAKHSTAN
PREINSULATED TUBING 2008
SAIPEM/ARAMCOKCC PROJECTSAUDI ARABIA
INSTRUMENT BULK MATERIALS 2008
REFERENCES: PROCUREMENT DIVISION
CUSTOMER VENDOR PLANT DESCRIPTION YEAR
YOKOGAWA ITALIASAMIR 2 PROJECTMOROCCO
MANIFOLDS AND KIDNEY FLANGES 2008
SNAMPROGETTIFANO/ENI R&M
VARIOUSSANNAZZAROREFINERYITALY
SAMPLING SYSTEMS 2008
FOSTER WHEELERITALIANA
VARIOUS
FCCUDEBOTTLENECKINGREACTOR - LIGHT END TRECATE REFINERY ITALY
FIELD INSTRUMENTS 2008
SLICOGE O&GNUOVO PIGNONE
HIGH PRESSURE VALVES, FITTINGS,COMPRESSION FITTINGS AND TUBING 2008
SAIPEM COMERCIOMARITIMO SOCIEDADE/ENGRO CHEMICALPAKISTAN
VARIOUSENGRO PROJECTPAKISTAN
INSTRUMENT BULK MATERIALS 2008
SIIRTEC NIGI VARIOUSMANTOVA REFINERYITALY
MANIFOLDS, VALVES, POTS 2008
TECNIMONT VARIOUSHDPEMUNCHSMUNSTERGERMANY
NYLON TUBING 2008
ENI IRAN VARIOUS
DARQUAIN OIL FIELD2ND STAGEDEVELOPMENTPROJECTIRAN
PIPING BULK MATERIALS 2008
ENI IRAN VARIOUS
DARQUAIN OIL FIELD2ND STAGEDEVELOPMENTPROJECTIRAN
GASKETS AND FLANGES 2007
SAIPEM VARIOUSKHURAIS CRUDECONTRACTSAUDI ARABIA
INSTRUMENT BULK MATERIALS 2007
SNAMPROGETTI/SAUDI ARABIANOIL COMPANY
VARIOUS
KHURAIS WATERINJECTIONFACILITIES ANDUTILITIESSAUDI ARABIA
TUBING AND PIPE 2007
FOSTER WHEELERITALIANA
VARIOUS
REFINERY GASDESULPHURIZATIONPROJECTBAHRAIN
SOLENOID VALVE CABINET 2007
REFERENCES: PROCUREMENT DIVISION
CUSTOMER VENDOR PLANT DESCRIPTION YEAR
SNAMPROGETTI VARIOUS
GAS TREAT &COMPRESSIONFACILITIES (GTC)HAWIYAHSAUDI ARABIA
INSTRUMENT BULK MATERIAL 2007
SNAMPROGETTICANADA/SNC LAVALIN
VARIOUS
SECONDARYUPGRADINGALBERTACANADA
VALVES AND MANIFOLDS 2007
SNAMPROGETTI VARIOUSKHURSANIYAHPROJECTSAUDI ARABIA
INSTRUMENT BULK MATERIALS 2007
ERG NUOVECENTRALI
VARIOUSNUOVE CENTRALIITALY
INSTRUMENT BULK MATERIALS 2007
TECNIMONT VARIOUSLDPE NIZHNEKAMSK EPCMRUSSIA
INSTRUMENT BULK MATERIALS 2007
SNAMPROGETTI VARIOUSQATOFIN LDPEPROJECTQATAR
VALVES AND FILTERS 2007
SAIPEM/SAUDI ARAMCO
VARIOUS
KHURAIS WATERINJECTIONFACILITIES ANDUTILITIESSAUDI ARABIA
INSTRUMENT BULK MATERIALS 2007
SNAMPROGETTI VARIOUSQURAYYAHSAUDI ARABIA
INSTRUMENT BULK MATERIALS 2007
SNAMPROGETTI VARIOUS
KHURSANIYAPRODUCTIONFACILITIESSAUDI ARABIA
SEAMLESS TUBING 2007
FWI/THE KUWAITOLEFINS COMPANY
VARIOUS
TKOC OL2K EG2PROJECTSHUAIBAKUWAIT
INSTRUMENT BULK MATERIALS 2007
SNAMPROGETTI VARIOUSQATOFIN LDPEPROJECTQATAR
INSTRUMENT BULK MATERIALS 2007
SNAMPROGETTI VARIOUSGASCO PRJ 5229 RUWAISU.A.E.
INSTRUMENT BULK MATERIALS 2007
REFERENCES: PROCUREMENT DIVISION
CUSTOMER VENDOR PLANT DESCRIPTION YEAR
TECNIMONT VARIOUSHDPE RABIGHSAUDI ARABIA
ELECTRICAL BULK MATERIALS 2007
FWI/THE KUWAITOLEFINS COMPANY
VARIOUS
TKOC OL2K EG2PROJECTSHUAIBAKUWAIT
ELECTRICAL BULK MATERIALS 2007
SNAMPROGETTI VARIOUSQURAYYAH SEAWATER PLANTSAUDI ARABIA
INSTRUMENT BULK MATERIALS 2007
TECNIMONT VARIOUSNIZHNEKAMSKRUSSIA
INSTRUMENT BULK MATERIALS 2007
TECNIMONT VARIOUSHD/LDPE AL JUBAILEPC TASNEESAUDI ARABIA
STAINLESS STEEL FABRICATED COMPONENTS 2007
GE O&G NUOVOPIGNONE
VARIOUS
KASHAGAN FIELDDEVELOPMENTPROJECTKAZAKHSTAN
SAMPLE POINTS 2007
INTERMARE SARDA
MAERSK HALFDANPHASE 3DEVELOPMENTPROJECTDENMARK
INSTRUMENT BULK MATERIALS 2006
NUOVO PIGNONE
KASHAGAN FIELDDEVELOPMENTPROJECTKAZAKHSTAN
INSTRUMENT PROTECTION BOXES &WINTERIZING ENCLOSURES 2006
SIIRTEC NIGI
VARIOUS
FACILITIES UPGRADE & RELOCATION OF U/G PROCESSPIPING FOR CGSKUWAIT
INSTRUMENT BULK MATERIALS 2006
SNAMPROGETTI
VARIOUS
KHURSANIYAHPROJECTSAUDI ARABIA
INSTRUMENT & ELECTRICAL BULK MATERIALS & DUAL PLATE CHECK VALVES 2006
TECNIMONT VARIOUSEPPE / LLDPERABIGH PROJECTSAUDI ARABIA
TUBING 2006
API RAFFINERIA
VARIOUS
REVAMPINGBITUMEN PLANTSITALY
STEAM TRACING TUBING BUNDLES ANDCOMPRESSION FITTINGS 2005
REFERENCES: PROCUREMENT DIVISION
CUSTOMER VENDOR PLANT DESCRIPTION YEAR
METHANOLCASALE
VARIOUS
TOGLIATTIAZOTM-M METHANOLPLANTRUSSIA
INSTRUMENT BULK MATERIALS 2005
SIIRTEC NIGI
VARIOUS
KASHAGAN FIELDDEV. PROJ.DEHYDRATIONPLANTKAZAKHSTAN
PRE-INSULATED TUBING, JUNCTION BOXES,LUMINAIRES 2005
SNAMPROGETTI
VARIOUS
ADCO BU HASAFACILITY DEV.PROJECTU.A.E.
INSTRUMENT AND ELECTRICAL BULK MATERIALS 2005
UNIVERSITA’ DISALERNOITALY
VARIOUSUNIVERSITA’ DISALERNOITALY
CO2 SUPERCRITICAL EXTRACTION PILOT PLANT 2005
BELAYIMPETROLEUMCOMPANY
VARIOUS
TEMSAH T-4PROJECTEGYPT
INSTRUMENT BULK MATERIALS ANDLOOSE INSTRUMENTS 2004
ESSO / SARPOM
VARIOUS
TRECATE REFINERYAUTO OIL 2 PROJECTITALY
INSTRUMENT BULK MATERIALS,MULTI-TUBING AND CABINET COOLERS 2004
TECNIMONT
VARIOUS
NANHAI PROJECTCHINA
INSTRUMENT AND ELECTRICAL BULK MATERIALS, ELECTRICALLY TRACED MULTI - TUBING, CONTROLPANELS, CONCURRENT ENGINEERING
2004
ROSETTI MARINO
INAGIP IKAA - B & IDAA-B -C - PLATFORMSCROATIA
CHOKE VALVES 2004
SNAMPROGETTILUMMUS GA
VARIOUS
AGIP GAS BVMELLITAH PROJECTLYBIA
INSTRUMENT BULK MATERIALS ANDDUAL PLATE CHECK VALVES 2004
BELAYIMPETROLEUMCOMPANY
VARIOUS
NORTH PORT SAID CONCESSION DEV. PROJECTEGYPT
OFFSHORE INSTRUMENT BULK MATERIALS AND LOOSE INSTRUMENTS 2003
FOSTER WHEELERITALIANA
TAMOIL REFINERYDU SUD OUESTCOLLOMBEYSWITZERLAND
MULTI-TUBING, PROTECTION BOXES ANDELECTRICAL HEATING SYSTEM 2003
SNAMPROGETTISAUDI ARAMCOQATIF GOSP-1SAUDI ARABIA
DUAL PLATE CHECK VALVES 2003
REFERENCES: PROCUREMENT DIVISION
CUSTOMER VENDOR PLANT DESCRIPTION YEAR
TECHNIP ITALY
VARIOUS
SABIC ACETIC ACIDPROJECT YAMBUSAUDI ARABIA
INSTRUMENT & PIPING BULK MATERIALS 2003
TECNIMONT
VARIOUS
NSP1 PI WESSELINGGERMANY
INSTRUMENT BULK MATERIALS, MULTI - TUBING AND PROTECTION BOXES 2003
ENI DIV. AGIP VARIOUS
VAL D’AGRI - OILRECOVERY CENTREVIGGIANOITALY
INSTRUMENT BULK MATERIALS ANDPROTECTION BOXES 2002
ENIPOWER VARIOUS
POWER PLANTSFERRERAERBOGNONE,MANTOVA, RAVENNAITALY
INSTRUMENT BULK MATERIALS 2002
WYETH LEDERLE CARDINALPHARMACEUTICALPLANT CATANIAITALY
ELECTROPOLISHED TUBING AND FITTINGS 2002
SNAMPROGETTI
VARIOUS
SAUDI ARAMCOKHUFFCONDENSATEFRACTIONAL PROJ.SAUDI ARABIA
INSTRUMENT BULK MATERIALS 2002
FOSTER WHEELERITALIANA
CHEMIPETROLPOLYPROPYLENEPLANT PP2LITVINOVCZECH REPUBLIC
MULTI - TUBING BUNDLE SYSTEMS 2002
AGIBA VARIOUSASHRAFI FIELD DEV.PROJECTEGYPT
INSTRUMENT AND ELECTRICAL BULK MATERIALS 2001
SNAMPROGETTI
VARIOUS
DUKHAN FIELD GASLIFT PROJECTQATAR
INSTRUMENT BULK MATERIALS ANDMONOBLOCK VALVES 2001
SNAMPROGETTI
QCPC NGL 4PROJECT MESAIEEDPLANTQATAR
TWINSAFE DOUBLE BLOCK & BLEED VALVES 2001
SNAMPROGETTI SUD VARIOUS
DUNASTYRPOLYSTYRENEMANUFACTURINGCO.SZAZHALOMBATTAHUNGARY
IN - LINE INSTRUMENTS AND BULK MATERIALS 2001
BELAYIMPETROLEUMCOMPANY
VARIOUSTEMSAH GAS FIELDDEV. PROJECTEGYPT
OFFSHORE & ONSHORE LOOSE INSTRUMENTS 2000
REFERENCES: PROCUREMENT DIVISION
CUSTOMER VENDOR PLANT DESCRIPTION YEAR
ENI DIV. AGIP VARIOUS
VAL D’AGRI - OILRECOVERY CENTREVIGGIANOITALY
MISCELLANEOUS INSTRUMENTS 2000
K.T.I./TECHNIP ITALY
VARIOUS
ISLA REFINERYNETHERLANDSANTILLES
PRE - INSULATED PIPES 2000
SAIPEM - INTERMARESARDA
VARIOUS
FOUKANDA ANDMWAFI PLATFORMS CONGO
INSTRUMENT BULK MATERIALS ANDACCESS FITTINGS FOR SANDPROBES 2000
TECNIMONT
VARIOUS
BOROUGEPOLYETHYLENEPROJECTU.A.E.
BALL VALVES, FITTINGS ANDTUBING, PRE - INSULATED ANDPRETRACED TUBING BUNDLES
2000
ENPPI FORBELAYIMPETROLEUMCOMPANY
VARIOUS
BALTIM EAST GASPROJECTEGYPT
INSTRUMENT AND ELECTRICAL BULK MATERIALS 1999
LURGI
VARIOUS
SARLUX PROJECTSARROCHITALY
INSTRUMENT BULK MATERIALS 1999
MERCK SHARP &DOHME
PAVIA II EXPANSIONPROJECTITALY
PRESSURIZED AND NOT PRESSURIZED ENCLOSURES 1999
SNAMPROGETTI VARIOUS
JOSÈ FIRST FERTILIZERPROJECTJOSÈ - ESTADOANZOATEGUIVENEZUELA
INSTRUMENT BULK MATERIALS 1999
TECNIMONTKEMYA PROJECTSAUDI ARABIA
HIGH PRESSURE VALVES TUBING, FITTINGS AND SPARE PARTS 1999
BELAYIMPETROLEUMCOMPANY
VARIOUS
NORTH PORT SAIDCONCESSION PORTFOUAD SOUTH EAST1&2 PROJECTSEGYPT
INSTRUMENT BULK MATERIALS 1998
ABB VARIOUS
COMBUSTIONENGINEERING APIFALCONARA INTEGRATEDGASIFICATIONCOMBINED CYCLEITALY
INSTRUMENT AND ELECTRICAL BULK MATERIALS 1998
SNAMPROGETTITRIANGLECONTROLS
ADNOC ASAB GASDEVELOPMENTPROJECTU.A.E.
SAFETY VALVES 1998
REFERENCES: PROCUREMENT DIVISION
CUSTOMER VENDOR PLANT DESCRIPTION YEAR
SNAMPROGETTIFRANCE
LNG UPSTREAMFACILITIES PROJECTBARIK & SAIH RAWLOMAN
SLIM LINE VALVES, DOUBLE BLOCK & BLEED AND BLEED VALVES 1998
SNAMPROGETTI VARIOUSPETROCHEMIAPLOCK S.A.POLAND
PURGING AND FLUSHING SYSTEMS,INSTRUMENT PROTECTION ANDHEATING BOXES WITH MANIFOLDS
1998
SNAMPROGETTI
CONDOR TECH
PETROCHEMIAPLOCK S.A.POLAND
INSTRUMENT PROTECTION ANDHEATING BOXES WITH MANIFOLDS 1997
SNAMPROGETTI
VARIOUS
ADCO SAHIL FIELDDEVELOPMENTPROJECTU.A.E.
INSTRUMENT BULK MATERIALS 1997
SNAMPROGETTI VARIOUS
REVAMPINGVISBREAKERVACUUM SECTION1600ITALY
INSTRUMENT BULK MATERIALS 1997
TECHNIPETROLAMOCO CHEMICALPROJECTBELGIUM
PREINSULATED TUBING BUNDLES 1997
TECHNIPETROL
VARIOUS
CHINAPETROCHEMICALINT. QILU 140 K T/ALDPE PLANTCHINA
HIGH PRESSURE FITTINGS, TUBING, VALVES AND PRESSURE GAUGES 1997
ANSALDO DP SYSTEMSMEDINA YAMBUPLANTSAUDI ARABIA
INSTRUMENT PROTECTION & HEATING BOXES 1996
ENI DIV. AGIP VARIOUSMILAZZO REFINERYITALY
INSTRUMENT PROTECTION & HEATING BOXES 1996
SNAMPROGETTI VARIOUSPETROCHEMIAPLOCK S.A.POLAND
INSTRUMENT PROTECTION & HEATING BOXES 1996
TECHNIPETROL
VARIOUS
SINOPECCHINA
INSTRUMENT BULK MATERIALS 1996
TECNIMONT
VARIOUS
PTA PLANTYAMBU IND.SAUDI ARABIA
INSTRUMENT BULK MATERIALS 1996
REFERENCES: PROCUREMENT DIVISION
CUSTOMER VENDOR PLANT DESCRIPTION YEAR
ABB SAE SADELMI
VARIOUS
MINISTRY OFELECTRICITY &WATER-POWER AND DESALINATION PLANTQATAR
INSTRUMENT BULK MATERIALS 1995
ABB SAE SADELMI
VARIOUS
DUBAI ELECTRICITY& WATERAUTHORITYU.A.E.
