progress evaluation applying earned value management in the construction of commercial buildings...
Post on 28-Mar-2015
217 Views
Preview:
TRANSCRIPT
Progress Evaluation Applying Earned Value Management in the
Construction of Commercial Buildings
Presented byPlanning & Management Services, Inc
Federal Way, WA (near Seattle)
2
Planning & Management Services, Inc “P&M”
At P&M, we specialize in project delivery and project controls including capital program and project solutions. We are involved in the project delivery from planning throughout design, permitting and construction.
We define, implement and staff Project Management Offices (PMOs), which include Tools and Procedures for Project Controls and Program Management. We provide Scheduling; Cost; Risk and Forensic Claims Management services.
Solutions From A-ZDetermining the client's precise needs is what our skilled consultants do in order to provide flexible, scalable and personalized project delivery solutions which is more than just standard solutions. This ensures a harmonic integration of new technology, people, and processes from A-Z.
Our project controls SQL/VB based proprietary software Myriad supports the owner, contractor and designer with project delivery and project controls.
Who We Are
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Case Study
• This case study focuses on applying “Earned Value” management in the construction of commercial projects
• The project example is based on the Port of Seattle (POS) - Terminal 91 Cruise Ship Building Project (T91)
3
– This $70M project consists of construction of a 144,000 square foot, two-story cruise terminal building supported by augercast piles
– Significant consideration and analysis of scope, schedule, and budget issues was required to determine whether to proceed, and if so, on what basis
– This required comprehensive risk evaluation regarding scope, schedule, and cost issues and a documented recommendation
– The T91 project had significant challenges that had to be managed and coordinated
– The construction was occurring on sites with on-going operations and the budget and schedule was tight
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Case Study - continue
• The construction project was complex with:– tight schedule constraints
– significant structural changes and related delays
– significant delay encountered during project initiation; however completion date did not change
– increased visibility from stakeholders (POS commission, public, media, etc)
– multiple construction contracts
– complex coordination with tenant and move in activities
• This invited several unforeseen constraints and inefficiency impacts that could not be incorporated into contract documents.
4
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Challenge
• When a project schedule is tight it is not unusual that project stakeholders begin asking questions like:
– will the project complete on time
– have you considered ….
– what assumptions have been made in the construction schedule
– are updates to the construction schedule accurate and realistic
• The discussions and explanations become Complex and the Credibility can become questionable - which is every Project Manager’s worst nightmare!
• Provide an accurate picture of project status as well as identify potential problem areas
5
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Solution
• With the complexity of the project and the tight schedule constraints, the level of detail a typical CPM schedule would provide was not sufficient to provide accurate project status.
• At the Port of Seattle we introduced “Earned Value Management” to the construction progress evaluation as the Solution to the Problem.
• The modified approach has shown SIGNIFICANT results in the increased Visibility and Credibility of the Project Controls.
