608 ParkwayCoppell, Texas

75219

BeganMay 27th 2014

CompletedJune 18th 2014

Property RehabilitationRental Unit

Project

The rehabilitation consisted of 42 individual items targeted for repair and/or replacement.Items included:Electrical-replaced all fixturesPlumbing-replaced all fixtures1 exterior door replacement3 interior door slabs1 interior door replacementInterior door knobsExterior door locksDoor stops throughoutCabinet refinishing throughtoutPaint scheme requirements:Satin on wallsSemi-gloss in wet areasOil based semi-gloss on doors and trim

EntryBottom of front door rotten, patches in concrete from foundation repair, and fascia board with water damage, gutter missing.

Entry

Replaced front door with 6 panel pre-hung metal door and painted. Replaced fascia board and painted, installed gutter, and floated concrete at entry.

220 Volt 50 AmpStove Receptacle

Safety Violationwill not pass City of Coppell inspection

Stove ReceptacleReplaced receptacle box, mounted at stud in wall. Repaired drywall, texture and paint.

Centerpieceof

Living Room

Centerpiece of Living Room

Kitchen

Kitchen

Installed backsplash tile to match fireplace

Master Bathroom

MasterBathroom

Lighting

Lighting

Garage

Garage