INSTRUMENT BULK MATERIALS 1995
ANSALDOJACOROSSI M.E.W.KUWAIT
INSTRUMENT BULK MATERIALS 1995
SNAMPROGETTI VARIOUS
PEMEX / HDRCOMPLEX MIGUELHIDALGO REFINERYTULAMEXICO
PURGING AND FLUSHING SYSTEMS,INSTRUMENT BULK MATERIALS 1995
SNAMPROGETTI VARIOUSTUPRAS - IZMITREFINERYTURKEY
THERMOSTATIC VALVES, LABORATORIES ANDTEST BENCHES, INSTRUMENT BULK MATERIALS 1995
AGIP AFRICA
VARIOUS
BIR REBAA NORTH ALGERIA
HIGH PRESSURE FITTINGS, TUBING AND MANIFOLDS 1994
SNAMPROGETTI
VARIOUS
SALINE WATERCONVERSIONYAMBU MEDINA -SAUDI ARABIA
INSTRUMENT BULK MATERIALS 1994
SNAMPROGETTI
VARIOUS
NIOC BANDARABBAS PROJECTIRAN
INSTRUMENT AND ELECTRICAL BULK MATERIALS 1994
SNAMPROGETTI
WILAYA D’OUARGLIA -BIR REBAAALGERIA
INSTRUMENT BULK MATERIALS 1994
TECHNIPETROLECOPETROLCOLOMBIA
INSTRUMENT BULK MATERIALS 1994
NIGERIAN AGIP OILCOMPANY
VARIOUS
PORT HARCOURTNIGERIA
INSTRUMENT BULK MATERIALS 1993
SNAMPROGETTI
VARIOUS
PETROCHEMICALPLANTPORTO TORRESITALY
INSTRUMENT AND ELECTRICAL BULK MATERIALS 1993
REFERENCES: PROCUREMENT DIVISION
CUSTOMER VENDOR PLANT DESCRIPTION YEAR
SNAMPROGETTI
VARIOUS
EVA RESIN PLANTBEIJINGCHINA
HIGH PRESSURE FITTINGS, TUBING ANDVALVES AND ELECTRICAL BULK MATERIALS 1993
SNAMPROGETTI VARIOUSTUPRAS - IZMIRALIAGA REFINERYTURKEY
INSTRUMENT BULK MATERIALS 1993
TECHNIPETROL
VARIOUS
ETHYLENE PLANTCHINA
INSTRUMENT BULK MATERIALS 1993
ADNOC VARIOUSUMM AL NARPROJECT ABU DHABI U.A.E.
FLOW CONTROL SYSTEMS, ENGINEERING ANDTESTING 1992
BELLELIAGIP AMELIA “B” PLATFORMITALY
COMPRESSION FTTINGS, TUBING AND20.000 PSI VALVES 1992
BELLELINAM SHELL PROJECTITALY
INSTRUMENT BULK MATERIALS 1992
SNAMPROGETTI
VARIOUS
TRANS - TUNISINEPIPELINETUNISIA
INSTRUMENT AND ELECTRICAL BULK MATERIALS 1992
TECHNIPETROL
VARIOUS
ETHYLENE PLANTBRINDISIITALY
INSTRUMENT BULK MATERIALS 1992
CONSTRUCTION & PMCSince its foundation in the early nineties our Construction Business Unit has combined the knowledge and experiences of its engineers in order to meet the market demand in the Oil&Gas, Upstream and Downstream Petrochemical and Power Generation fields.
Our Construction Business Unit, thanks to its dynamic and flexible structure, has been able to spread out its skills in the main direction of the industrial process, thus developing its four main departments:ANALYSIS, PNEUMO - HYDRAULIC SYSTEMS, AUTOMATION & SAFETY CONTROL SYSTEMS, SKIDS, PACKAGES & PROJECT MANAGEMENT CONSULTING - PMC.
ANALYSIS
- Analyzer Shelters- Sampling Conditioning Systems- Emission Monitoring Systems- Stack Gas Analyzer Systems
- Liquid & Gas Laboratory Sampling- Waste Water Analysis Systems- Water & Steam Sampling- Process Analyzers
PNEUMO- HYDRAULIC SYSTEMS
- Wellhead Control Panels- Electro - Pneumatic Control Panels- Hydraulic Power Units
- Project Management- Process Control Applications Design & Construction- Safety Applications Design & Construction
- Network System Integration- System Migration & Revamping- On-Cal Maintenance Program
AUTOMATION & SAFETY CONTROL SYSTEMS.
SKIDS
- Fuel Gas Treatment Skids (Heating, Filtration, Reducing, Metering, Analysis)- Gas Odorizer Skids- Meter Provers- Launching and Receiving Traps- Manifold Skids
- Chemicals Injection Corrosion Skids- Methanol/Glycol Injection Skids- Gas Reducing Stations- Gas Metering Skids- Gas Treatment Skids- Water Treatment Skids
- Development/review/approval of project procedures, methods, etc.
- Review/approval of Contractor engineering documents
- Review/approval and HAZOP of subcontractor/vendor engineering documents
- Engineering, interface requirements among different EPC contracts
- Co - ordination with Contractors for clear understanding of project requirements
- Co-ordination with procurement group for purchase of relevant equipment and materials
- SIL assessment
- Technical Bid evaluation
- FAT and Supervision of Commissioning
PROJECT MANAGEMENT CONSULTING - PMC
Activities Description:
ECISGROUP’s project manager is based in Client/Client’s Contractor as Client Representative, responsible for monitoring and controlling duties as following:
PACKAGES
- Instrument and Service Air Packages- Water Treatment Packages- Diesel Oil Packages- Hydrogen Production Packages- Nitrogen Production Packages: Membrane & PSA
- Trucks and Rail Tankers Loading Systems- Fire Fighting Packages- Early Production Facilities (Manifold, Well test Production, 1° and 2° test Separators, Oil Stabilizer, Slug Catcher)
- Analyzer Shelters
- Analyzer Cabinets
- Analyzer System Packages
- Water&Steam Sampling and Analysis Systems
- Continous Emission Monitoring Systems CEMS
- Sample Conditioning Systems for Process Analyzers
- Liquid&Gas Laboratory Sampling Systems
- Waste Water Analysis Systems
ANALYSIS
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : AGIPRAFFINAZIONESANNAZZARO
Project: SOUR WATER, NH3 MONITORING - [Italy]
Supply : ANALYZERCABINET [Dimensions: 5 x 2,5 x 2,7 mt.]
Year: 2001
[Internal view]
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : FOSTERWHEELERITALIANA
Project: RAFF. DU SUD-OVEST S.A. - [Saudi Arabia]
Supply : WATERANALYZERSYSTEM [Dimensions: 1,8 x 2,1 x 0,6 mt.]
Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
ANALYZERSHELTER,[internal view]
Dimensions: 6 x 2,5 x 2,7 mt.
SAMPLINGSYSTEMATTWOSTREAMS
Dimensions: 45 x 65 x 20 cm
Client : SNAMPROGETTI
Project: MTBE AL JUBAIL - [Saudi Arabia]
Supply : ANALYZERSHELTER [Dimensions: 6 x 2,5 x 2,7 mt.]
Year: 1995
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : TECNIMONT-TASNEEPETROCHEMICALS
Project: HDPE 400 KT–Y JUBAIL - [Saudi Arabia]
Supply : N°3ANALYZERSHELTER[Dimensions: 10 x 2,5 x 2,7 mt. - Weigh: 50.000 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : TECNIMONT-TASNEEPETROCHEMICALS
Project: HDPE 400 KT–Y JUBAIL - [Saudi Arabia]
Supply : N°3ANALYZERSHELTER[Dimensions: 10 x 2,5 x 2,7 mt. - Weigh: 50.000 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : TECNIMONT-TASNEEPETROCHEMICALS
Project: HDPE 400 KT–Y JUBAIL - [Saudi Arabia]
Supply : N°3ANALYZERSHELTER[Dimensions: 10 x 2,5 x 2,7 mt. - Weigh: 50.000 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : TECNIMONT-TASNEEPETROCHEMICALS
Project: HDPE 400 KT–Y JUBAIL - [Saudi Arabia]
Supply : N°3ANALYZERSHELTER[Dimensions: 10 x 2,5 x 2,7 mt. - Weigh: 50.000 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : ENELPOWER-P.TOCORSINI
Project: HIGH PRESSURE BOILER SAMPLING AND ANALYSIS SYSTEM - [Italy]
Supply : STEAMANDHOTWATERSAMPLINGFORPOWERGENERATION LocalPanels [Dimensions: 10 x 7 x 3 mt.]
Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENELPOWER-P.TOCORSINI
Project: HIGH PRESSURE BOILER SAMPLING AND ANALYSIS SYSTEM - [Italy]
Supply : STEAMANDHOTWATERSAMPLINGFORPOWERGENERATION(LocalPanels) [Dimensions: 10 x 7 x 3 mt.]
Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENELPOWER-P.TOCORSINI
Project: HIGH PRESSURE BOILER SAMPLING AND ANALYSIS SYSTEM- [Italy]
Supply : STEAMANDHOTWATERSAMPLINGFORPOWERGENERATION(LocalPanels) [Dimensions: 10 x 7 x 3 mt.]
Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENELPOWER-P.TOCORSINI
Project: HIGH PRESSURE BOILER SAMPLING AND ANALYSIS SYSTEM - [Italy]
Supply : STEAMANDHOTWATERSAMPLINGFORPOWERGENERATION(LocalPanels) [Dimensions: 10 x 7 x 3 mt.]
Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENELPOWER-P.TOCORSINI
Project: HIGH PRESSURE BOILER SAMPLING AND ANALYSIS SYSTEM - [Italy]
Supply : STEAMANDHOTWATERSAMPLINGFORPOWERGENERATION(LocalPanels) [Dimensions: 10 x 7 x 3 mt.]
Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : TECHINT/ENIR&M
Project: HYDROGEN PRODUCTION HMU - [Taranto / Italy]
Supply : “TURNKEYJOB”SUPPLYOF2ANALYZERSHELTERS&ANALYZERS [Dimensions: 2,5 x 2,5 x 2,7 mt.]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
[Internal view]Client : TECHINT/ENIR&M
Project: HYDROGEN PRODUCTION HMU - [Taranto / Italy]
Supply : “TURNKEYJOB”SUPPLYOF2ANALYZERSHELTERS&ANALYZERS [Dimensions: 2,5 x 2,5 x 2,7 mt.]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
[Internal view]Client : TECHINT/ENIR&M
Project: HYDROGEN PRODUCTION HMU - [Taranto / Italy]
Supply : “TURNKEYJOB”SUPPLYOF2ANALYZERSHELTERS&ANALYZERS [Dimensions: 2,5 x 2,5 x 2,7 mt.]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : TECHINT/EMETHANEX
Project: EMETHANEX - DAMIETTA - [Egypt]
Supply : ANALYZERSHELTERFORASUANALYZERSYSTEM [Dimensions: 4 x 2,5 x 2,7 mt]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : TECHINT/EMETHANEX
Project: EMETHANEX - DAMIETTA - [Egypt]
Supply : ANALYZERSHELTERFORASUANALYZERSYSTEM [Dimensions: 4 x 2,5 x 2,7 mt]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
[Internal view]Client : TECHINT/EMETHANEX
Project: EMETHANEX - DAMIETTA - [Egypt]
Supply : ANALYZERSHELTERFORASUANALYZERSYSTEM [Dimensions: 4 x 2,5 x 2,7 mt]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : TECHINT/EMETHANEX
Project: EMETHANEX - DAMIETTA - [Egypt]
Supply : ANALYZERSHELTERFORMASSSPECTOMETERANALYZERSYSTEM [Dimensions: 3,5 x 2,5 x 2,7 mt]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : TECHINT/EMETHANEX
Project: EMETHANEX - DAMIETTA - [Egypt]
Supply : ANALYZERSHELTERFORMASSSPECTOMETERANALYZERSYSTEM [Dimensions: 3,5 x 2,5 x 2,7 mt]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
[Internal view]Client : TECHINT/EMETHANEX
Project: EMETHANEX - DAMIETTA - [Egypt]
Supply : ANALYZERSHELTERFORMASSSPECTOMETERANALYZERSYSTEM [Dimensions: 3,5 x 2,5 x 2,7 mt]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : EMERSONPROCESSMANAGEMENTSPAforTAKREE/TECHNIP
Project: ULG LSGO PROJECT - [UAE Ruwais Abu Dhabi]
Supply : ANALYZERSAMPLECONDITIONINGSYSTEM
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : TECNIMONT/BOROUGE
Project: POLYETHYLENE - [Abu Dhabi - UAE]
Supply : “TURNKEYJOB”SUPPLYOF2NEWANALYZERSSHELTERS [Dimensions: 11 x 3,5 x 3,2 mt - 13 x 3,5 x 3,2 mt]
Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
[Internal view]Client : TECNIMONT/BOROUGE
Project: POLYETHYLENE - [Abu Dhabi - UAE]
Supply : “TURNKEYJOB”SUPPLYOF2NEWANALYZERSSHELTERS [Dimensions: 11 x 3,5 x 3,2 mt - 13 x 3,5 x 3,2 mt]
Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : SNAMPROGETTI/QATOFIN
Project: QATOFIN LLDPE PLANT - [Qatar]
Supply : PROCESS GASANALYZERSHELTER [Dimensions: 9 x 2,5 x 2,7 mt - Weight: 45.000 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : SNAMPROGETTI/QATOFIN
Project: QATOFIN LLDPE PLANT - [Qatar]
Supply : PROCESS GASANALYZERSHELTER [Dimensions: 9 x 2,5 x 2,7 mt - Weight: 45.000 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : SNAMPROGETTI/QATOFIN
Project: QATOFIN LLDPE PLANT - [Qatar]
Supply : PROCESS GASANALYZERSHELTER [Dimensions: 9 x 2,5 x 2,7 mt - Weight: 45.000 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
[Internal view]Client : SNAMPROGETTI/QATOFIN
Project: QATOFIN LLDPE PLANT - [Qatar]
Supply : PROCESS GASANALYZERSHELTER [Dimensions: 9 x 2,5 x 2,7 mt - Weight: 45.000 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : SNAMPROGETTI/ENIPOWER
Project: CENTRALE A CICLO COMBINATO di Ravenna - [Italy]
Supply : “TURNKEYJOB“SUPPLYOFANALYZERSHELTERFORBTUMEASUREMENTOFNATURALGAS [Dimensions: 5,8 x 3 x 2,7 mt - Weight: 6.100 Kg]
Year: 2003
CONSTRUCTIONDIVISION
Analysis
References
REFERENCES: ANALYSIS
CUSTOMER END USER PROJECT DESCRIPTION YEAR
ALSTOM POWER RIMINI PROJECT“TURN KEY JOB”Supply of 1 Nitrogen Blanketing System”.
2009
COREIMPIANTO DITERMOVALORIZ-ZAZIONE RSU
Revamping Analysis System 2009
SAIPEM QATARBRANCH
MTY LLDPE PLANTMESAIEEDQATAR
Hydrocarbon L.E.L. Detector infraredcomplete with sampling systemDimensions 1,2 x 0,8 x 2,1 mWeight : 150 Kg
2009
SARLUXRAFFINERIA DISARROCH
Emissions Analyzers Shelter 2009
TECHINTEMETHANEXDamietta
1 MASS SPECTROMETER ANALYZER SHELTER /1 AIR SEPARATION UNIT ANALYZER SHELTERDimensions 4 x 2,5 x 2,7 m eachWeight : 5.500 Kg each
2008
SAIPEMCOMERCIOMARITIMOSOCIEDADE LDA
ENGROAMMONIA - UREAPLANT
NOX Analysis Local Cabinet + O2 Analysis Local Rack + 13 Local Racks for PH, Free Chlorine Conductivity Analysis complete with Sample Conditioning System.
2008
FWIREFINERY GASDESULPHURAZA-TIONBAHRAIN
“TURN KEY JOB”Supply of 1 Conductivity Analyzer
2008
TECHINT
ENI R & M
HYDROGENPRODUCTION HMU
“TURN KEY JOB”Supply of 1 ProcessAnalyzer Shelter with Analyzers
2008
TECHINT
ENI R & M
HYDROGENPRODUCTION HMU
“TURN KEY JOB”Supply of 1 Continuos Emissions Monitoring System Analyzer Shelter with Analyzers
2008
TECNIMONTHDPE 400 KT-Y JUBAILSAUDI ARABIA
“TURN KEY JOB”Supply of 1 Analyzers ShelterDimensions 3 x 2,5 x 2,7 m - Weight: 13.000 kg
2008
TECNIMONTHDPE 400 KT-Y JUBAILSAUDI ARABIA
“TURN KEY JOB”Supply of 3 Analyzers SheltersDimensions 10 x 2,5 x 2,7 m - Weight: 50.000 kg
2007
EDISON COLLALTO PLANT
“TURN KEY JOB”. Supply of 1 Analyzer Shelter &1 Metering Skid & 1 Filtering Skid.Analyzer Dimensions: 3 x 2,5 x 2,7 m Weight: 15.000 kgMetering Skid Dim.: 19 x 3,7 x 2 m Weight: 25.000 kgFiltering Skid Dim.: 9,7 x 3,2 x 3m Weight: 24.000 kg
2007
REFERENCES: ANALYSIS
CUSTOMER END USER PROJECT DESCRIPTION YEAR
ALSTOM30245 FORLI’ PROJECT
“TURN KEY JOB”Supply of 1 Nitrogen Blanketing System”.