6
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Summary
• Comparison of Planned versus Earned
• Contractor required to provide a resource loaded construction schedule
• Leverage the schedule to determine resource hour distribution– For finish work activities, using the square footage of each room / area determined
the weights to allocate resource hours
– Quantity takeoffs were completed for Architectural, Mechanical, Electrical and Plumbing items. Each item / device / fixture comprised a system represented in the construction schedule as multiple activities
• Method used for tracking progress based on visual inspection of work activity or physical quantities installed
• From this information we were able to provide – accurate progress status on a weekly and monthly basis
– deviation metrics comparing Earned Value and Schedule variances
– extrapolation of project completion as well as completion of intermediate major construction milestones
7
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Highlights
• 144,000 square foot, two-story cruise terminal building
• 119 Rooms / areas tracked
• Greater than 660 activities in the schedule
• Major disciplines involved during interior construction included in the table
8
Discipline
Plumbing - Plumbing RI/Fixtures/Trim
HVAC - HVAC RI/Trim/DDC Control
Electrical
Main Elec Rm Equip/Gear
Substation Wiring/Equip/Gear/Panels
Light Fixtures
Electrical Trim
Elevator
Escalator
Low Voltage System
LV Systems Wiring
Fire Alarm
Security
CCTV Camera
Telephone / Data
Finish
GWB H/T/F
Painting
Finish Flooring – Stain, VCT, & Carpet
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Methodology
• Start from a Resource Loaded Construction Schedule
• Analyze Schedule and Coding Structure
• Determine Distribution Methodology (square foot, per room, zone, area, etc)
• Perform Site Walk
• Leverage the Power of the Database
• Provide Visibility and Credibility from Reporting
9
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Analyze Schedule
• Analyze Schedule and Coding Structure– WBS and activity coding structure will help determine structure for updating
information
• Resource Loaded Construction Schedule– Understand how resource hours are distributed per WBS element as well as
throughout the project lifecycle
0
20,000
40,000
60,000
80,000
100,000
120,000
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
22-O
ct-0
75-
No
v-07
19-N
ov-
073-
Dec
-07
17-D
ec-0
731
-Dec
-07
14-J
an-0
828
-Jan
-08
11-F
eb-0
825
-Feb
-08
10-M
ar-0
824
-Mar
-08
7-A
pr-
0821
-Ap
r-08
5-M
ay-0
819
-May
-08
2-Ju
n-08
16-J
un-0
830
-Jun
-08
14-J
ul-0
828
-Jul
-08
11-A
ug-0
825
-Aug
-08
8-S
ep-0
822
-Sep
-08
6-O
ct-0
820
-Oct
-08
3-N
ov-
0817
-No
v-08
1-D
ec-0
815
-Dec
-08
29-D
ec-0
812
-Jan
-09
26-J
an-0
99-
Feb
-09
23-F
eb-0
99-
Mar
-09
23-M
ar-0
9
WBS L1 WBS L2All Areas/Floors
All Areas/ZonesMilestones & Submittals
MilestonesPre-Construction Submittals & POther SubmittalsKey Long-Lead Submittal/Procure
Sitework / UtilitiesCbs / Changes / Etc.Erosion ControlSitework / UtilitiesSite Improvements
FoundationFoundations / SogsCbs / Changes / Etc.
Structure & ExteriorStructural / FramingExterior
1st Floor Framing, Mep & FinishZones 4 & 5 (Grids 6-9) - Cbp/Cta, Mech/Elec (1)Zone 1 (Grids 1-2) - Crew/Break/Toilets (1)Zones 2 & 3 (Grids 2-6) - Baggage Lay-Down (1)Zone 6 (Grids 9-12) - Entry Lobby
2nd Floor Framing, Mep & FinishZone 1 (Grids 1-2) - Vestibules (2)Zones 2 & 3 (Grids 2-6) - Lobby & Bathrooms (2)Zones 4 & 5 (Grids 6-9) - Ticketing/Services (2)
All Areas/FloorsMilestones & SubmittalsSitework / UtilitiesFoundationStructure & Exterior1st Floor Framing, Mep & Finish2nd Floor Framing, Mep & Finish
10
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Planned Resource Hours
• In this case study updates were made per room. – This will vary depending on the structure of the contractor’s construction schedule
and the logistics of the site walk
• Determine the construction schedule activities associated to each room.
• Calculate the square footage or quantity for each room to determine resource hour allocation.
ROOM CEILING GRID
SF TOTAL SF
% of Total
PLANNED HOURS
145_111 - CTA Storage N 509145_112 - Data N 110145_113 - CTA Badging Y 195 195 5% 10145_114 - CTA Office Y 574 574 16% 30145_116 - Site Sub #2 N 726145_117 - Main Electrical Room N 638145_118 - Mechanical Room N 594145_119 - Telephone N 99145_122 - CBP Screening and Queuing N 11,632145_124 - Triage Lobby N 264145_125 - Unified Secondary Inspection Y 2,451 2,451 68% 130145_127 - Hall (NE) Y 148 148 4% 8145_128 - Security Break Room Y 252 252 7% 13145_129 - Search N 90145_130 - Search N 90145_131 - Lab N 120145_132 - Storage N 88145_133 - Passenger waiting N 328145_134 - CBP Coord. Center N 249145_135 - Interview N 92
Total 3,620 100% 192
Activity ID Activity Description
Planned Hours
09510-145 Ceiling Grid 192
Activity ID Activity Description
Planned Hours
09510-145 Ceiling Grid 192
11
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Track Progress
• Walk the project site• Update the percent complete for each activity or
physical quantities installed per room via a site walk through
• Percentage based on visual inspection of work completed.
