MA-MGC-06-011DUYONG PLATFORM

August 2007

Delivering Clean Energy to Your Doorstep

Duyong CPP members are covered with marine growth of up to 4” thick. Removal of the marine growth is beneficial for the platform to:

reduce environmental loading;

improve structural capacity to carry additional deck loads; and

prolong the platform operating life

SCOPE OF WORK

Supervision of installation of marine growth removal and prevention products on the following Duyong CPP members within the splash zone:

• Ten (10) Vertical Diagonal Members (22” OD); • One (1) Vertical Member (18” OD); and• One (1) Sump Caisson (42” OD).

Delivering Clean Energy to Your Doorstep

Delivering Clean Energy to Your Doorstep

Delivering Clean Energy to Your Doorstep

January 2008

Delivering Clean Energy to Your Doorstep

January 2008

Delivering Clean Energy to Your Doorstep

January 2008

Delivering Clean Energy to Your Doorstep

Delivering Clean Energy to Your Doorstep

THANK YOU

Delivering Clean Energy to Your Doorstep

ANY QUESTIONS ?

Delivering Clean Energy to Your Doorstep

Delivering Clean Energy to Your Doorstep

Delivering Clean Energy to Your Doorstep

Delivering Clean Energy to Your Doorstep

top related