2007
ALSTOM30245 FERRARAPROJECT
“TURN KEY JOB”Supply of 1 Nitrogen Blanketing System
2007
SNAMPROGETTIMTY LLDPE PLANT -MESAIEEDQATAR
“TURN KEY JOB”Supply of 1 Analyzer ShelterDimensions : 9 x 2,5 x 2,7 mWeight: 45.000 kg
2007
SNAMPROGETTISUD
ENI R & M
HYDROCRACKING RHU - TARANTO RAFFINERY
“TURN KEY JOB”Supply of 30 Sampling Systems
2007
FOSTERWHEELER
REFINERY GASDESULPHURAZA-TIONBAHRAIN
“TURN KEY JOB”Supply of 2 Green Field AnalyzersDimensions: 1 x 0,8 x 2,1 mWeight: 500 kg
2006
SNAMPROGETTI AUTO - OIL 2“TURN KEY JOB”Supply of analyzer shelter and FTIRanalyser for sampling analysis
2005
F.W.I. AUTO - OIL 2“TURN KEY JOB”Supply of analyzer package for sampling analysis
2004
SNAMPROGETTI RIO POLIMEROS“TURN KEY JOB”Supply of Laboratory Sampling Systems
2003
SNAMPROGETTI/ENIPOWER
CENTRALE A CICLOCOMBINATO DIFERRARAERBOGNONE
“TURN KEY JOB”Supply of analyzer shelter for BTUmeasurement of natural gas and syngas analysis
2003
SNAMPROGETTI/ENIPOWER
CENTRALE A CICLOCOMBINATO DIRAVENNA
“TURN KEY JOB”Supply of analyzer shelter for BTUmeasurement of natural gas
2003
SNAMPROGETTI/ENIPOWER
CENTRALE A CICLOCOMBINATO DI BRINDISI
“TURN KEY JOB”Supply of analyzer shelter for BTUmeasurement of natural gas
2003
SNAMPROGETTI/ENIPOWER
CENTRALE A CICLOCOMBINATO DIMANTOVA
“TURN KEY JOB”Supply of analyzer shelter for BTUmeasurement of natural gas
2003
REFERENCES: ANALYSIS
CUSTOMER END USER PROJECT DESCRIPTION YEAR
ENELPOWER
SULCIS
HIGH PRESSURE BOILER SAMPLING AND ANALYS SYSTEM
“TURN KEY JOB”Supply of 11 sampling streams equipped with sample treatment analysers.
2003
ENELPOWER
TERMINI - IMERESE
HIGH PRESSURE BOILER SAMPLING AND ANALYS SYSTEM
“TURN KEY JOB”Supply of 32 sampling streams equipped with sample treatment, analysers and one new shelter.
2003
ENELPOWER
PRIOLO - GARGALLO
HIGH PRESSURE BOILER SAMPLING AND ANALYS SYSTEM
“TURN KEY JOB”Supply of 32 sampling streams equipped with sample treatment, analysers and one new shelter.
2002
ENELPOWER
PORTO CORSINI
HIGH PRESSURE BOILER SAMPLING AND ANALYS SYSTEM
“TURN KEY JOB”Supply of 28 sampling streams equipped with sample treatment , analysers and one new shelter.(ext dim. 10 x 7x 3m)
2001
F.W.I. ISOMERIZATION Revamping sampling streams selection 2001
F.W.I. ISOMERIZATIONRevamping existing analyser shelter with new gaschromatograph
2001
TECNIMONT POLYETHYLENE
“TURN KEY JOB”. Supply of two new analyzers shelters(ext. dim. 11 x 3,5 x 3,2m and 13 x 3,5 x 3,2m) with: 20 “GCs”; / 27 “Moisture analyzers in field sampling sys-tems” / 20 “O2 ppm analyzers in field sampling systems”; / 7 “O2 Thermoparamagnetic in field sampling systems”.
2001
SNAMPROGETTI
FERRARA
HYPROX
Supply of new analyzers shelters(ext. dim. 5,5 x 2,5 x 2,7m) with installation of:- q.ty 2 “GCs”;- q.ty 4 “O2 Thermoparamagnetic analyzers”;- q.ty 1 Colorimeter analyzer.
2001
SNAMPROGETTI SUD
SANNAZZARODE BURGONDI (PV)
GAS TO LIQUIDDEMOSTRATION
Supply of new analyzers shelters(ext. dim. 5 x 2,5 x 2,7m) with installation of:- q.ty 4 “GCs”;
2001
TECNIMONT POLYETHYLENEMoisture Analyser and Analyser Data CommunicationCabinets
2001
SNAMPROGETTIFERTINITRO C.E.C.
JOSE’ EDO. A.(VENEZUELA)
FERTILIZER
Supply of new two analyzers shelters(ext. dim. 7 x 2,6 x 2,7m) with installation of:- q.ty 10 “Infrared analyzers” (safekeeping);- q.ty 1 “Thermal Conductivity analyzer” (safekeeping);- q.ty 4 “O2 analyzers in Flue Gas” (safekeeping);- q.ty 4 “GCs” (safekeeping).
1999
SNAMPROGETTI AGD
“TURN KEY JOB”. Supply of five new analyzers shelters (ext. dim. 5 x 3,2 x 3,4m, 5,5 x 3,2 x 3,4m,6 x 3,2 x 3,4m, for q.ty 2 and 8 x 5 x 3,4m) with:q.ty 4 “GCs”; q.ty 2 “RVP analyzers”;q ty 2 “TOC analyzers”;
1999
REFERENCES: ANALYSIS
CUSTOMER END USER PROJECT DESCRIPTION YEAR
F.W.I. COGE
“TURN KEY JOB”. Revamping analyzers shelters at site with installation of new “GC” and “H2S analyzers”. Supply of one new analyzer shelter (ext. dim. 4 x 2,5 x 2,7m) with: q.ty 1 Environment analysis system.
1998
TECHINT BTHSupply of new one analyzer shelter(ext. dim. 2,5 x 2,5 x 2,7m) with installation of:- q.ty 1 “GC” (safekeeping).
1998
ENICHEM
PRIOLO (SR)
CLA/CS3Supply of new one analyzers shelter(ext. dim. 5 x 2,5 x 2,7m) with installation of:- q.ty 3 “GCs” (safekeeping).
1998
TECHNIP ITALYGDANSKA REF.
GDANSKA (POLAND)IMERIZATION &REFORMER
Supply of new one analyzers shelter(ext. dim. 4 x 2,5 x 2,7m) with installation of:- q.ty 2 “GCs” (safekeeping);- q.ty 2 “H2” analyzer (safekeeping).
1998
SNAMPROGETTI
(POLAND)
VACUUM
Supply of new one analyzers shelter(ext. dim. 5 x 2,5 x 2,7m) with installation of:q.ty 1 “GC”; q.ty 1 “TOC analyzer”;q.ty 1“Vacuum distillar”; q ty 1“Wobbe Index analyzer”
1998
TECHNIP ITALY
P.TO MARGHERA (VE)
ETHYLENE
Supply of new six analyzers shelters (ext. dim. 5 x 2,5 x 2,7m for q.ty 2, 2,5 x 2,5 x 2,7m for q.ty 3 and 8 x 3 x 2,7m) with installation of: q.ty 12 “GCs” (safekeeping);q.ty 2 O2 analysis control board (safekeeping).
1997
F.W.I.
AUGUSTA (SR)
A.M.B.R.
“TURN KEY JOB”.Supply of one new analyzers shelter(ext. dim. 5 x 2,5 x 2,7m) with:- q.ty 2 “GCs”.
1997
ENICHEM
PRIOLO (SR)
OLE/ARO CR23Supply of one new analyzers shelter(ext. dim. 5 x 2,5 x 2,7m) with installation of:- q.ty 5 “GCs” (safekeeping).
1997
ENICHEM
PRIOLO (SR)
PROPILENE OXIDESupply of one new analyzers shelter(ext. dim. 6 x 2,5 x 2,7m) with installation of:- q.ty 5 “GCs” (safekeeping).
1996
HARTMANN &BRAUN
BRINDISI (BR)
POLYETHYLENE
Supply of one new analyzers shelter(ext. dim. 13 x 3 x 2,9m) with installation of:- q.ty 6 “GCs” (safekeeping);- q.ty 2 H2 analyzers (safekeeping);- q.ty 6 O2 analyzers (safekeeping);
1996
SNAMPROGETTI
TULA (MEXICO)
HYDROCRACKER
Supply of new analysis system composed by loosesmaterials needed to connect at “GCs”, “IR analyzers”,“O2/combustible in flue gas analyzers”, “Densityanalyzers”, “Moisture analyzers”, “pH analyzer”, “SO2/O2 in flue gas analyzer” and “H2S/SO2 air demand”.
1996
HARTMANN &BRAUN
HOLLAND
POLYMER. &MONOMERS
Supply of two new analyzers shelters(ext. dim. 5 x 2,5 x 2,7m and 2,5 x 2,5 x 2,7m)with installation of:- q.ty 8 “GCs” (safekeeping)
1996
REFERENCES: ANALYSIS
CUSTOMER END USER PROJECT DESCRIPTION YEAR
F.W.I.
LIVORNO (LI)
ISOMERIZ.
“TURN KEY JOB”. Supply of one new analyzers shelter (ext. dim. 3,5 x 2,5 x 2,7m) with:- q.ty 1 “GC”;- q.ty 1 “H2 analyzer”
1996
SNAMPROGETTI
(POLAND)
HYDROCRACKER
Supply of one new analyzers shelter(ext. dim. 5,5 x 2,5 x 2,7m) with installation of:- q.ty 1 “GC” (safekeeping);- q.ty 1 “Flue gas monitoring system” (safekeeping).
1996
SARPOM FCCU
“TURN KEY JOB”. Revamping of one analyzers shelter at site with supply of new analyzers shelter and installation of: q.ty 1 “CO anal.” (safekeeping); q.ty 2 “O2 anal.” (safekeep-ing); q.ty 1 “GC” (safekeeping).The above analyzers were dismantling by the old shelter. All these activities was performed with the plant running.
1995
SARPOMSOLVENTS &REFORMER
“TURN KEY JOB”.Revamping of three analyzers shelter at site withinstallation of new “CFPP analyzer” and “Distillaranalyzer”.
1995
TECNIMONT
FERRARA (FE)
POLYPROPILENESupply of one new analyzers shelter (ext. dim. 5 x 2,5 x 2,7m) with installation of:- q.ty 4 “GCs” (safekeeping).
1995
SNAMPROGETTIIBN ZAHRAL JUBAIL(S. ARABIA)
MTBE III“TURN KEY JOB”. Supply of one new analyzers shelter (ext. dim. 6 x 2,5 x 2,7m) with installation of:- q.ty 5 “GCs” (safekeeping).
1995
SNAMPROGETTI
PUYANG (P.R. CHINA)
POLYETHYLENE
“TURN KEY JOB”. Supply of new analysis system composed by sample conditioning systems and looses materials needed to connect at “GCs”,“Moisture and Oxygen analyzers”.
1995
SNAMPROGETTIZHONG -YOUAN
(P.R. CHINA)
POLYETHYLENE
“TURN KEY JOB”. Supply of new analysis system composed by sample conditioning systems and looses materials needed to connect at “GCs”,“Moisture and Oxygen analyzers”.
1994
HARTMANN &BRAUN
MAOMING (P.R. CHINA)
POLYETHYLENE
“TURN KEY JOB”Supply of one new analyzers shelter(ext. dim. 4 x 2,5 x 2,7m) with installation of:- q.ty 4 “GCs” (safekeeping).
1994
HARTMANN &BRAUN
MAOMING (P.R. CHINA)
STYRENE“TURN KEY JOB” Supply of one new analyzers shelter (ext. dim. 4 x 2,5 x 2,7m) with installation of:- q.ty 2 “GCs” (safekeeping).
1994
TECHINTSPLITTERPROPANE
“TURN KEY JOB”Supply of one new analyzers shelter(ext. dim. 2,5 x 2,5 x 2,7m) with installation of:- q.ty 1 “GC” (safekeeping).
1993
SARPOM SOLVENTS“TURN KEY JOB”Revamping analyzers shelter at site with installation of new “Distillar analyzer”.
1992
- Pneumatic Local Control Panels
- Hydraulic Power Units
- Well Head Control Panels
PNEUMOHYDRAULICSYSTEMS
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : ENIEMS
Project: DAVIDE PLATFORM - [Italy]
Supply : ELECTRO-PNEUMATICPANELSFOR3WELLHEAD [Dimensions: 2,15 x 0,7 x 1,8 mt. - Weight: 350 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
[Internal view]
Client : ENIEMS
Project: DAVIDE PLATFORM - [Italy]
Supply : ELECTRO-PNEUMATICPANELSFOR3WELLHEAD [Dimensions: 2,15 x 0,7 x 1,8 mt. - Weight: 350 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : TECHNIP&CHIYODAJV-QATARGAS
Project: QATAR GAS 3 & 4 ONSHORE PROJECT - [Qatar]
Supply : N°2WELLHEADCONTROLPANELFOR1WELL [Dimensions: 1,8 x 1,5 x 2,4 mt. - Weight: 1.300 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
[Internal view]
Client : TECHNIP&CHIYODAJV-QATARGAS
Project: QATAR GAS 3 & 4 ONSHORE PROJECT - [Qatar]
Supply : N°2WELLHEADCONTROLPANELFOR1WELL [Dimensions: 1,8 x 1,5 x 2,4 mt. - Weight: 1.300 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : QATAR-CHIYODA
Project: RAS LAFFAN LNG EXPOTION - [Qatar]
Supply : WELLHEADCONTROLPANELFOR2+1WELLS [Dimensions: 3,7 x 1,5 x 2,4 mt. - Weight: 2.700 Kg, 400 Barg Supply]
Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
[Internal view]
Client : QATAR-CHIYODA
Project: RAS LAFFAN LNG EXPOTION - [Qatar]
Supply : WELLHEADCONTROLPANELFOR2+1WELLS [Dimensions: 3,7 x 1,5 x 2,4 mt. - Weight: 2.700 Kg, 400 Barg Supply]
Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENPPI/NOSPCO
Project: ONS FIELD DEV. EGYPT - [Egypt]
Supply : SOLARWELLHEADCONTROLPANELFOR7WELLS(24Vdc) [Dimensions: 4 x 1,5 x 2 mt. - Weight: 3.500 Kg, 400 Barg Supply]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
[Internal view]
Client : ENPPI/NOSPCO
Project: ONS FIELD DEV. EGYPT - [Egypt]
Supply : SOLARWELLHEADCONTROLPANELFOR7WELLS(24Vdc) [Dimensions: 4 x 1,5 x 2 mt. - Weight: 3.500 Kg, 400 Barg Supply]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : CHYODA/SNAMPROGETTI
Project: RAS LAFFAN EXPANSION PROJECT - [Qatar]
Supply : N°2WELLHEADCONTROLPANEL [Dimensions: 3,7 x 1,5 x 2,4 mt. - Weight: 2700 Kg]
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : CHYODA/SNAMPROGETTI
Project: RAS LAFFAN EXPANSION PROJECT - [Qatar]
Supply : N°2WELLHEADCONTROLPANEL [Dimensions: 3,7 x 1,5 x 2,4 mt. - Weight: 2700 Kg]
Year: 2004
[Internal view]
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : JVTECHNIPFRANCE&CHIYODA-QATARGAS
Project: QATARGAS II DEVELOPMENT PROJECT - [Qatar]
Supply : N°2WHCPFORCONTROLN°1WELLHEAD [Dimensions: 4,1 x 2,1 x 2,4 mt. - Weight: 3.500 Kg, 400 Barg pressure design]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : JVTECHNIPFRANCE&CHIYODA-QATARGAS
Project: QATARGAS II DEVELOPMENT PROJECT - [Qatar]
Supply : N°2WHCPFORCONTROLN°1WELLHEAD [Dimensions: 4,1 x 2,1 x 2,4 mt. - Weight: 3.500 Kg, 400 Barg pressure design]
Year: 2007
[Internal view]
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GUPCO
Project: HA’PY PROJECT - [Egypt]
Supply : WELLHEADCONTROLPANELFOR6+3WELLS [Dimensions: 4,25 x 1,6 x 2 mt. - Weight: 4.500 Kg]
Year: 1999
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GUPCO
Project: HA’PY PROJECT - [Egypt]
Supply : WELLHEADCONTROLPANELFOR6+3WELLS [Dimensions: 4,25 x 1,6 x 2 mt. - Weight: 4.500 Kg]
Year: 1999
[Internal view]
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : JVTECHNIPFRANCE&CHIYODARASGAS
Project: RAS GAS ON-SHORE EXPANTION PROJECT PHASE 2 - [Qatar]
Supply : N°1WHCPFORCONTROL-N°4WELLHEAD [Dimensions: 4,25 x 1,6 x 2,4 mt. - Weight: 5.500 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : JVTECHNIPFRANCE&CHIYODARASGAS
Project: RAS GAS ON-SHORE EXPANTION PROJECT PHASE 2 - [Qatar]
Supply : N°1WHCPFORCONTROL-N°4WELLHEAD [Dimensions: 4,25 x 1,6 x 2,4 mt. - Weight: 5.500 Kg]
Year: 2007
[Internal view]
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENPPI/PETROBEL
Project: DENIS “A“ GAS DEVELOPMENT PROJECT EGYPT - [Egypt]
Supply : HYDRAULICCONTROLUNITSFOR6WELLS+19NONWELLSVALVES [Dimensions: 7 x 1,5 x 2 mt. - Weight: 6.500 Kg, 690 Barg pressure design]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
[Internal view]
Client : ENPPI/PETROBEL
Project: DENIS “A“ GAS DEVELOPMENT PROJECT EGYPT - [Egypt]
Supply : HYDRAULICCONTROLUNITSFOR6WELLS+19NONWELLSVALVES [Dimensions: 7 x 1,5 x 2 mt. - Weight: 6.500 Kg, 690 Barg pressure design]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : PETROBEL/EGYPT
Project: TEMSAH PLATFORM - [Egypt]
Supply : HYDRAULICCONTROLUNITSFOR8+4WELLS&18NONWELLSVALVES [Dimensions: 9 x 1,5 x 2 mt. - Weight: 8.500 Kg, 1.000 Barg Working pressure]
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
[Internal view]
Client : PETROBEL/EGYPT
Project: TEMSAH PLATFORM - [Egypt]
Supply : HYDRAULICCONTROLUNITSFOR8+4WELLS&18NONWELLSVALVES [Dimensions: 9 x 1,5 x 2 mt. - Weight: 8.500 Kg, 1.000 Barg Working pressure]
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : PETROBEL/EGYPT
Project: TEMSAH N.W. PLATFORM - [Egypt]
Supply : HYDRAULICCONTROLUNITSFOR8+4WELLS&18NONWELLSVALVES [Dimensions: 9 x 1,5 x 2 mt. - Weight: 8.500 Kg, 690 Barg Working pressure]
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : PETROBEL/EGYPT
Project: TEMSAH N.W. PLATFORM - [Egypt]
Supply : HYDRAULICCONTROLUNITSFOR8+4WELLS&18NONWELLSVALVES [Dimensions: 9 x 1,5 x 2 mt. - Weight: 8.500 Kg, 690 Barg Working pressure]
Year: 2004
[Internal view]
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : SUDELETTRA-ENIPOWER
Project: CANDELA GAS POVERO - [Italy]
Supply : PNEUMOHYDRAULICWELLHEADCONTROLPANELSFOR8WELLS [Dimensions: 3,9 x 2,1 x 2,6 mt. - Weight: 2.250 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : SUDELETTRA-ENIPOWER
Project: CANDELA GAS POVERO - [Italy]
Supply : PNEUMOHYDRAULICWELLHEADCONTROLPANELSFOR8WELLS [Dimensions: 3,9 x 2,1 x 2,6 mt. - Weight: 2.250 Kg]
Year: 2006
[Internal view]
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : AGIBAPETROLEUMCO.