• Again, walk the project site…
12
ACT ID ACTIVITY DESCRIPTION
145_
111
- C
TA
S
tora
ge
145_
112
- D
ata
145_
113
- C
TA
B
adgi
ng
145_
114
- C
TA
O
ffic
e
145_
116
- S
ite
Sub
#2
145_
117
- M
ain
Ele
ctric
al R
oom
145_
118
- M
echa
nica
l R
oom
145_
119
- T
elep
hone
145_
122
- C
BP
S
cree
ning
and
Q
ueui
ng
15845-145 HVAC Trim / IRHs, Paddle Fans, Etc. 100% 100% 100% 100% 100% 100% 100% 100% 33%
15950-145 DDC Control Wiring N N 100% 100% 100% 100% 100% N 100%
16200-145 Elec & LV Systems R/I - Walls (E) 100% 100% 100% 100% 100% 100% 100% 100% 100%
16600-145 Light Fixtures 100% 100% 100% 100% 100% 100% 100% 100% 100%
16610-145 Electrical Trim 100% 100% 100% 100% 100% 100% 50% 100% 5%
01900-145 Cover Insp. Compl. (per zone; partial) 100% 100% 100% 100% 100% 100% 100% 100% 100%
16620-145 LV Systems Devices (excl. cameras) 50% 25% 100% 100% 38% 50% 43% 75% 47%
16750-145 LV Systems Wiring (CRXs) 100% 85% 100% 100% 96% 100% 95% 100% 92%
16900-145 Elec & Comm Rooms Equip/Panels/Racks N 100% N N N N N 100% N
01999-145 Clean-up & PCL Pre-Punch 1st Flr/ZONE-4/5 0% 0% 0% 0% 0% 0% 0% 0% 0%
05440-145 MS Framing 100% N 100% 100% 100% 100% 100% N 100%
610000% Backerboard @ Comm/Data Rooms N 100% N N N N N 100% N
07215-145 Insulation 100% 100% 100% 100% 100% 100% 100% 100% 100%
08100-145 HM Frames 100% 100% 100% 100% 100% 100% 100% 100% 100%
08120-145 Doors/Hardware & Interior Glazing (CB#46) 100% 100% 100% 100% 100% 100% 100% 100% N
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Data Crunching
• Leverage the use of the database to crunch the numbers• Progress data input into a database• Data can be structured in a variety of formats to meet the needs of
the audience• Audit data to ensure data quality and integrity increasing visibility and
credibility• Allows for flexibility in future reporting requirements
13
Construction Schedule
Site Walk Update Payroll
DataOther
Systems
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Reporting
• When the updates have been loaded into the database, queries are used to generate reports providing visibility to percent complete per project and area/zones and schedule variances.