Project: ASRAFI FILED PLATFORM - [Egypt]
Supply : REVAMPINGOFAPNEUMO-HYDRAULICCONTROLUNIT.SUPPLYOFANEWONEMODULEFORCONTROLLEROF:4WHCP
Year: 1996
CONSTRUCTIONDIVISION
Pneumo-HydraulicSystems & WHCP
References
REFERENCES: WHCP
CUSTOMER END USER PROJECT DESCRIPTION YEAR
KPOKARACHAGANAK.KAZAKHSTAN
“TURN KEY JOB”Supply of 9 hydraulic panels for old production designed to controll well-heads
2006/2009
INTERMARE SARDA
ANNAMARIA BPROJECT
“TURN KEY JOB”Supply of 5 local control panel
2008
VETCO GREYDENIS - 05 “A” GASDEVELOPMENTPROJECT
“TURN KEY JOB”Supply of 1 electropneumatic-hydraulic wellhead controlpanel unit designed to controll 4 wellheads
2008
TECHNIP &CHIYODA JV
QATARGAS 3 & 4ONSHORE PROJECT.QATAR
“TURN KEY JOB”Supply of 2 electropneumatic-hydraulic wellhead controlpanels each unit to 1 well and 1 Singleportable Shut-Down Panel
2007
TECHNIP &CHIYODA JV
QATARGAS 2 LNGONSHORE
“TURN KEY JOB”Supply of 2 electropneumatic-hydraulic wellhead controlpanels each unit to 1 well
2007
TECHNIP &CHIYODA JV
RAS GAS 3ONSHOREEXPANSION
“TURN KEY JOB”Supply of 2 Wellhead control panels each unit to 1 well
2007
ENPPIDENIS-05 “A” GASDEVELOPMENTPROJECT
“TURN KEY JOB”Supply of 6 pneumatic-hydraulic control units designed to controll well-heads
2007
ENPPI NOSPCOONS FIELD DEV.EGYPT
“TURN KEY JOB”Supply of 1 wellhead control designed to controll 7 wells
2006
SUDELETTRACANDELA GASPOVERO
“TURN KEY JOB”Supply of 2 new pneumo-hydraulic wellhead panelsdesigned to controll well-heads
2006
SUDELETTRACANDELA GASPOVERO.ITALIA
“TURN KEY JOB”Supply of 4 new pneumatic control panel designed tocontrol actuators
2006
ENI GROUP DAVIDE PLATFORM“TURN KEY JOB”Supply of new electropneumatic control panel todesigned to control valves on the weelhead
2005
ENPPITEMSAH NORTHWEST PROJECT
“TURN KEY JOB”Supply of new pneumo-hydraulic control units designedto control well-heads Q.ty n. 8 control units
2005
REFERENCES: WHCP
CUSTOMER END USER PROJECT DESCRIPTION YEAR
SNAMPROGETTIQATAR RAS LAFFANONSHOREEXPANSION
“TURN KEY JOB”Supply of 2 new pneumo-hydraulic control units designed to control well-heads Q.ty n. 2 controlunits
2004
ENPPITEMSAH-4PLATFORM PROJECT
“TURN KEY JOB”Supply of new pneumo-hydraulic control units designedto control well-heads Q.ty n. 8 control units
2004
ENI DIV.Exploration &Production
D.E.& P.
CLUSTERCALDAROSE RETEMONTE ALPI
“TURN KEY JOB”Supply of 1 Pneumohydraulic control unit
2004
SNAMPROGETTIQATAR RAS LAFFANONSHOREEXPANSION
“TURN KEY JOB”Supply of new pneumo-hydraulic control unit designedto control well-heads q.ty n. 3 control units
2002
ENI DIV. AGIPOIL FIELDSVAL D’AGRI (ITALY)
“TURN KEY JOB”Supply of new pneumo-hydraulic control units designedto control well-heads. q.ty n. 10 control units.
2002
EDISON GAS
(PESCARA) ITALY
SARAGO MARE 2“TURN KEY JOB”Supply of new pneumo-hydraulic control unit designedto control well-heads q.ty n.1 control unit.
2001
ENI S.p.A.STOGIT DIVISION
GAS STATIONSETTALA (MI)ITALY
“TURN KEY JOB”Supply of new pneumo-hydraulic control unit designed to control 7 well-heads. q.ty n.2 control units.
2001
COSMIPLATFORMSPCMS 1 PCC
Pneumatic Local Control Panels foractuated valves q.ty n.4 pneum. control panels
2001
LCM PIPELINEPneumatic Local Control Panels for Pipeline valves actuators q.ty n. 3 pneum. local control panels
2001
ENI S.p.A.DIVISIONE AGIP
RAVENNA
PLATFORMBARBARA F.
“TURN KEY JOB”Supply of new one pneumo-hydraulic control unit design for controller of: q.ty n.12 well-heads.
2000
GUPCO
RAS EL BAR (EGYPT)
HA’PY PROJ. GASTREATMENT
“TURN KEY JOB”Supply of new one pneumo-hydraulic control unit design for controller of: q.ty n.12 well-heads.
1999
AGIBAPETROLEUM CO.
ASRAFI FILEDPLATFORM
Revamping of a pneumo-hydraulic control unit. Supply of a new one module for controller of: q.ty n.4 well-heads
1996
SKIDS & PACKAGES- Fuel Gas Train Treatment Skids (ESD, Filtration, Metering, Analysis, Heater, Reducing)
- Gas Pressure Reducing Stations & Final Filtering for Gas Turbine
- Gas Pressure Reducing Stations for Auxiliary Boilers
- Gas Odorizer Systems
- Meter Provers
- Launching and Receiving Traps
- Manifold Skids
- Chemicals Injection Skids (Corrosion Inhibitor, Scale Inhibitor - Demulsifier, Pour Paint Depressant, Antifoam, Methanol, Glycol, DRAG Reducing Agent)
- Chemical Dosing Systems for Water-Steam Cycle and Water (Raw Water treatment, Make-up Water Tower, Desalization, Potabilization, Waste, Biological)
- Chemical Dosing Systems for Cooling Water Towers (Biocide, Biodispersant Sodiunm, Hypochlorite, Sulphuri acid, Oxygen Scavenger)
- Early Production Facilities (Manifold, Well Test Production, HP & LP Test Separator, Slug Catcher, Oil Stabilizer)
- TEG - MEG Packages
- Dehydration Systems Packages
- Nitrogen Production Packages: Membrane & PSA
- Instrument and Service Air Packages
- Trucks and Rail Tankers Arm Loading Systems
- Hydrogen Production Packages
- Diesel Power Generation Packages
- Water Treatment Packages
- Fire Fighting Packages
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENIDIV.E&P
Project: VAL D’AGRI ITALY - [Italy]
Supply : CHEMICALINJECTIONSKIDS [Dimensions: 3,2 x 2,4 x 2 mt. - Weight: 3.000 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : ENIDIV.E&P
Project: VAL D’AGRI ITALY - [Italy]
Supply : CHEMICALINJECTIONSKIDS [Dimensions: 3,2 x 2,4 x 2 mt. - Weight: 3.000 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : KPO
Project: KARACHAGANAK FIELD KAZAKHISTAN - [Kazakhistan]
Supply : SPENTCAUSTICNEUTRALIZATIONSKID [Dimensions: 2,5 x 1 x 2,8 mt. - Weight: 550 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : KPO
Project: KARACHAGANAK FIELD KAZAKHISTAN - [Kazakhistan]
Supply : SPENTCAUSTICNEUTRALIZATIONSKID [Dimensions: 2,5 x 1 x 2,8 mt. - Weight: 550 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : EGYPT-PETROBEL
Project: DARFEEL PLATFORM - [Egypt]
Supply : CHEMICALINJECTIONSKID [Dimensions: 6,5 x 2,5 x 3 mt. - Weight: 4.000 Kg]
Year: 1998
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : EGYPT-PETROBEL
Project: DARFEEL PLATFORM - [Egypt]
Supply : CHEMICALINJECTIONSKID [Dimensions: 6,5 x 2,5 x 3 mt. - Weight: 4.000 Kg]
Year: 1998
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : EDISON
Project: COLLALTO PROJECT - [Italy]
Supply : 7MEGDOSINGSYSTEM [Dimensions: 4,2 x 2,75 x 4 mt. - Weight: 8.800 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : EDISON
Project: COLLALTO PROJECT - [Italy]
Supply : 7MEGDOSINGSYSTEM [Dimensions: 4,2 x 2,75 x 4 mt. - Weight: 8.800 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : TECHNIPITALY/PKNORLEN
Project: HDS VII PLANT POLAND - [Poland]
Supply : N°2CHEMICALDOSINGSYSTEMS [Dimensions: 3 x 2 x 3,64 mt. - Weight: 2.200 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : TECHNIPITALY/PKNORLEN
Project: HDS VII PLANT POLAND - [Poland]
Supply : N°2CHEMICALDOSINGSYSTEMS [Dimensions: 3 x 2 x 3,64 mt. - Weight: 2.200 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENPPI-GUPCO
Project: HA’PY PRODUCTION INCREASED 3RD PROJECT - [Egypt]
Supply : GLYCOLINJECTIONPACKAGE [Dimensions: 9 x 2,6 x 2,8 mt. - Weight: 9.000 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENPPI-GUPCO
Project: HA’PY PRODUCTION INCREASED 3RD PROJECT - [Egypt]
Supply : GLYCOLINJECTIONPACKAGE [Dimensions: 9 x 2,6 x 2,8 mt. - Weight: 9.000 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : KBR-BP
Project: SAQQARA FIELD DEVELOPMENT PROJECT EGYPT - [Egypt]
Supply : CHEMICALINJECTIONSYSTEM [Dimensions: 14 x 3,5 x 4 mt. - Weight: 23.000 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : KBR-BP
Project: SAQQARA FIELD DEVELOPMENT PROJECT EGYPT - [Egypt]
Supply : CHEMICALINJECTIONSYSTEM [Dimensions: 14 x 3,5 x 4 mt. - Weight: 23.000 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : PETROBELEGYPT
Project: EL GAMIL PLANT UPGRADING PROJECT - [Egypt]
Supply : SWEETGLYCOLINJECTIONPUMPSKID-DENISELTSAREA [Dimensions: 13,2 x 3,2 mt. - Weight: 31.000 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : PETROBELEGYPT
Project: EL GAMIL PLANT UPGRADING PROJECT - [Egypt]
Supply : SWEETGLYCOLINJECTIONPUMPSKID-DENISELTSAREA [Dimensions: 13,2 x 3,2 mt. - Weight: 31.000 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : PETROBELEGYPT
Project: EL GAMIL PLANT UPGRADING PROJECT - [Egypt]
Supply : SWEETGLYCOLINJECTIONPUMPSKID-PORTFOUADLTSAREA [Dimensions: 19,65 x 3,2 mt. - Weight: 37.000 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENPPI/PETROBEL-EGYPT
Project: TEMSAH - 4 PLATFORM - [Egypt]
Supply : CHEMICALINJECTIONSKIDS [Dimensions: 2,7 x 2,4 x 4,1 mt. - Weight: 2.000 Kg]
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : SONATRACHAGIP
Project: RECUPERATION DES GAS DE TORCHE A ROM - [Algeria]
Supply : DIESELFIREPUMPSKID&ELECTRICALFIREPUMPSKID
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : EGYPT/PETROBEL
Project: TEMSAH PROJECT - EL GAMIL PLANT - [Egypt]
Supply : FUELGASSKID [Dimensions: 8 x 3,2 x 4,3 mt. - Weight: 17.000 Kg]
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
FUELGASSKID
FUELGASSKID
Client : ENPPI/PETROBEL
Project: TEMSAH - 4 PLATFORM - [Egypt]
Supply : INSTRUMENTANDSERVICEGASSKID [Dimensions: 7 x 3,2 x 5,2 mt. - Weight: 7.500 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENPPI/PETROBEL
Project: TEMSAH - 4 PLATFORM - [Egypt]
Supply : INSTRUMENTANDSERVICEGASSKID [Dimensions: 7 x 3,2 x 5,2 mt. - Weight: 7.500 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : EGYPT/PETROBEL
Project: TEMSAH N.W. GAS PLATFORM - [Egypt]
Supply : INSTRUMENTANDSERVICEGASSKID [Dimensions: 7 x 3,2 x 5,2 mt. - Weight: 13.300 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : EGYPT/PETROBEL
Project: TEMSAH N.W. GAS PLATFORM - [Egypt]
Supply : INSTRUMENTANDSERVICEGASSKID [Dimensions: 7 x 3,2 x 5,2 mt. - Weight: 13.300 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : NUOVOPIGNONE
Project: WEST EST GAS PIPELINE PROJECT CHINA - [China]
Supply : FUELGASCONDITIONINGSKID [Dimensions: 1,8 x 4,2 x 3 mt. - Weight: 3.520 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GE-NUOVOPIGNONE/YARA
Project: GAS TURBINE FOR POWER PLANT 3 - SLUISKIL - [China]
Supply : “TURNKEYJOB”SUPPLYOF1FUELGASSYSTEM [Dimensions: 5 x 3 x 4 mt. - Weight: 12.000 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GE-NUOVOPIGNONE/YARA
Project: GAS TURBINE FOR POWER PLANT 3 - SLUISKIL - [China]
Supply : “TURNKEYJOB”SUPPLYOF1FUELGASSYSTEM [Dimensions: 5 x 3 x 4 mt. - Weight: 12.000 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : NUOVOPIGNONE/WGTEII
Project: WEST EAST GAS PIPELINE DEVELOPMENT PROJECT CHINA - [China]
Supply : FUELGASCONDITIONINGSKIDS [Dimensions: 1,8 x 4,2 x 3 mt. - Weight: 3.520 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : NUOVOPIGNONE/WGTEII
Project: WEST EAST GAS PIPELINE DEVELOPMENT PROJECT CHINA - [China]
Supply : N°16FUELGASCONDITIONINGSKIDS [Dimensions: 1,8 x 4,2 x 3 mt. - Weight: 3.520 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : NUOVOPIGNONE-LG/OIEC/IOEC-NIOC
Project: SOUTH PARS - ASSALUYEH - [Iran]
Supply : FUELGASSKIDS [Dimensions: 6,8 x 2,5 x 4 mt. - Weight: 15.000 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : NUOVOPIGNONE-LG/OIEC/IOEC-NIOC
Project: SOUTH PARS - ASSALUYEH - [Iran]
Supply : FUELGASSKIDS [Dimensions: 6,8 x 2,5 x 4 mt. - Weight: 15.000 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENPPI/NOSPCO
Project: ONS FIELD DEV. EGYPT - [Egypt]
Supply : N°1FUELGASCONDITIONINGPACKAGE [Dimensions: 2,8 x 6 x 4 mt. - Weight: 7.000 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENPPI/NOSPCO
Project: ONS FIELD DEV. EGYPT - [Egypt]
Supply : N°1FUELGASCONDITIONINGPACKAGE [Dimensions: 2,8 x 6 x 4 mt. - Weight: 7.000 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : GEOIL&GAS/NUOVOPIGNONE
Project: QATARGAS III - [Qatar]
Supply : N°2FUELGASSCRUBBERSKIDS [Dimensions: 3,2 x 2,3 x 3,6 mt. - Weight: 4.500 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : GEOIL&GAS/NUOVOPIGNONE
Project: QATARGAS III - [Qatar]
Supply : N°2FUELGASSCRUBBERSKIDS [Dimensions: 3,2 x 2,3 x 3,6 mt. - Weight: 4.500 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : NUOVOPIGNONE-CB&I
Project: COVE POINT USA - [U.S.A.]