14
P3 Schedule: v9138
Physical Walk through: 02/23/09 ~10:00AMA B C D E F G H I J K L M
PMSI Evaluation P3 % Variance Schedule Variance in DaysAREA PLAN Man
HrsEARNED- Man Hrs
% Complete
(=B/A)
Min Start Max Finish DUR (=E-D)
% Complete EARNED Man Hrs =(G*A)
P3 % vs Physical %
(=C-G)
Elapsed Time to
Date (=Walk date -D)
Elapsed Time to Date % (=J/F)
EARNED Days
(=F*G)
Days Behind (=J-L)
MILESTONES & SUBMITTALS 504 120 24% 08/28/07 03/11/09 561 70% 350 -46% 545 97%
SITEWORK / UTILITIES 8,269 8,087 98% 10/10/07 03/06/09 513 99% 8,212 -2% 509 0
FOUNDATION 15,626 15,626 100% 09/25/07 04/28/08 216 100% 15,626 0% 216 0
STRUCTURE & EXTERIOR 28,201 28,099 100% 04/07/08 02/06/09 305 100% 28,201 0% 305 0
ALL AREAS/FLOORS 3,070 2,126 69% 07/23/08 03/09/09 229 89% 2,722 -19% 215 94% 203 12
ZONE 1 (Grids 1-2) - Crew/Break/Toilets (1) 9,802 9,498 97% 06/23/08 02/11/09 233 98% 9,602 -1% 245 105% 228 17
ZONES 2 & 3 (Grids 2-6) - Baggage Lay-Down (1) 3,988 3,728 93% 06/23/08 02/17/09 239 99% 3,968 -6% 245 103% 238 7
ZONES 4 & 5 (Grids 6-9) - CBP/CTA, Mech/Elec (1) 22,103 21,019 95% 06/16/08 02/13/09 242 100% 22,023 -5% 241 0
ZONE 6 (Grids 9-12) - Entry Lobby 4,827 4,499 93% 07/07/08 02/13/09 221 100% 4,807 -6% 220 0
ZONE 1 (Grids 1-2) - Vestibules (2) 2,627 2,563 98% 07/07/08 02/05/09 213 100% 2,619 -2% 212 0
ZONES 2 & 3 (Grids 2-6) - Lobby & Bathrooms (2) 6,039 5,911 98% 07/14/08 02/11/09 212 100% 6,023 -2% 211 0
ZONES 4 & 5 (Grids 6-9) - Ticketing/Services (2) 6,840 6,080 89% 08/25/08 02/23/09 182 93% 6,348 -4% 182 100% 169 13
TOTAL 111,896 107,356 95.9% 08/28/07 03/11/09 561 98.8% 110,500 -2.8% 545 97.1%
INTERIOR (ZONES 1-6) 56,226 53,298 94.8% 06/16/08 02/23/09 252 98.5% 55,389 -3.7% 252 100% 248 4
MILESTONES
December 1, 2008 1,157 1,156 100% 06/16/08 12/01/08 168 100% 1,157 0% 252 150% 168 84
December 15, 2008 244 243 100% 08/25/08 12/15/08 112 100% 244 0% 182 163% 112 70
January 12, 2009 951 951 100% 06/16/08 01/12/09 210 100% 951 0% 252 120% 210 42
January 19, 2009 9,241 8,766 95% 06/16/08 02/25/09 254 100% 9,228 -5% 252 99% 254 -2
Remainder 44,632 42,182 95% 06/16/08 02/25/09 254 98% 43,809 -4% 252 99% 249 3
TOTAL Interior 56,226 53,298 95% 99% 55,389 -4%
Primavera data per 01/30/09
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Reporting
• Another example of the flexibility of the evaluation process used in the case study are the following examples:
– Percent complete per room via a floor plan view
– Percent complete for each discipline such as: “Ceiling Grid” per room (notice rooms without ceiling grids are filled in with grey)
15
60%
60%
57%
100%72%
94
% 97% 74%
74%
96% 78% 79% 85%74%
84%
99%
28% 76% 96%79%
96%99%72%
99%
67%
97%
80%88%99% 100%
95%
95%
59%
78% 56% 90% 88%
95%
55% 51%
60%
60%
43%
60%
90%67%
88%
80
%
67%
67%
43%
62%
74%
75%80%
81%
67%35%
67%
74%
74%
62%
62%
75%
88%
64%
68%
58%
58%
85%96%
60%
60%
64%75%
82% 83%
80%
76% 96% 80% 97% 92%
62%
87%
85%