Supply : N°2FUELGASTREATMENTSKIDS [Dimensions: 2,6 x 1,7 x 3,8 mt. - Weight: 3.500 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : NUOVOPIGNONE-CB&I
Project: COVE POINT USA - [U.S.A.]
Supply : N°2FUELGASTREATMENTSKIDS [Dimensions: 2,6 x 1,7 x 3,8 mt. - Weight: 3.500 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : GE/NUOVOPIGNONE-QSGTL
Project: SHELL PEARL GTL - [Qatar]
Supply : N°2FUELGASSCRUBBERSKIDS [Dimensions: 3,2 x 2,1 x 3,8 mt. - Weight: 3.000 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : NUOVOPIGNONE/BRUNEI
Project: BLNG POWER PROJECT - [Brunei]
Supply : N°1FUELGASSCRUBBERSKIDS [Dimensions: 3 x 1,6 x 4,1 mt. - Weight: 3.600 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : NUOVOPIGNONE-LG/OIEC/IOEC-NIOC
Project: SOUTH PARS - ASSALUYEH - [Iran]
Supply : FUELGASSKIDS [Dimensions: 6,8 x 2,5 x 4 mt. - Weight: 15.000 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : NUOVOPIGNONE/RASHIDPETROLEUMCOMPANY
Project: ROSETTA EDKU - [Egypt]
Supply : FUELGASTREATMENTSKID [Dimensions: 4,2 x 2,6 x 4,2 mt. - Weight: 6.500 Kg]
Year: 2002
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : NUOVOPIGNONE/SONATRACH
Project: HASSI R’MEL - [Algery]
Supply : FUELGASSKIDS [Dimensions: 3 x 12 x 4,3 mt. - Weight: 28.000 Kg]
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GE/NUOVOPIGNONE
Project: WEST EAST PIPELINE FLOW INCREASEAD PROJECT - [China]
Supply : SUPPLYOF6FUELGASCONDITIONINGSKIDS [Dimensions: 3,2 x 2,3 x 3,6 mt. - Weight: 4.500 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GENUOVOPIGNONE/GASCO
Project: ASAB DEVELOPMENT PHASE II - [U.A.E.]
Supply : N°1SEALGASSKID [Dimensions: 1,2 x 3,5 x 2,6 mt. - Weight: 2.000 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GENUOVOPIGNONE/GASCO
Project: ASAB DEVELOPMENT PHASE II - [U.A.E.]
Supply : N°1SEALGASSKID [Dimensions: 1,2 x 3,5 x 2,6 mt. - Weight: 2.000 Kg]
Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GEOIL&GASNUOVOPIGNONE/QATARGAS
Project: QATARGAS 2 LNG TRAIN 4&5 - QATARGAS 3 LNG TRAIN 6 - QATARGAS 4 LNG TRAIN 7 - [Qatar]
Supply : N°12SEALGASSKIDSforCENTRIFUGALCOMPRESSORS [Dimensions: 2,3 x 9,4 x 4 mt. - Weight: 6.000 Kg]
Year: 2005/2006/2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GEOIL&GASNUOVOPIGNONE/QATARGAS
Project: QATARGAS 2 LNG TRAIN 4&5 - QATARGAS 3 LNG TRAIN 6 - QATARGAS 4 LNG TRAIN 7 - [Qatar]
Supply : N°12SEALGASSKIDSforCENTRIFUGALCOMPRESSORS [Dimensions: 2,3 x 9,4 x 4 mt. - Weight: 6.000 Kg]
Year: 2005/2006/2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GEOIL&GASNUOVOPIGNONE/QATARGAS
Project: QATARGAS 2 LNG TRAIN 4&5 - QATARGAS 3 LNG TRAIN 6 - QATARGAS 4 LNG TRAIN 7 - [Qatar]
Supply : N°12SEALGASSKIDSforCENTRIFUGALCOMPRESSORS [Dimensions: 2,3 x 9,4 x 4 mt. - Weight: 6.000 Kg]
Year: 2005/2006/2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GEOIL&GASNUOVOPIGNONE/QATARGAS
Project: QATARGAS 2 LNG TRAIN 4&5 - QATARGAS 3 LNG TRAIN 6 - QATARGAS 4 LNG TRAIN 7 - [Qatar]
Supply : N°12SEALGASSKIDSforCENTRIFUGALCOMPRESSORS [Dimensions: 2,3 x 9,4 x 4 mt. - Weight: 6.000 Kg]
Year: 2005/2006/2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GUPCO/EGYPT
Project: HA’PY PROJECT GAS TREATMENT - [Egypt]
Supply : GASMETERINGSYSTEMSKID [Dimensions: 10,7 x 5 x 3,3 mt. - Weight: 32.000 Kg]
Year: 1999
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : EGYPT/PETROBEL
Project: TEMSAH PROJECT / EL GAMIL PLANT - [Egypt]
Supply : GASMETERINGSKID [Dimensions: 13 x 5,1 x 4,5 mt. - Weight: 56.000 Kg]
Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : ENPPIEGYPTforPDVSAGAS
Project: PAGMI PROJECT PHASE 1 - [Venezuela]
Supply : CUSTODYTRANSFERMETERINGSYSTEM [Dimensions: 16,8 x 3,6 x 3 mt. - Weight: 52.000 Kg each]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : UOP/TECHNIP
Project: GREENGAS MANTOVA - [Italy]
Supply : N°6PSAGREENGASPOLYBED [Dimensions: 26 x 3,6 x 2,5 mt. - Weight: 831 Kg]
Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : KBR/BP
Project: SAQQARA FIELD DEVELOPMENT PROJECT - [Egypt]
Supply : PSANITROGENGENERATIONPACKAGE [Dimensions: 7,5 x 2,3 x 2,8 mt. - Weight: 10.000 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : KBR/BP
Project: SAQQARA FIELD DEVELOPMENT PROJECT - [Egypt]
Supply : PSANITROGENGENERATIONPACKAGE [Dimensions: 7,5 x 2,3 x 2,8 mt. - Weight: 10.000 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O N
Client : SAIPEM/NAOC
Project: IRRI FLOW STATION PROJECT - [Nigera]
Supply : NITROGENGENERATIONPACKAGE [Dimensions: 1 x 1,5 x 2 mt. - Weight: 600 Kg]
Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : KPO
Project: KPO KARACHAGANAK DEVELOPMENT - [Kazakhistan]
Supply : 1LPCLOSEDDRAINVESSELS [Dimensions: 14,4 x ∅ 3,6 mt. - Weight: 39.000 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : KPO
Project: KPO KARACHAGANAK DEVELOPMENT - [Kazakhistan]
Supply : 1LPCLOSEDDRAINVESSELS [Dimensions: 14,4 x ∅ 3,6 mt. - Weight: 39.000 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GROUPEMENTSONATRACH-AGIP
Project: FLARING DOWN PROJECT - Centre de traitement satellite ROM - [Algeria]
Supply : UNIT130INLETMANIFOLD [Dimensions: 20 x 7 mt. - Weight: 130.000 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GROUPEMENTSONATRACH-AGIP
Project: FLARING DOWN PROJECT - Centre de traitement satellite ROM - [Algeria]
Supply : UNIT130INLETMANIFOLD [Dimensions: 20 x 7 mt. - Weight: 130.000 Kg]
Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : PETROJET/PPC
Project: BASANDILA, SHATTA & TALKHA PROJECT - [Egypt]
Supply : SUPPLYOFNEW3LPGRECEIVINGSKIDS [Dimensions: 15 x 3,5 x 3,4 mt. - Weight: 20.000 Kg]
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : GEOil&GasNUOVOPIGNONE/QSGTL
Project: SHELL PEAR GTL/RAS LAFFAN - [Qatar]
Supply : N°6NITROGENPURGESKIDS
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : NUOVOPIGNONE/SCOP
Project: NAJAF PS3 - [Iraq]
Supply : INDIRECTWATERBATHGASHEATER [Dimensions: 9,8 x 2 x 2,5 mt. - Weight: 14.000 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : NUOVOPIGNONE/SCOP
Project: NAJAF PS3 - [Iraq]
Supply : INDIRECTWATERBATHGASHEATER [Dimensions: 9,8 x 2 x 2,5 mt. - Weight: 14.000 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : NUOVOPIGNONE/SCOP
Project: NAJAF PS3 - [Iraq]
Supply : INDIRECTWATERBATHGASHEATER [Dimensions: 9,8 x 2 x 2,5 mt. - Weight: 14.000 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : NUOVOPIGNONE/SCOP
Project: NAJAF PS3 - [Iraq]
Supply : INDIRECTWATERBATHGASHEATER [Dimensions: 9,8 x 2 x 2,5 mt. - Weight: 14.000 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : NUOVOPIGNONE/GREENSTREAM
Project: MELLITAH GAS COMPRESSION STATION - [Lybia]
Supply : FUELGASHEATERSKID [Dimensions: 2 x 7,5 x 7 mt. - Weight: 6.000 Kg]
Year: 2003
EPC CONTRACTORS
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : PETROJET/P.P.C.
Project: AGROUD STATION - [Egypt]
Supply : TRUKSLOADINGSTATIONFOR6LOADINGSYSTEMGASOIL,KERO,FUELOIL [Dimensions: 9,4 x 2,4 x 3 mt. - Weight: 18.000 Kg]
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : PETROJET/P.P.C.
Project: AGROUD STATION - [Egypt]
Supply : TRUKSLOADINGSTATIONFOR6LOADINGSYSTEMGASOIL,KERO,FUELOIL [Dimensions: 9,4 x 2,4 x 3 mt. - Weight: 18.000 Kg]
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : PETROJET/P.P.C.
Project: AGROUD STATION - [Egypt]
Supply : TRUKSLOADINGSTATIONFOR45LOADINGSYSTEM[15FORGASOIL,15FORKERO,15FORFUELOIL] [Dimensions: 9,4 x 2,4 x 3 mt. - Weight: 18.000 Kg]
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : PETROJET/P.P.C.
Project: AGROUD STATION - [Egypt]
Supply : TRUKSLOADINGSTATIONFOR45LOADINGSYSTEM[15FORGASOIL,15FORKERO,15FORFUELOIL] [Dimensions: 9,4 x 2,4 x 3 mt. - Weight: 18.000 Kg]
Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : KPO
Project: KARACHAGANAK DEVELOPMENT - [Kazakhistan]
Supply : N°2STEAMBOILERHOUSE&HOTWATERGENERATIONPLANTcomposedof:
N°1 Chemical Injection Dosing, N° 1 Water/Steam Treatment Skid, MCC Panel/Control System N°1 Water Treatment
Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : KPO
Project: KARACHAGANAK DEVELOPMENT - [Kazakhistan]
Supply : N°2STEAMBOILERHOUSE&HOTWATERGENERATIONPLANTcomposedof:
N°1 Chemical Injection Dosing, N° 1 Water/Steam Treatment Skid, MCC Panel/Control System N°1 Water Treatment
Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : KPO
Project: KARACHAGANAK DEVELOPMENT - [Kazakhistan]
Supply : N°2STEAMBOILERHOUSE&HOTWATERGENERATIONPLANTcomposedof:
N°1 Chemical Injection Dosing, N° 1 Water/Steam Treatment Skid, MCC Panel/Control System N°1 Water Treatment
Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : KPO
Project: KARACHAGANAK DEVELOPMENT - [Kazakhistan]
Supply : N°2STEAMBOILERHOUSE&HOTWATERGENERATIONPLANTcomposedof:
N°1 Chemical Injection Dosing, N° 1 Water/Steam Treatment Skid, MCC Panel/Control System, N°1 Water Treatment
Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : QATALUM-SNCLAVALININTERNATIONAL
Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar]
Supply : FUELGASSYSTEMcomposedof:Liquid Separator Skid, Filtration & Metering Skid, Condensate Tank Skid, Gas Heater Skid, Pressure Reduction Skid, Control Panel Shelter
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : QATALUM-SNCLAVALININTERNATIONAL
Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar]
Supply : FUELGASSYSTEM-PRESSUREREDUCTIONSKID [Dimensions: 10,55 x 1,8 x 3,05 mt. - Weight: 8.600 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : QATALUM-SNCLAVALININTERNATIONAL
Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar]
Supply : FUELGASSYSTEM-LIQUIDSEPARATORSKID [Dimensions: 7,5 x 2 x 4,05 mt. - Weight: 9.700 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : QATALUM-SNCLAVALININTERNATIONAL
Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar]
Supply : FUELGASSYSTEM-FILTRATION&METERINGSKID [Dimensions: 9,8 x 2 x 3,5 mt. - Weight: 10.000 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : QATALUM-SNCLAVALININTERNATIONAL
Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar]
Supply : FUELGASSYSTEM-CONDENSATETANKSKID [Dimensions: 4,3 x 2,3 x 3,3 mt. - Weight: 4.700 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : QATALUM-SNCLAVALININTERNATIONAL
Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar]
Supply : FUELGASSYSTEM-GASHEATERSKID [Dimensions: 5,3 x 2,3 x 3,1 mt. - Weight: 5.300 Kg]
Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY
C O N S T R U C T I O NClient : QATALUM-SNCLAVALININTERNATIONAL
Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar]
Supply : FUELGASSYSTEM-CONTROLPANELSHELTER [Dimensions: 5,66 x 2,5 x 2,7 mt. - Weight: 5.350 Kg]
Year: 2008
C O N S T R U C T I O N
MECHANICAL - ELECTRICALINSTRUMENT BULK MATERIALS
ESD Sy
stem
- F&
G Syste
m
SCADA -
DCS Sys
tem
Telemetry
Pipeline
ChristmasTree
ADVANCED
CONTR
OL
Operator Console
Control Network
Controller
Regulatory PID& Logic Control
Plant I/O
ProcessComputer
Gas reduction skid
Inlet Manifold
Wellhead control panel
Gas Filtration skid
Gas meteringskid
Gas Heater skid
Fuel gas skid
Analyzer shelter
Chemicalinjection skid
Corrosion/Inhibitorsolar powered skid
N2 production skid
C O N S T R U C T I O N
MECHANICAL - ELECTRICALINSTRUMENT BULK MATERIALS
DCS & ES
D TMR
ESD Sy
stem
- F&G Sy
stem
SCADA - D
CS Sys
tem
Operator Console
Control Network
Controller
Regulatory PID& Logic Control
Plant I/O
ProcessComputer
Welhead controlpanel
Air/Gas filtration skid
AnalyzerInstrumentation
shelterChemicalinjection skid
Instrument and service gas skid
C O N S T R U C T I O N
MECHANICAL - ELECTRICALINSTRUMENT
BULK MATERIALS
DCS & ES
D TMR
ESD System - F&G System
Operator Console
Control Network
Controller
Regulatory PID& Logic Control
Plant I/O
ProcessComputer
Gas metering skid
Analyzer shelter
Chemicalinjection skid
Chemicalinjection skid
Gas treatmentskid
Air/Gas filtration skid
C O N S T R U C T I O N
SCADA -
DCS Sys
tem
ESD Sy
stem
- F&
G Syste
m
Gas metering skidHypochlorite skidChemical feed system & control
Sample conditioning system & analysis
Sample conditioning system & analysis
MECHANICAL - ELECTRICALINSTRUMENT BULK MATERIALS
NH3 Injection skid
Gas Analysis skid
Stack GasAnalysis
CONSTRUCTIONDIVISION
Skids & Packages,EPC Contractors
References
REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT
CUSTOMER END USER PROJECT DESCRIPTION YEAR
ENI TUNISIA BVPDG e KARMATUNISIE
Manifold Skids Dim. LxW xH KARMA 7,5 x 2,5 x 3,6 m PDG 10,2 x 2,5 x 2 mWeight: KARMA ~17.000 Kg - PDG ~22.000 KgOil Flow Rate: PDG 1.500 bbl/day KARMA 3.000 bl/day
2010
ENPPINew land Oil Treatment TrainEGYPT
Nitrogen Generator PackageDim. LxWxH 5,9 x 2,5 x 2 mWeight: ~2000 KgN2 Production: 200 Nm3/h 6 barg
2010
NUOVO PIGNONE
NUOVO PIGNONE
BAGHDAD CO. FORGAS TURBINE INC.