85%
88%
98%
37%
80% 81%
79%
68%
97%
80%
68%
45%
68%
62%
80%
67%84% 42%
62% 95%56%
60%
60%
57%
100%72%
94
% 97% 74%
74%
96% 78% 79% 85%74%
84%
99%
28% 76% 96%79%
96%99%72%
99%
67%
97%
80%88%99% 100%
95%
95%
59%
78% 56% 90% 88%
95%
55% 51%
60%
60%
43%
60%
90%67%
88%
80
%
67%
67%
43%
62%
74%
75%80%
81%
67%35%
67%
74%
74%
62%
62%
75%
88%
64%
68%
58%
58%
85%96%
60%
60%
64%75%
82% 83%
80%
76% 96% 80% 97% 92%
62%
87%
85%
85%
88%
98%
37%
80% 81%
79%
68%
97%
80%
68%
45%
68%
62%
80%
67%84% 42%
62% 95%56%
N
N
75%
N95%N N 100%
100%
N N 10% 10%100%
N
N
100% N N100%
NN50%
N
N
N
NNN N
100%
100%
100%
N N N N
100%
N N
N
N
N
N
NN
N
N
N
N
N
N
100%
NN
25%
NN
N
100%
100%
N
N
N
N
25%
75%
N
N
100%N
N
N
25%N
N N
N
N N 25% 50% N
N
N
N
N
N
N
100%
75% N
100%
N
N
N
N
100%
N
N
N
NN N
N NN
N
N
75%
N95%N N 100%
100%
N N 10% 10%100%
N
N
100% N N100%
NN50%
N
N
N
NNN N
100%
100%
100%
N N N N
100%
N N
N
N
N
N
NN
N
N
N
N
N
N
100%
NN
25%
NN
N
100%
100%
N
N
N
N
25%
75%
N
N
100%N
N
N
25%N
N N
N
N N 25% 50% N
N
N
N
N
N
N
100%
75% N
100%
N
N
N
N
100%
N
N
N
NN N
N NN
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Reporting
16
• Data is also used to generate S-curve charts comparing construction schedule to Earned Value (EV)
• Percent Complete – Construction schedule• Percent Complete – Earned Value• Variance
104,430 ACT
87,478 (P3)
80,346 (EV)
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
Planned Hours - Total Actual Hours - Total Actual Hours (P3) - Total EV Hours - TOTAL
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Methodology
17
• Project Floor plan
N
N
N
N
N
N
N N
N
N
N
N
N
N
N
N
N
NN N
N NN
N
N
N
N
N
N
N
N
NN
N
N
NN
N N
N
N N N N N
N
N
N
N
N
NN
N
N
N
N
N
N
N
NN
N
NN
N
N
N
N
N
N
N
NNN N
N
N
N
N N N N
N
N N
N
N
N
NNN N N
N
N N N NN
N
N
N N NN
NN
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Methodology
18
• Determine scope
• In this example rooms requiring a ceiling grid were identified
0%
0% 0% 0% 0%0%
0%
0% 0%0%0%
0%0%
0% 0% 0%
0%0%
0%
0% 0%0%
0%
0%0%
0%
0%
0%
0%0%0% 0%
0%
0% 0%
0%
0% 0% 0%0%
0%
0%
0% 0%
0%
0% 0%0% 0% 0% 0% 0%
0%
0%
0%
0%
0%
0%0%
0%
0%
0%
0%
0%0% 0% 0% 0% 0% 0% 0% 0%
0%0%
0%
0%
0%
0%
0%0%0%
0%
0%0%
0%0%
0%0% 0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%0%
0%
0%
0%
0%
N N 0% 0%0%
N
N N0%0%
N0%N N 0%
NN
N
N
N0%
N
0%N
N
N
N
NNN N
0%
N N
0%
0% N N0%
N
N
0% 0%
0%
N NN N N N N
N
N
N
N
0%
NN
N
0%
N
N
NN N 0% 0% 0% N N N
0%N
N
N
N
N
NNN
N
NN
NN
NN N
N
N
N
N
N
0%
0%
N
0%
N
N
N
N
NN
N
0%
0%
Y
0% 0% Y YY
0%
0% 0%YY
0%Y
0% 0% Y
0%0%
0%
0% 0%Y
0%
Y0%
0%
0%
0%
0%0%0% 0%
Y
0% 0%
Y
Y 0% 0%Y
0%
0%
Y Y
Y
0% 0%0% 0% 0% 0% 0%
0%
0%
0%
0%
Y
0%0%
0%
Y
0%
0%
0%0% 0% Y Y Y 0% 0% 0%
Y0%
0%
0%
0%
0%
0%0%0%
0%
0%0%
0%0%
0%0% 0%
0%
0%
0%
0%
0%
Y
Y
0%
Y
0%
0%
0%
0%
0%0%
0%
Y
Y
Y
N N Y YY
N
N NYY
NYN N Y
NN
N
N
NY
N
YN
N
N
N
NNN N
Y
N N
Y
Y N NY
N
N
Y Y
Y
N NN N N N N
N
N
N
N
Y
NN
N
Y
N
N
NN N Y Y Y N N N
YN
N
N
N
N
NNN
N
NN
NN
NN N
N
N
N
N
N
Y
Y
N
Y
N
N
N
N
NN
N
Y
Y