“TURN KEY JOB”Supply of 2 Fuel Gas Scrubber SkidsDimension 3,6 x 2,2 x 3,85 mWeight: 4.500 kg
2009
EMCEGYPT SWGEZONSHORE FACILITY
“TURN KEY JOB”Supply of 1 air compressor PackageDimension: 6,3 x 4,2 x 3,86 m - Weight: 8.100 kgSupply of 1 Chemical Injection SkidDimension: 1,2 x 0,9 x 1,5 m - Weight: 500 kg
2009
ENPPIEGYPT PFSE 2 BISDEV. PROJECT
1 Methanol Injection SkidDimension: 1,5 x1 x1 mWeight: 400 kg
2009
EMCQARUN
PETROLEUMCOMPANY
EGYPT KARAMAPOWER PLANT
1 Air Compressor PackageDimension: 10 x 5 x 5,54 mWeight: 37.000 kg
2009
ENPPIVENEZUELAPAGMI PROJECT
1 Nitrogen Supply PackageDimension: 10 x 6 x 10,55Weight: 20.000(This job is in development)
2009
NUOVO PIGNONECENTRALEIDROGENO ENELFUSINA VENEZIA
2 Fuel Gas Treatment SkidDimension: 3,4 x 1,5 x 2,4 mWeight: 3.000 kg
2009
NUOVO PIGNONEALGERIASKIKDA LNG
5 Fuel Gas TreatmentSkidDimension: 4 x 2,5 x 3,6 mWeight: 6.600 kg
2009
KPOKARACHAGANAK DEVELOPMENTPROJECT
1 deg/Water Fired Heater PackageDimension: 14 x 8,5 x 3,1 m(This job is in development)
2009
ENPPI
POLYSTYRENE PROJECTAL - DEKHILAH,ALEXANDRIA
5 Chemical Injection Dimension: 10 x 4 x 2,4 m1 Fire Water Sodium Hypochloryte Injection PackageDimension: 3 x 2,2 x 3,2 m - Weight: 3.500 1 Cooling Tower Chemical Injection PackageDimension: 10 x 4 x 3,8 m - Weight: 10.000 kg
2009
ENPPIVENEZUELAPAGMI PROJECT
2 Gas Metering SkidDimension: 16,8 x 3,6 x 3 mWeight: 52.000 Kg
2009
CUSTOMER END USER PROJECT DESCRIPTION YEAR
ENPPIEGYPT EL GAMILUPGRADINGPROJECT
2 Chemical Injection SkidDimension: 19,6 x 3,2 x 2,7 m (Port Fouad)Dimension: 13,4 x 3,2x 2,7 m (Denise)Weight: 44.150 kg (Port Fouad)Weight: 36.000kg (Denise)
2009
EMC EGYPT SWGEZ-21 Gas Filter Skid PackageDimension: 1,5 x 1 x 2 mWeight: 700 kg
2008
EMCEGYPT SWGEZ-2PLATFORM
Chemical Injection SkidDimension: 12 x 0,9 x 2,4 mWeight: 1.700 kg
2008
AMERYAPETROLEUMREFINARY Co.
AMERYAPETROLEUMREFINARY Co.
APRC’S NITROGENPLANTEGYPT
“TURN KEY JOB”Supply of One Adsorption UnitDimensions: 4 x 2 x 2,5 m.Weight: 4000 Kg
2008
BROWN &ROOT - CONDOR
CENTRE SATELLITEROMALGERIA
“TURN KEY JOB”Supply of Fire Water Pumps SkidsDimensions 1,6 x 3 x 2,5 mWeight 14.000 kg
2008
PETROJET PPC (EGYPT)
HBA/2006 LPGPIPELINE FROMDELTA TO MOSTOROD
“TURN KEY JOB” Supply of Pressure reduction & Metering Station. Dimensions for Reduction skid 10,5 x 2,6 x 3,5 m - Weight 17.000 kgDimensions for Metering skid 9 x 1,2 x 1,5 mWeight 4200 kg
2008
NUOVO PIGNONE SCOPNAJAF PS3IRAQ
“TURN KEY JOB”Supply of 1 Indirect Water Bath Gas HeaterDimensions 9,8 x 2 x 2,5 m - Weight:14.000 kg
2008
SNC LAVALINQATALUMALUMINIUMPLANT
“TURN KEY JOB”Supply of 1 Fuel Gas Treatment Package andinterconnecting site installation.Scrubber SkidDimensions: 3,6 x 1,5 x 2,5 m - Weight: 2500 kgFiltration & Metering Skid:Dimensions: 8,6 x 1,4 x 3 m - Weight: 5500 kgPressure Reducing Station Skid:Dimensions: 7 x 1,5 x 1,5 m - Weight: 4000 kgFuel Gas Condensate Tank Skid:Dimensions: 4 x 0,5 x 2,5 m - Weight: 4000 kg
2008/2009
NUOVO PIGNONESHELL PEARL GTLPROJECTQATAR
“TURN KEY JOB”Supply of 6 Nitrogen Purge SkidsDimensions: 2,6 x1,5 x 2 mWeight: 2000 kg each
2008
NUOVO PIGNONEDAS ISLANDPROJECTOAG
“TURN KEY JOB”Supply of 2 Fuel Gas Treatment SkidDimensions: 8 x 3 x 4,3 mWeight: Kg 12.000
2008
NUOVO PIGNONESHELL PEARL GTLPROJECTQATAR
“TURN KEY JOB”Supply of 6 NG + 6 HOG Fuel Gas Scrubber Skids NG: Dimensions: 3,20 x 2,15 x 3,8 - Weight: 3000 kg each HOG: Dimensions: 4,10 x 2,45 x 4; Weight: -4300 kg each
2007
REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT
CUSTOMER END USER PROJECT DESCRIPTION YEAR
NUOVO PIGNONERAS LAFFAN/QATARGAS III -TRAIN 7
“TURN KEY JOB”Supply of 2 Fuel Gas Treatment SkidsDimensions: 3,2 x 2,3 x 3,6 mWeight 4500 kg each
2007
NUOVO PIGNONE WGTE II CHINAWEST EASTPIPELINE FLOW INCREASED PROJ.
“TURN KEY JOB”Supply of 6 Fuel Gas Conditioning SkidDimensions 1,8 x 4,2 x 3 m - Weight 3520 kg
2007
TECHNIPHDS VII PLANT POLAND
“TURN KEY JOB”Supply of 2 Chemical Dosing SystemsDimensions: 3 x 2 x 3,64 eachWeight: Kg 2.200 each
2007
EDISON COLLALTO PLANT
“TURN KEY JOB”. Supply of 1 Analyzer Shelter & 1Metering Skid & 1 Filtering Skid.Analyzer Dimensions: 3 x 2,5 x 2,7m; Weight: 15 000 kg Metering Skid Dim.: 19 x 3,7 x 2m; Weight: 25 000 kg Filtering Skid Dim.: 9,7 x 3,2 x 3m; Weight: 24 000 kg
2007
EDISON COLLALTO PLANT
“TURN KEY JOB”Supply of 7 MEG Dosing SystemsDimensions7,2 x 2,75 x 4 m eachWeight: Kg 8800 each
2007
ENPPIDENIS “ A” FIELDDEVELOPMENTEGYPT
“TURN KEY JOB”Supply of 1 Corrosion Inhibitor skidDimensions: 4 x 3,3 x 3 m eachWeight: Kg 4000
2007
ENPPI NOSPCOONS DEVELOPMENTPROJECTEGYPT
“TURN KEY JOB”Supply of 1 Fuel Gas Conditioning PackageDimensions: 2,8 x 6 x 4 mWeight 7.000 kg.
2007
BROWN & ROOT -CONDOR
CENTRESATELLITE ROMALGERIA
“TURN KEY JOB”Supply of Inlet Manifold UnitDimensions: 20 x 7 x 2.6 mWeight: Kg 80.000
2007
NUOVO PIGNONEBLNG POWERPROJECTBRUNEI
“TURN KEY JOB”Supply of 1 Fuel Gas Scrubber SkidDimensions: 3 x 1,6 x 4,1 mWeight: Kg 3.600
2007
NUOVO PIGNONEASABDEVELOPMENTPHASE II
“TURN KEY JOB”Supply of 2 Seal Gas SkidDimensions: 1,2 x 3,5 x 2,6 mWeight: Kg 2000
2007
NUOVO PIGNONEPOWER PLANT 3YARA SLUISKILNETHERLANDS
“TURN KEY JOB”Supply of 1 Fuel Gas SystemDimensions: 5 x 3 x 4 mWeight: 12.000 kg
2007
ENPPI
HA’PY PRODUCTIONINCREASED 3RDPROJECTEGYPT
“TURN KEY JOB”Supply of 1 Glycol Injection PackageDimensions: 9 x 2,6 x 2,8 mWeight: Kg 9.000
2006
REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT
CUSTOMER END USER PROJECT DESCRIPTION YEAR
ENPPIONS DEVELOPMENTPROJECTEGYPT
“TURN KEY JOB”Supply of 1 Chemical Injection System
2006
NUOVO PIGNONELNG RAS LAFFAN -QATAR GAS 3TRAIN 7
“TURN KEY JOB”Supply of 3 Seal Gas SkidsDimensions: 2,3 x 9,4 x 4 eachWeight: Kg 6000 each
2006
NUOVO PIGNONELNG RAS LAFFAN -QATAR GAS 3TRAIN 6
“TURN KEY JOB”Supply of 3 Seal Gas SkidsDimensions: 2,3x 9,4 x 4 m eachWeight: Kg 6000 each
2006
NUOVO PIGNONECOVE POINTU.S.A.
“TURN KEY JOB”Supply of 2 Fuel Gas Treatment SkidDimensions: 2,6 x 1,7 x 3,8 mWeight: Kg 3.500
2006
KBR
SAQQARA FIELDDEVELOPMENT PROJECTEGYPT
“TURN KEY JOB”Supply of 1 Chemical Injection SystemDimensions: 16 x 3,5 x 4 m - Weight: Kg 23000
2006
KBR
SAQQARA FIELDDEVELOPMENT PROJECTEGYPT
“TURN KEY JOB”Supply of 1 PSA Nitrogen Generation PackageDimensions: 7,5 x 2,3 x 2,8 mWeight: Kg 10.000
2006
ENPPIDENIS FIELDDEVELOPMENTEGYPT
“TURN KEY JOB”Supply of 4 Chemical Injection SkidsDimensions: 4 x 3,5 x 3 m eachWeight: Kg 4.500
2006
KPOKARACHAGANAKDEVELOPMENTPROJECT
“TURN KEY JOB”Supply of 1 LP Closed Drain VesselsL :14,7 m; Ø:3.6 m - Weight: 39.000 kg
2006
NUOVO PIGNONE WGTE II CHINA
WEST EASTPIPELINE FLOW INCREASEDPROJ.
“TURN KEY JOB”Supply of 16 Fuel Gas Conditioning SkidDimensions 1,8 x 4,2 x 3 m; Weight 3520 kg
2006
NUOVO PIGNONERAS LAFFAN - QATARGAS II - TRAIN 5
“TURN KEY JOB”.Supply of 3 Seal Gas SkidsDimensions: 2,3x 9,4 x 4 m eachWeight: Kg 6.000 each
2006
NUOVO PIGNONERAS LAFFANQATARGAS II - TRAIN 4
“TURN KEY JOB”Supply of 3 Seal Gas SkidsDimensions: 2,3x 9,4 x 4 m eachWeight: Kg 6.000 each
2005
ENPPI
TEMSAH NORTHWEST PLATFORMPROJECTEGYPT
“TURN KEY JOB”Supply of n. 7 Chemical Injection Skids(Methanol, Glycol and Chemical injection skids)Dimensions: 5 x 2,8 x 4 m each - Weight: Kg 5.000
2005
REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT
CUSTOMER END USER PROJECT DESCRIPTION YEAR
ENPPI
TEMSAH NORTHWEST PLATFORMPROJECTEGYPT
“TURN KEY JOB”.Supply of New One Instrument & Service Gas Skid(ext. dim. 7 x 3,2 x 5,2 m.).
2005
ENI DIV. E&PVAL D’AGRI RETEDI RACCOLTA
“TURN KEY JOB”Supply of n 12 chemical injection skidsDimensions: 3,2 x 2,4 x 2 eachWeight: Kg 3.000
2005
NUOVO PIGNONESOUTH PARSASSALUYEHIRAN
“TURN KEY JOB”Supply of 9 fuel gas skidsDimensions: 6,8 x 2,5 x 4 eachWeight: Kg 15.000 each
2005
KPOKARACHAGANAKDEVELOPMENTPROJECT
“TURN KEY JOB”Supply of Spent Caustic Neutralization SkidDimensions 2.5 x 1 x 2.8 mWeight 550 kg
2005
KPOKARACHAGANAKDEVELOPMENTPROJECT
“TURN KEY JOB”Supply of Nitrogen Purification PackageDimensions: 2.5 x 1 x 2.8 mWeight 1.500 kg
2004
NUOVO PIGNONEHASSI R’MELALGERIA
“TURN KEY JOB”Supply of one fuel gas skidDimensions: 3 x 12 x 4,3 mWeight: Kg 28.000
2004
PETROJETBASANDILA, SHATTA& TALKHA PROJECT
“TURN KEY JOB”Supply of new 3 LPG Receiving Skids
2004
ENPPITEMSAH - 4PLATFORMPROJECT
TURN KEY JOB”Supply of new one instrument & service gas skids(ext. dim. 7 x 3,2 x 5,2 m.).
2004
ENPPI
RASHID - 2PLATFORM AND SEA LINE TO P - 1EGYPT
“TURN KEY JOB”Supply of n. 3 chemical injection skids (methanol, glycol and chemical injection skids)Dimensions: 5,3 x 2 x 4,6 m eachWeight: Kg 7.500 each
2004
ENPPITEMSAH - 4PLATFORM PROJECTEGYPT
“TURN KEY JOB” Supply of n. 7 chemical injection skids (methanol, glycol and chemical injection skids) Dimensions: 5 x 2,8 x 4 m each
2004
UOPGREENGASMANTOVA
6 PSA Greengas PolybedDimensions: 26 x 3,5 x 2,5 m
2003
MEIS SCOPAL ANBARPOWER STATION(IRAQ)
“TURN KEY JOB”Supply of Oil metering skidDimensions: 2,5 x 6,5 x 2,7 mWeight:10.000 Kg
2003
REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT
CUSTOMER END USER PROJECT DESCRIPTION YEAR
MEIS SCOPYOUSFYIAPOWER STATIONIRAQ
“TURN KEY JOB”Supply of Oil metering skidDimensions: 2,5 x 6,5 x 2,7 mWeight 10.000 Kg
2003
NUOVO PIGNONE GREENSTREAM
MELLITAH GASCOMPRESSIONSTATIONLYBIA
“TURN KEY JOB”Supply of N. 3 fuel gas heater skidsDimensions: 2 x 7,5 x 7 mWeight 6.000 Kg
2003
PETROBELRPP PLATFORMEGYPT
“TURN KEY JOB”Supply of instrument and service gas skidDimensions: 2 x 5 x 4,5 mWeight: 7.500 Kg
2003
PETROBELPFD & RPPPLATFORMEGYPT
“TURN KEY JOB”Supply of n. 5 chemical injection skids(methanol, glycol and chemical injection skids)
2003
PETROBELPFD PLATFORM EGYPT
“TURN KEY JOB”Supply of instrument and service gas skidDimensions: 2 x 5 x 4,5 mWeight: 7.500 Kg
2003
SAIPEM
NAOC
IRRI FLOWSTATION PROJECTNIGERIA
“TURN KEY JOB”for execution of nitrogen generator package- N° 1 Compressor and Air treatment skid Dim. 2,2 x 6 x 3,5 m - Weight 5.800 Kg- N° 1 Nitrogen Vessel- N° 1 Membrane skid Dim. 1 x 1,5 x 2 m - Weight 600 Kg
2003
KPOKARACHAGANAKDEVELOPMENTPROJECT
“TURN KEY JOB”Supply of Water Steam Plant 6t/h + skids
2003
NUOVO PIGNONE
(EGYPT)
ROSETTA FIELDEGYPT
“TURN KEY JOB”Supply of one fuel gas treatment skid.Dimensions: 4,2 x 2,6 x 4,2 mWeight: 6.500 Kg
2002
SAIPEM
NAOC
OBIAFU/ OBRIKOMPLANT WORKS & IRRIFLOWSTATIONS -NIGERIA
“TURN KEY JOB”Supply of one chemical injection skid.Dimensions: 4 x 2,5 x 2,8 m.Weight: 2.500 Kg
2002
ERG PETROLIISAB REFINERY(Priolo ITALY)
“TURN KEY JOB”Supply of four new GPL treatment skidsDimensions: 6,8 x 2,5 x 4m eachWeight: Kg 15.000 each
2002
ENI DIV. AGIP
VIGGIANO (PZ)
CENTRO OLIO“TURN KEY JOB”Supply of four chemical injection skids(each ext. dim. 4 x 2,5 x 3,5 m.)
2002
PETROJET PPC(EGYPT)
AGROUD
“TURN KEY JOB”Supply of two pressure control skids for liquidhydrocarbons products (each ext dim.9.4 x 2.4 x 3 m.)Weight: 18.000 Kg
2002
REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT
CUSTOMER END USER PROJECT DESCRIPTION YEAR
HYUNDAIENGINEERING& CONSTRUCTIONCOMPANY
ATTAHADDYGAS FIELDDEVELOPMENT, LIBYA
“TURN KEY JOB”N° 3 Corrosion Inhibitor Injection SkidsDimensions: 3 x 2 x 3 m/eachWeight: Kg 3.000
2001
ISA MANNAI/ IMAD
ABHA BULK PLANT Disinfectant Injection System 2001
HYUNDAIENGINEERING& CONSTRUCTIONCOMPANY
ATTAHADDYGAS FIELDDEVELOPMENT,LIBYA
“TURN KEY JOB”N° 25 Corrosion Inhibitor Injection SkidsDimmensions: 3 x 2 x 3 m/ eachWeight: Kg 3.000
2001
HYUNDAIENGINEERING& CONSTRUCTIONCOMPANY
ATTAHADDYGAS FIELDDEVELOPMENT,LIBYA
“TURN KEY JOB”N° 8 Chemical Injection SkidsDimensions: 3 x 2 x 2,5 m/ eachWeight: Kg 2.200
2001
PETROFACINTERNATIONAL
UNITY WATERINJECTION. PROJECTPHASE 1-SUDAN
“TURN KEY JOB”Supply of new two chemical injection skids(each ext. dim. 5,65 x 2,55 x 2,30 m)
2001
ENI DIV. AGIP
VIGGIANO (PZ)
CENTRO OLIO“TURN KEY JOB”Supply of new four chemical injection skids(each ext. dim. 4 x 2,5 x 3,5 m)
2000
PETROBEL
TEMSAH PROJ. (EGYPT)
EL GAMILGAS TREATMENTPLANTEGYPT
“TURN KEY JOB”Supply of one new gas metering skid(ext. dim. 13 x 5,1 x 4,5 m)
2000
PETROBEL
TEMSAH PROJ. (EGYPT)
EL GAMILGAS TREATMENTPLANTEGYPT
“TURN KEY JOB”Supply of one new fuel gas skid(ext. dim. 8 x 3,2 x 4,4 m)
2000
PETROBEL
TEMSAH PROJ. (EGYPT)
EL GAMILGAS TREATMENTPLANTEGYPT
“TURN KEY JOB”Supply of new three glycol injection skids(ext. dim.: 9 x 3,2 x 3,2 m.; 6 x 3,1 x 3,2 m.; 4,3 x 2,5 x 2,8 m)
2000
PETROBEL
TEMSAH PROJ. (EGYPT)
NORTH WESTGAS PLATFORMEGYPT
“TURN KEY JOB”Supply of new one instrument & service gas skids(ext. dim. 7 x 3,2 x 5,2 m)
2000
ENI DIV. AGIP
VIGGIANO (PZ)
CENTRO OLIO“TURN KEY JOB”Supply of new four chemical injection skids(each ext. dim. 4 x 2,5 x 3,5 m)
2000
PETROBEL
BALTIM (EGYPT)
BALTIM EAST PROJ.GAS PLATFORM
“TURN KEY JOB”Supply of new one instrument and service gas skid(ext. dim. 4 x 2 x 4 m)
1999
REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT
CUSTOMER END USER PROJECT DESCRIPTION YEAR
PETROBEL
BALTIM EL QARA (EGYPT)
BALTIM EL QARAPROJ.GAS ON SHORE
“TURN KEY JOB”Supply of new three glycol injection skids(each ext. dim. 4 x 2,5 x 3 m).
1999
GUPCOHA’PY PROJ.GAS TREATMENT EGYPT
“TURN KEY JOB”Supply of new one gas and liquid metering skid(ext. dim. 10,7 x 5 x 3,3 m) design for:q.ty 3 + 1 spare metering line by 14” andq.ty 2 headers by 24” 900 RJ.
1999
GUPCOHA’PY PROJ.GAS TREATMENT EGYPT
“TURN KEY JOB”Supply of new one air treatment skid composed by:- q.ty 1 air compressors skid (ext. dim. 6 x 1,5 x 2 m);- q.ty 1 instrument and service air treatment
1999
INTERMARE SARDA
CLARA COMPLEXGAS PLATFORM
“TURN KEY JOB”Supply of new two glycol injection skids(each ext. dim. 2 x 2,5 x 2 ,m )
1999
SARAS S.p.A.Raffinerie Sarde
SARROCHN° 3 Oxygen Control Skid(ext. dim. 5,9 x 0,9 x 2,1 m - Weight : 2.000 Kg.)
1999
ENI DIV. AGIP
VIGGIANO (PZ)
CENTRO OLIO“TURN KEY JOB”Supply of new two chemical injection skids(each ext. dim. 4 x 2,5 x 3,5 m)
1999
ENI DIV. AGIP
VIGGIANO (PZ)
CENTRO OLIO“TURN KEY JOB”Supply of new twelve chemical and injection skids(each ext. dim. 4 x 2,5 x 3,5 m)
1998
PETROBELDARFEEL PROJ. GASPLATFORMEGYPT
“TURN KEY JOB”Supply of new one instrument and service gas skid(ext. dim. 4 x 2 x 4 m) and new one chemicals injection skid (ext. dim. 6,5 x 2,5 x 3 m)
1998
PETROBELPORT FOUAD PROJ.GAS ON SHORE
“TURN KEY JOB”Supply of new one air treatment skid composed by:N°1 air compressors skid (ext. dim. 6 x 1,5 x 2m); N°1 instrument and service air treatment (ext. dim. 4 x 2 x 4m); N°1 air surge drum having capacity about 30 m3.
1997
PETROBEL
ABU DHABI
ABU MADI PROJ. GAS ON SHORE
“TURN KEY JOB”Supply of new two corrosion inhibitor injection skids(each ext. dim. 3 x 2 x 2 m)
1997
AGIP
RAVENNA (RA)
ANEMONE CLUSTERPLATFORM
“TURN KEY JOB”Supply of new one fuel gas treatment control unit
1997
CHEMIT
RECHERCHES CONGO
LOANGO DP1PLATFORM
“TURN KEY JOB”Supply of new three water service treatment skids
1995
REFERENCES:SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT
SERVICE DIVISIONTHE VENDOR SPECIALIST
ECISGROUP Service Division was originally set up to guarantee the putting into operation of its proprietary production systems and has grown and developed more and more up to becoming an organized multi-services structure able to face typical “on field” after-sales problems:
- Mechanical completion- Pre-commissioning- Commissioning- Start-up- Training- Maintenance- Spare parts - Modernization- Revamping (of proprietary and third parties systems)
Our Service Division introduces itself to Customers as a Vendor Specialist proud of:
its long experience covering many fields in the development of equipment and typical systems in the Oil & Gas, Refinery, Power Generation areas;
its knowledge of problems arising in production processes and on site;
its expertise on the professional utilization of equipment.
THE REASONS FOR A MAINTENANCE CONTRACT
The reasons for carrying out regular maintenance operations on a plant are to:
A keep all its components constantly efficient, so as to guarantee the nominal performance for which it has been designed
B reduce to the least all stops for failure, eliminating in advance typical critical events which may occur
C verify in advance plant and structures safety systems efficiency for workers protection during simulation of emergency situations
A maintenance contract allows to avail of a qualified partner able to intervene within the agreed time when a plant suddenly stops to recover the proper operation of the same.
A periodical maintenance of a plant eliminates or reduces the unforeseeable costs to be borne when production is stopped in favor of a reduced cost, thus guaranteeing plants efficient operation and long life.
OUR SERVICE DIVISION YOUR RELIABLE PARTNER
PROFICIENCY:
– Direct and highly qualified knowledge of its proprietary plants/systems– Top level technical-managerial and industrial culture. The staff consists of engineers and technicians who have acquired a specific proficiency in the main fields and sectors: systems, electrical, electronic, automation, IT, carpentry mechanical structures, fluidic mechanics– Capability to understand and manage non proprietary plants similar to its own as to type, components, logics and criteria
EXPERIENCE:
– Years of technical experience applied to problem solving in the electrical, instrumental, pneumatic - fluidic, automation, Oil & Gas, refinery, power generation fields– Knowledge of peculiar aspects of oil extraction and production sites located abroad (Middle East, Africa, Northern Europe, map with location of sites)
WE KNOW WHERETHE PROBLEM ISAND HOW TOSOLVE IT
WE HAVETHEMATERIALS
MATERIALS PROCUREMENT NETWORK:
An important unit of Ecisgroup is specialized in the commercialization of specific electrical and mechanical materials, it is in charge of procurement for the whole Group having a preferential relationship with suppliers who guarantee top reliability and best quality/price ratio, found in the vendors lists of the most prestigious engineering companies
STRUCTURE:
Ecisgroup avails itself of a specific Service Division made up of managers and qualified technicians, devoted to satisfy customers requirements for any after-sales problem. The technical staff is trained to operate in any operating condition (onshore, offshore, hazardous areas, sensible areas).
CONTINUITY:
Non - stop operation of its own plants, followed up in the commissioning and start-up stage. Maintenance activity takes advantage of historical experience of plants, limiting intervention times and assuring a precise intervention.
WE HAVETHE PEOPLE
SCHEDULED MAINTENANCE
PERIODICAL
1. Study of the plant to sort out critical elements
2. (if applicable) definition of most significant parameters to be detected on field and periodically notified to Ecisgroup – Service Dept. for a remote monitoring of plant performance
3 Definition of an ordinary maintenance program: list of maintenance activities and timing
UPON STOP
4. Definition of maintenance program on scheduled stop: verification of components which are accessible only upon plant standstill.
Definition/Management of spare parts stock necessary for scheduled maintenance. Spare parts which are more critical to be found or which are more subject to wearing or rupture.
EXTRAORDINARY MAINTENANCE(upon request)
EMERGENCY
5. On the occurrence of a sudden and unforeseen failure Ecisgroup Service Division effects emergency interventions within max pre-fixed time, assuring stock of critical materials for each specific application necessary for intervention.
6. For top critical plants Ecisgroup Service Division guarantees 24/24 hrs non stop assistance.
MODERNIZATION & BULLDOZING
IMPROVE YOUR PERFORMANCE THROUGH ECISGROUP CARE
- Detecting actual situation on site
- Developing detailed engineering
- Developing HW & SW design
- Replacing the obsolete plant with a new one
- Turnkey plant after Commissionig, Sat, Start Up
POWER GENERATIONsite
REFINERYsite
CONTROL ROOMsite
OIL&GASsite
WORKFORCE
20 Supervising Service Engineers
2 Million turnover in Service Activities
More than 25 Maintenance open contracts for:
- DCS- ESD - F&G- SCADA- FIELD EQUIPMENT- ANALYSIS SHELTERS- CEMS- WHCP- SKID - PACKAGES- GAS FILTRATION SKID- GAS METERING SKID- GAS HEATER SKID
- GAS REDUCING SKID- GAS ODORIZER SKID- LAUNCHING AND RECEIVING TRAP- MANIFOLD SKID- CHEMICAL INJECTION- INSTRUMENT AND SERVICE AIR PACKAGE- NITROGEN PRODUCTION PACKAGE- TRUCKS AND RAIL TANKERS LOAD ING SYSTEM- WATER TREATMENT PACKAGE
S E R V I C EDIVISION
References
REFERENCES: SERVICE DIVISION
CUSTOMER END USER PROJECT DESCRIPTION YEAR
KPOBOILER HOUSEKAZAKHISTAN
Water treatment and boilers commissioning,start up & training
2009
KPOBOILER HOUSEKAZAKHISTAN
Heat exchanger Skids:Commissioning, start up and training
2009
LAVALINALLUMINIUM PLANT QATAR
Gas treatment skids: commissioning start up & training 2009
LAVALINALLUMINIUM PLANT QATAR
Automation: commissioning & training 2009
SAIPEMQATOFIN LLDPE PLANT QATAR
Analysis shelter commissioning & start up 2009
WECO AM. COAMREYA REFINERY EGYPT
Air drier skid commissioning & start up 2009
SAIPEMON-SHORE GASSTATION
Maintenance for CEM panels - 4 sites(Casalborsetti, Fano, Trecate, Sabbioncello)
2008
CTJVQGX PROJECT - QATAR
Whcp: commissioning & start up 2008
CTJVQGV PROJECT - QATAR
Whcp: commissioning, start up & training andrevamping
2008
GUPCOSAQQARA REFINERY EGYPT
Nitrogen generation skid Training 2008
GUPCOSAQQARA REFINERY EGYPT
Chemical injection skid training 2008
NOSPCOOFF SHORE: PLAT-FORM TAO 93-t EGYPT
Whcp commissioning, start up and training 2008
REFERENCES: SERVICE DIVISION
CUSTOMER END USER PROJECT DESCRIPTION YEAR
NOSPCOOFF SHORE:PLATFORM TAO 93-t EGYPT
Chemical injection skid training 2008
GUPCOHA’PY PRODUCTION INCREASE 3D LST EGYPT
Chemical injection skid commissioning 2008
PETROBEL
OFF-SHOREGAS PLATFORM TEMSAH NW2EGYPT
Whcp revamping 2008
PETROBEL
OFF-SHORE GAS PLATFORM TEMSAH NW2EGYPT
Whcp Denise commissioning & start up 2008
TECNIMONT
RAS LAFFANLDPE / HDPE PLANTSAUDI ARABIA
Analysis shelters commissioning & start up - 4 shelters 2008
PETROJET PPCGAS RECEIVINGSTATIONEGYPT
Filtering,pressure reduction,Metering skids commissioning and training - 3 sites
2007
PETROBEL
OFF-SHORE GAS PLATFORM TEMSAH NW2EGYPT
Whcp commissioning & start up 2007
SAIPEM ENERGY SERVICE
GAS STORAGE PLANT /RIPALTA /BRUGHERIO /SERGNANOITALY
Technology Emerson Delta V/RS3 - Maintenance System DCS
2007
KPOBOILER HOUSEKAZAKHISTAN
Automation & Scada:Commissioning, start up and training
2006
SAIPEMOFF-SHORE GASPLATFORMITALY
Maintenance for CEM panels - 2 sites(Garibaldi, Cervia)
2006
ABB E.A.
POWER
POWER PLANTCOMBINED CYCLE /OSTIGLIAITALY
Technology HIMA - Maintenance System ESD 2006
ABB E.A.
POWER
POWER PLANT COMBINED CYCLE/FERRARA - MANTOVA - RAVENNA (ITALY)
Technology HIMA - Maintenance System SDS 2005
REFERENCES: SERVICE DIVISION
CUSTOMER END USER PROJECT DESCRIPTION YEAR
SAIPEM ENERGY SERVICE
GAS STORAGE PLANT /RIPALTA - ITALY
Technology Invensys I/A Series 2005
SAIPEM ENERGY SERVICE
E&P
OFF-SHORE/ON- SHOREC.Le Grottamare, Piatt.Me Barbara T2, Clara Nord, Clara Est, Calpurnia, Emilio, Davide, Fratello, Emma, C.le Casalborsetti, Fano,Spilamberto, Trecate,Piatt.Me Cervia e Angela (ITALY)
Technology HIMA - Maintenance System HIMA 2005
GREENSTREAM
GREENSTREAM
GAS TERMINAL /GELA
System DCS/RTP/ESD Triconex/System F&G e Field Equipment
2005
SAIPEM ENERGY SERVICE
E&PTRECATE OIL CENTERITALY
Technology MOORE - Maintenance System DCS 2004
PRODUCTLIST
Oil & Gas
Oi l & Gas
A - SKIDS
1 Fuel Gas Treatment Skids (ESD, Filtration, Metering, Analysis, Heating, Reducing,)2 Gas Odorizer Skids3 Meter Provers4 Launching and Receiving Traps5 Manifold Skids6 Chemicals Injection Skids (Corrosion, Methanol, Glycol, etc...)