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
N
N
N
N
N
N
N N
N
N
N
N
N
N
N
N
N
NN N
N NN
N
N
N
N
N
N
N
N
NN
N
N
NN
N N
N
N N N N N
N
N
N
N
N
NN
N
N
N
N
N
N
N
NN
N
NN
N
N
N
N
N
N
N
NNN N
N
N
N
N N N N
N
N N
N
N
N
NNN N N
N
N N N NN
N
N
N N NN
NN
Methodology
19
N
N
N
N
100%N
N
100%
100%
N
100%
N
100%
N
N
N
N
N
100% N
N
N
NN
100%
100%
N
100%
N
100%
100% N
100%
100%
100%
100%
100%
100%
N
N
100% N N100%
N N
100%
N
100%
N N 100% 100%
N
100% N
100%
100%N 100%
100%
N 100% 100%100%
100%
N
N NN
N
100%
N
NN
N
100%
100%
N N100% N
100%
• Conduct a site walk
• Based on tracking of physical components / quantities installed
N
25%
75%
25%N
25%
N
25%
N
N
50%
100%
N NN
75%
50%
100%
N
N 25% 50%
N
25% 50% 75%
N
50% 75% N
100%
100%
N 10% 10%
100%
10% 10%
95%
NN
25%100%
NN
N
N
25%
N
Not Applicable Red Orange Yellow Light Green Green Blue
High N 24.99% 49.99% 74.99% 89.99% 99.99% 100Low 0.00% 25.00% 50.00% 75.00% 90.00%
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
100%N 100%
100%
N 100% 100%100%
100%
N
N NN
N
100%
N
NN
N
100%
100%
N N100% N
100%
Methodology
20
N
N
N
N
100%N
N
100%
100%
N
100%
N
100%
N
N
N
N
N
100% N
N
N
NN
100%
100%
N
100%
N
100%
100%
100%
100%
N
N
100% N N100%
N N
100%
N
100%
N N 100% 100%
N
100% N
100%
160_101 - Concierge
100% N
100%
100%
100%
145_113 - CTA Badging
145_114 - CTA Office
110_189 - Crew services
110_185 - Longshore Break Area
110_178 - Agent Services
110_177 - Supervisor
110_173 - Office
145_154 - CBP General Office
145_153 - Mail/Copy
145_152 - Supervisor
145_127 - Hall (NE)
145_162 - Break Room
145_161 - Locker
145_125 - Unified Secondary Inspection
145_140 - Work Room145_141 - Parcel X-ray145_151 - Hall (SW)
145_128 - Security Break Room
• Progress determined via the site walk is transformed into data
N
25%
75%
25%N
25%
N
25%
N
N
50%
100%
N NN
75%
50%
100%
N
N 25% 50%
N
25% 50% 75%
N
50% 75% N
100%
100%
N 10% 10%
100%
10% 10%
95%
NN
25%100%
NN
N
N
25%
N
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Methodology
21
• Progress information is loaded into the database
CEILING GRID
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Signage
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Toilet Partitions & Bath Accessories
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Plumbing Fixtures/Trim
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Insulation
Room % Complete
160_101 – Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Electrical Trim
Room % Complete
160_101 – Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Methodology
22
• Providing progress on a few activities is not difficult• Providing accurate status on a COMPLEX project with a significant
amount of activities is VERY difficult
LV Systems Wiring
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
HM Frames
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Signage
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Toilet Partitions & Bath Accessories