B - PACKAGES
1 Instrument and Service Air Packages2 Water Treatment Packages (primary & secondary water /biological)3 Diesel Oil Package4 Hydrogen Production Package5 Nitrogen Production Package: (Membrane & PSA)6 Trucks And Rail Tankers Arm Loading Systems7 Fire Fighting Packages8 Early Production Facilities (Manifold, Well Test Production, HP & LP Test Separators, Slug Catcher, Oil Stabilizer)9 TEG - MEG Packages10 Dehydration Systems Packages
C - PNEUMO-HYDRAULIC SYSTEMS
1 Wellhead Control Panels2 Electro-pneumatic Control Panels3 Hydraulic Power Units
D - ANALYZER SYSTEMS
1 Analyzer Shelter Packages2 Sampling Conditioning Systems3 Environmental Monitoring Systems (CEMS)
I - SERVICES
1 Engineering2 Commissioning / Start-up3 On site maintenance4 Training
PRODUCTS & SERVICES FOR THE
OIL&GAS INDUSTRY MECHANICAL& CONTROL EQUIPMENT
E - PLC/DCS/F&G/SCADA/SYSTEMS
1 Burner Management Systems (BMS)2 DCS & PLC Hardware3 DCS & PLC Application Software4 Emergency Shutdown Systems (ESD) PLC Based5 Safety Plc TÜV Certified To Sil36 Relay Logic Systems TÜV Certified To Sil4 - HIPPS7 Fire & Gas Detectors8 Fire & Gas Monitoring and Detection Systems9 RTU and Scada Systems 10 Complete protection systems (sensors + logic solver + final elements) like HIPPS
F - COMPUTER HW & SW
1 Hardware And Software2 Local Area Network Systems3 Personal Computers4 Fiber Optic Networks
G - PANEL
1 Control Panels2 Control Panels For Classified Areas – Pressurized Constructions3 Local Panels4 Marshalling Cabinets5 Marshalling Panels6 Purging / Pressurized Systems For Local Panel
H - TELECOMMUNICATION SYSTEM & SECURITY
1 Building Security System2 CCTV systems
I - SERVICES
5 Configuration of DCS and PLC Systems6 Multivariable Plant Optimization7 Instrument Engineering8 Electrical Engineering9 After Sales Services10 Maintenance Of Control Systems11 SIL Assessment
PRODUCTS & SERVICES FOR THE
OIL&GAS INSTRUMENT ELECTRICAL& AUTOMATION EQUIPMENT
α - INSTRUMENT MECHANICAL BULK MATERIALS
1 Instrumentation Tubing In Coils And Bars2 Pre-Insulated and Pre-Traced Multi-Tubing Bundles3 Double Ferrule Compression Fittings4 Instrument Flanges5 High Pressure Valves, Fittings And Tubing6 Instrument Valves And Manifolds7 Ball And Needle Valves8 Double Block & Bleed Valves9 Monoflange Valves10 Instrument Protection & Heating Boxes/Sunshades11 Seal Chambers, Condensing And Air Distribution Pots12 Engineered Supplies
β - ELECTRICAL BULK MATERIALS FOR HAZARDOUS AREA
1 Conduit Pipes2 Cable Glands and Electrical Fittings IEC / NEC3 Junction Boxes IEC / NEC4 Plugs and Sockets IEC / NEC5 Fluorescent and Floodlight Lighting IEC / NEC6 Electrical Cables7 Cable Protection Systems8 Trefoil Cable Cleats9 Metal / Fiber Glass Cable Trays & Ladders10 Multi Cable Transit Systems11 EExp certified Pressurized Systems / Enclosures12 Control Stations IEC / NEC13 Intrinsic safety (EExia) Solenoid Valves14 Engineered Supply
γ - INSTRUMENT VALVES FOR SEVERE SERVICE
1 Pilot And Changeover Safety Relief Valves2 Triple-Offset Control Butterfly Valves3 Choke And Control Valves
PRODUCTS & SERVICES FOR THE
OIL&GAS BULK MATERIALFOR ERECTION
Oi l & Gas
δ - PIPING VALVES & FLANGES SAVING SOLUTIONS
1 High performance metal to metal valves & flanges a Twinsafe® double block & bleed ball valves b Triple-offset butterfly valves c Cryogenic triple-offset butterfly valves d Double isolate triple-offset butterfly valves e Dual plate check valves f Flanges and clamp connectors
ε - INSTRUMENT VALVES & DEVICES FOR HYDRAULIC & PNEUMATIC SYSTEMS
1 Hydraulic water/glycol and oil pumps2 Pressure intensifiers3 Pressure regulators4 Directional control valves / slide valves5 Safety relief valves6 Quick exhaust valves7 Flowline pilot valves8 Pneumatic/hydraulic/electric pressure switches9 Pneumatic/electric level switches10 Manual reset relays11 Sand probes12 ESD manual valves13 Pneumatic/hydraulic indicators14 Fusible plugs
ζ - ELECTRICAL & STEAM TRACING
1 Basic design of the electrical & heating systems2 Detail design of the electrical & heating systems3 Drawings and typical installation sketches4 Heating cables, self-regulating or constant wattage type5 Pre-traced and pre-insulated multi-tubing systems6 Main low voltage panels7 Local panels8 Junction boxes9 Low voltage cables for feeding and control10 Cable-ways, conduit pipes and cable-trays11 Instrumentation for control and regulation12 Instrument protection and heating boxes13 Instrument tubing in coils14 Engineered supplies
PRODUCTS & SERVICES FOR THE
OIL&GAS BULK MATERIALFOR ERECTION
MULTIDISCIPLINARY ENGINEERING DIVISION
For over 20 years, ECISGROUP Engineering Division has provided Customers
with qualified engineering services and has powered the development of advanced
technology solutions in Control & Safety Systems, Instrumentation, Process Simulation,
Multivariable Control and Optimization Technologies for plant management.
Along with the group’s increasing needs, ECISGROUP Engineering Division with the
implementation of Electrical, Process and Piping engineering depts., has grown to
become a full Multidisciplinary Engineering Business Unit with over 125.000 Man-
Hours/Year Multidisciplinary Engineering Staff
– Project Management Consulting – PMC
– Process
– Mechanical & Piping
– Civil
– Instrumentation & Analysis
– Advanced Control
– Electrical
– Telecommunications
PRODUCTS & SERVICES FOR THE
OIL&GASEPC CONTRACTORS
Oi l & Gas
PRODUCTLIST
Petrochemical
A - SKIDS
1 Gas Reducing Station2 Gas Heater Skids3 Gas Metering Skids4 Gas Treatment Skid5 Chemical injection/Corrosion skids
B - PACKAGES
1 Instrument and service air packages2 Water treatment packages (primary & secondary water /biological)3 Diesel oil package4 Nitrogen production package: Membrane & PSA5 Fire fighting packages6 TEG - MEG Packages7 Dehydration Systems Packages
C - ANALYZERS SYSTEMS
1 Sampling Systems2 Sampling, Conditioning System & Analysis Systems3 Analyzer Cabinet4 Analyzer Shelters
D - SERVICES
1 Engineering2 Commissioning / Start-up3 On site maintenance4 Training
PRODUCTS & SERVICES FOR THE
PETROCHEMICAL INDUSTRY MECHANICAL& CONTROL EQUIPMENT
PETROCHEMICAL
E - PLC/DCS/F&G/SCADA/SYSTEMS
1 Burner Management Systems (BMS)2 DCS & PLC Hardware3 DCS & PLC application Software4 Emergency Shutdown Systems (ESD) PLC based5 Safety PLC TÜV certified to SIL36 Relay logic systems TÜV certified to SIL4 - HIPPS7 Fire & Gas Detectors8 Fire & Gas Monitoring and Detection Systems9 RTU and SCADA systems10 Complete protection systems (sensors + logic solver + final elements) like HIPPS
F - COMPUTER HW & SW
1 Hardware and Software2 Local area network systems3 Personal computers4 Fiber optic networks
G - PANEL
1 Control panels2 Control panels for classified areas - pressurized constructions3 Local panels4 Marshalling cabinets5 Marshalling panels6 Purging / pressurized systems for local panel
H - TELECOMMUNICATION SYSTEM & SECURITY
1 Building security system2 CCTV systems
D - SERVICES
5 Configuration of DCS and PLC Systems6 Multivariable plant optimization7 Instrument Engineering8 Electrical Engineering9 After sales services10 Maintenance of Control Systems11 SIL assessment
PRODUCTS & SERVICES FOR THE
PETROCHEMICAL INSTRUMENT ELECTRICAL& AUTOMATION EQUIPMENT
PRODUCTS & SERVICES FOR THE
PETROCHEMICAL BULK MATERIALFOR ERECTION
α - INSTRUMENT MECHANICAL BULK MATERIALS
1 Instrumentation tubing in coils and bars2 Pre-insulated and pre-traced multi-tubing bundles3 Double ferrule compression fittings4 Instrument flanges5 High pressure valves, fittings and tubing6 Instrument valves and manifolds7 Ball and needle valves8 Double block &bleed valves9 Monoflange valves10 Instrument protection & heating boxes/sunshades11 Seal chambers, condensing and air distribution pots12 Engineered supplies
β - ELECTRICAL BULK MATERIALS FOR HAZARDOUS AREA
1 Conduit Pipes2 Cable Glands and Electrical Fittings IEC / NEC3 Junction Boxes IEC / NEC4 Plugs and Sockets IEC / NEC5 Fluorescent and Floodlight Lighting IEC / NEC6 Electrical Cables7 Cable Protection Systems8 Trefoil Cable Cleats9 Metal / Fiber Glass Cable Trays & Ladders10 Multi Cable Transit Systems11 EExp certified Pressurized Systems / Enclosures12 Control Stations IEC / NEC13 Intrinsic safety (EExia) Solenoid Valves14 Engineered Supply
γ - INSTRUMENT VALVES FOR SEVERE SERVICE
1 Pilot and changeover safety relief valves2 Triple-offset control butterfly valves
PETROCHEMICAL
δ - PIPING VALVES & FLANGES SAVING SOLUTIONS
1 High performance metal to metal valves & flanges a Twinsafe® double block & bleed ball valves b Triple-offset butterfly valves c Cryogenic triple-offset butterfly valves d Double isolate triple-offset butterfly valves e Dual plate check valves f Flanges and clamp connectors
ε - ELECTRICAL & STEAM TRACING
1 Basic design of the electrical & heating systems2 Detail design of the electrical & heating systems3 Drawings and typical installation sketches4 Heating cables, self-regulating or constant wattage type5 Pre-traced and pre-insulated multi-tubing systems6 Main low voltage panels7 Local panels8 Junction boxes9 Low voltage cables for feeding and control10 Cable-ways, conduit pipes and cable-trays11 Instrumentation for control and regulation12 Instrument protection and heating boxes13 Instrument tubing in coils14 Engineered supplies
PRODUCTS & SERVICES FOR THE
PETROCHEMICAL BULK MATERIALFOR ERECTION
MULTIDISCIPLINARY ENGINEERING DIVISION
For over 20 years, ECISGROUP Engineering Division has provided Customers
with qualified engineering services and has powered the development of advanced
technology solutions in Control & Safety Systems, Instrumentation, Process Simulation,
Multivariable Control and Optimization Technologies for plant management.
Along with the group’s increasing needs, ECISGROUP Engineering Division with the
implementation of Electrical, Process and Piping engineering depts., has grown to
become a full Multidisciplinary Engineering Business Unit with over 125.000 Man-
Hours/Year Multidisciplinary Engineering Staff
– Project Management Consulting – PMC
– Process
– Mechanical & Piping
– Civil
– Instrumentation & Analysis
– Advanced Control
– Electrical
– Telecommunications
PRODUCTS & SERVICES FOR THE
PETROCHEMICALEPC CONTRACTORS
PETROCHEMICAL
PRODUCTLIST
Power
A - FUEL GAS SYSTEMS CONDITIONING
1 ESD 2 Pre-Filtering3 Metering Station4 Analyzer Systems5 Preheating6 Gas Pressure Reducing Station And Final Filtering For Gas Turbine7 Gas Pressure Reducing Station For Auxiliary Boiler
B - CHEMICAL DOSING SYSTEM FOR WATER-STEAM CYCLE AND WATER
1 Corrosion Inhibitor Package Oxygen Scavenger2 PH Correction Package Ammonia/Hydrazine3 Phosphate Package
C - CHEMICAL DOSING SYSTEM FOR COOLING WATER TOWERS
1 Corrosion Inhibitor Package2 Anti-Scale Package3 Hypo-Chlorite Package4 Sulphuric Acid Package
D - ANALYZER SYSTEMS
1 Environmental Monitoring Systems (CEMS)2 Sampling Conditioning Water System3 Oil In Water Monitoring System4 Gas Analyzer System
E - INSTRUMENT AND SERVICE AIR SYSTEM
1 Air Receivers2 Filter and Dryer Unit Air Receivers
I - SERVICES
1 Engineering2 Commissioning / Start-up3 On site maintenance4 Training
PRODUCTS & SERVICES FOR THE
POWER INDUSTRY MECHANICAL& CONTROL EQUIPMENT
POWER
PRODUCTS & SERVICES FOR THE
POWER INSTRUMENT ELECTRICAL& AUTOMATION EQUIPMENT
F - PLC/DCS/F&G/SCADA/SYSTEMS
1 Burner Management Systems (BMS)2 DCS & PLC Hardware3 DCS & PLC application Software4 Emergency Shutdown Systems (ESD) PLC based5 Safety PLC TÜV certified to SIL36 Relay logic systems TÜV certified to SIL4 - HIPPS7 Fire & Gas Detectors8 Fire & Gas Monitoring and Detection Systems9 RTU and SCADA systems10 Complete protection systems (sensors + logic solver + final elements) like HIPPS
G - COMPUTER HW & SW
1 Hardware and Software2 Local area network systems3 Personal computers4 Fiber optic networks
H - PANEL
1 Control panels2 Control panels for classified areas – pressurized constructions3 Local panels4 Marshalling cabinets5 Marshalling panels6 Purging / pressurized systems for local panel
L - TELECOMMUNICATION SYSTEM & SECURITY
1 Building security system2 CCTV systems
I - SERVICES
5 Configuration of DCS and PLC Systems6 Multivariable plant optimization7 Instrument Engineering8 Electrical Engineering9 After sales services10 Maintenance of Control Systems11 SIL assessment
PRODUCTS & SERVICES FOR THE
POWER BULK MATERIALFOR ERECTION
α - INSTRUMENT MECHANICAL BULK MATERIALS
1 Instrumentation tubing in coils and bars2 Pre-insulated and pre-traced multi-tubing bundles3 Double ferrule compression fittings4 Instrument flanges5 Instrument valves and manifolds6 Ball and needle valves7 Instrument protection & heating boxes/sunshades8 Seal chambers, condensing and air distribution pots9 Engineered supplier
β - ELECTRICAL BULK MATERIALS FOR HAZARDOUS AREA
1 Conduit Pipes2 Cable Glands and Electrical Fittings IEC / NEC3 Junction Boxes IEC / NEC4 Plugs and Sockets IEC / NEC5 Fluorescent and Floodlight Lighting IEC / NEC6 Electrical Cables7 Cable Protection Systems8 Trefoil Cable Cleats9 Metal / Fiber Glass Cable Trays & Ladders10 Multi Cable Transit Systems11 EExp certified Pressurized Systems / Enclosures12 Control Stations IEC / NEC13 Intrinsic safety (EExia) Solenoid Valves14 Engineered supply
γ - INSTRUMENT VALVES FOR SEVERE SERVICE
1 Pilot and changeover safety relief valves2 Triple-offset control butterfly valves
δ - INSTRUMENT AND SERVICE AIR SYSTEM
1 Air Receivers2 Filter and Dryer Unit and Air Receivers
ε - CLOSE CYCLE COOLING WATER SYSTEM (DEMI WATER)
1 Slope Oil System
POWER
ζ - PIPING VALVES & FLANGES SAVING SOLUTIONS
1 High performance metal to metal valves & flanges a Triple-offset butterfly valves b Dual plate check valves
η - ELECTRICAL& STEAM TRACING
1 Basic design of the electrical & heating systems2 Detail design of the electrical & heating systems3 Drawings and typical installation sketches4 Heating cables, self-regulating or constant wattage type5 Pre-traced and pre-insulated multi-tubing systems6 Main low voltage panels7 Local panels8 Junction boxes9 Low voltage cables for feeding and control10 Cable-ways, conduit pipes and cable-trays11 Instrumentation for control and regulation12 Instrument protection and heating boxes13 Instrument tubing in coils14 Engineered supplies
PRODUCTS & SERVICES FOR THE
POWER BULK MATERIALFOR ERECTION
MULTIDISCIPLINARY ENGINEERING DIVISION
For over 20 years, ECISGROUP Engineering Division has provided Customers
with qualified engineering services and has powered the development of advanced
technology solutions in Control & Safety Systems, Instrumentation, Process Simulation,
Multivariable Control and Optimization Technologies for plant management.
Along with the group’s increasing needs, ECISGROUP Engineering Division with the
implementation of Electrical, Process and Piping engineering depts., has grown to
become a full Multidisciplinary Engineering Business Unit with over 125.000 Man-
Hours/Year Multidisciplinary Engineering Staff
– Project Management Consulting – PMC
– Process
– Mechanical & Piping
– Civil
– Instrumentation & Analysis
– Advanced Control
– Electrical
– Telecommunications
PRODUCTS & SERVICES FOR THE
POWEREPC CONTRACTORS
POWER
top related