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Plumbing Fixtures/Trim
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Insulation
Room % Complete
160_101 – Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Electrical Trim
Room % Complete
160_101 – Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Methodology
23
LV Systems Wiring
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
HM Frames
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
• Providing progress on a few activities is not difficult• Providing accurate status on a COMPLEX project with a significant
amount of activities is VERY difficult
• That is why PMSI developed a method…
Progress Evaluation Applying Earned Value Management in the Construction of Commercial Buildings
Client: Port of SeattleProject: Terminal 91 Cruise Ship Terminal Project (T91)
Electrical Trim
Room % Complete
160_101 – Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Electrical Trim
Room % Complete
160_101 – Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Toilet Partitions & Bath Accessories
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Toilet Partitions & Bath Accessories
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
60%
60%
57%
100%72%
94% 97% 74%
74%
96% 78% 79% 85%74%
84%
99%
28% 76% 96%79%
96%99%72%
99%
67%
97%
80%88%99% 100%
95%
95%
59%
78% 56% 90% 88%
95%
55% 51%
60%
60%
43%
60%
90%67%
88%
80%
67%
67%
43%
62%
74%
75%80%
81%
67%35%
67%
74%
74%
62%
62%
75%
88%
64%
68%
58%
58%
85%96%
60%
60%
64%75%
82% 83%
80%
76% 96% 80% 97% 92%
62%
87%
85%
85%
88%
98%
37%
80% 81%
79%
68%
97%
80%
68%
45%
68%
62%
80%
67%84% 42%
62% 95%56%
60%
60%
57%
100%72%
94% 97% 74%
74%
96% 78% 79% 85%74%
84%
99%
28% 76% 96%79%
96%99%72%
99%
67%
97%
80%88%99% 100%
95%
95%
59%
78% 56% 90% 88%
95%
55% 51%
60%
60%
43%
60%
90%67%
88%
80%
67%
67%
43%
62%
74%
75%80%
81%
67%35%
67%
74%
74%
62%
62%
75%
88%
64%
68%
58%
58%
85%96%
60%
60%
64%75%
82% 83%
80%
76% 96% 80% 97% 92%
62%
87%
85%
85%
88%
98%
37%
80% 81%
79%
68%
97%
80%
68%
45%
68%
62%
80%
67%84% 42%
62% 95%56%
HM Frames
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
HM Frames
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Signage
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Signage
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Toilet Partitions & Bath Accessories
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Toilet Partitions & Bath Accessories
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Plumbing Fixtures/Trim
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Plumbing Fixtures/Trim
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Electrical Trim
Room % Complete
160_101 – Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Electrical Trim
Room % Complete
160_101 – Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
Methodology
24
• …to apply “Earned Value” management to evaluate construction progress.
LV Systems Wiring
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
LV Systems Wiring
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
CEILING GRID
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
CEILING GRID
Room % Complete
160_101 - Concierge 100%
145_113 - CTA Badging 75%
145_114 - CTA Office 25%
110_189 - Crew services 100%
110_185 - Longshore Break Area 100%
110_178 - Agent Services 50%
110_177 - Supervisor 75%
110_173 - Office 100%
145_154 - CBP General Office 25%
145_153 - Mail/Copy 50%
145_152 - Supervisor 75%
145_127 - Hall (NE) 95%
145_162 - Break Room 100%
145_161 - Locker 100%
145_125 - Unified Secondary Inspection 100%
145_140 - Work Room 10%
145_141 - Parcel X-ray 10%
145_151 - Hall (SW) 100%
145_128 - Security Break Room 25%
P3 Schedule: v9138
Physical Walk through: 02/23/09 ~10:00AMA B C D E F G H I J K L M
PMSI Evaluation P3 % Variance Schedule Variance in DaysAREA PLAN Man
HrsEARNED- Man Hrs
% Complete
(=B/A)
Min Start Max Finish DUR (=E-D)
% Complete EARNED Man Hrs =(G*A)
P3 % vs Physical %
(=C-G)
Elapsed Time to
Date (=Walk date -D)
Elapsed Time to Date % (=J/F)
EARNED Days
(=F*G)
Days Behind (=J-L)
MILESTONES & SUBMITTALS 504 120 24% 08/28/07 03/11/09 561 70% 350 -46% 545 97%
SITEWORK / UTILITIES 8,269 8,087 98% 10/10/07 03/06/09 513 99% 8,212 -2% 509 0
FOUNDATION 15,626 15,626 100% 09/25/07 04/28/08 216 100% 15,626 0% 216 0
STRUCTURE & EXTERIOR 28,201 28,099 100% 04/07/08 02/06/09 305 100% 28,201 0% 305 0
ALL AREAS/FLOORS 3,070 2,126 69% 07/23/08 03/09/09 229 89% 2,722 -19% 215 94% 203 12
ZONE 1 (Grids 1-2) - Crew/Break/Toilets (1) 9,802 9,498 97% 06/23/08 02/11/09 233 98% 9,602 -1% 245 105% 228 17
ZONES 2 & 3 (Grids 2-6) - Baggage Lay-Down (1) 3,988 3,728 93% 06/23/08 02/17/09 239 99% 3,968 -6% 245 103% 238 7
ZONES 4 & 5 (Grids 6-9) - CBP/CTA, Mech/Elec (1) 22,103 21,019 95% 06/16/08 02/13/09 242 100% 22,023 -5% 241 0
ZONE 6 (Grids 9-12) - Entry Lobby 4,827 4,499 93% 07/07/08 02/13/09 221 100% 4,807 -6% 220 0
ZONE 1 (Grids 1-2) - Vestibules (2) 2,627 2,563 98% 07/07/08 02/05/09 213 100% 2,619 -2% 212 0
ZONES 2 & 3 (Grids 2-6) - Lobby & Bathrooms (2) 6,039 5,911 98% 07/14/08 02/11/09 212 100% 6,023 -2% 211 0
ZONES 4 & 5 (Grids 6-9) - Ticketing/Services (2) 6,840 6,080 89% 08/25/08 02/23/09 182 93% 6,348 -4% 182 100% 169 13
TOTAL 111,896 107,356 95.9% 08/28/07 03/11/09 561 98.8% 110,500 -2.8% 545 97.1%
INTERIOR (ZONES 1-6) 56,226 53,298 94.8% 06/16/08 02/23/09 252 98.5% 55,389 -3.7% 252 100% 248 4
MILESTONES
December 1, 2008 1,157 1,156 100% 06/16/08 12/01/08 168 100% 1,157 0% 252 150% 168 84
December 15, 2008 244 243 100% 08/25/08 12/15/08 112 100% 244 0% 182 163% 112 70
January 12, 2009 951 951 100% 06/16/08 01/12/09 210 100% 951 0% 252 120% 210 42
January 19, 2009 9,241 8,766 95% 06/16/08 02/25/09 254 100% 9,228 -5% 252 99% 254 -2
Remainder 44,632 42,182 95% 06/16/08 02/25/09 254 98% 43,809 -4% 252 99% 249 3
TOTAL Interior 56,226 53,298 95% 99% 55,389 -4%
Primavera data per 01/30/09• This has shown SIGNIFICANT results in the increased Visibility and Credibility of the Project Controls.
104,430 ACT
87,478 (P3)
80,346 (EV)
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
Planned Hours - Total Actual Hours - Total Actual Hours (P3) - Total EV Hours - TOTAL
End
If you have further questions – feel free to contact our office
Phone: 253.248.0038
Email: main@pmsvs.com
Or visit our website
www.pmsvs.com
25
top related