psd(screen door)
Post on 07-May-2015
277 Views
Preview:
TRANSCRIPT
Platform Screen Door (PSD)
Line Line 5 Line 6 Line 7 Line 8 Total
Opened 1995 2000 1996 1996 -
Length(km) 52.3 35.1 56.9 17.7 162
Stations 51 38 51 17 157
Company Seoul Metro SMRT Metro 9 Total
Operation Line 4 (Lines 1~4)
4(Lines 5~8)
1 (Line 9)
9 Lines
Length(km) 135 162 27 324
Stations 117 157 25 299
Seoul subway
SMRT
Seoul Meteropolitan Rapid Transit corp.
SMRT’s Platform Screen Door system
Accidents in 2006 22=13 deaths + 9 injuries
SMRT PSD in Railway Gazette
March 2010
SMRT PSD introduced to visitors
Composition of SMRT PSD
Platform side
Platform operation unit
Railway gate
Power supply
ATO
Stop location deviceDriver operation unit
Driver monitor screenTrain distance detector
Ground RF device Car RF device
Railway side
Test bench
Central Control System
Station controlsystem Door engine
New Technology & Fastly Installed PSD
Composition of SMRT PSD
Station control system
Integration part
Center control system
Driving part
Power supply
Test Bench
Structure
Station control system
Platform operation unit
Door control unitDriver operation unit
Integration control RF devices
Stop location detectorDriver monitor screen
Center computer
Maintenance system
Monitor system
Driving motorLocking device
Door engine
Distribution panelEarth
Power supply
New Technology & Fastly Installed PSD
Composition of SMRT PSD
Central control systemRemote Monitoring
Data recording
Reporting
Remote Emergency PSD control
Central Computer Maintenance system
Monitoring system
New Technology & Fastly Installed PSD
SMRT PSD Driving Unit
DoorEngine
30 year life time
Slim &
CompactNo belt
(No Adjustment)
Maintenance Free
Self Lubrication
New screw type driving unit development
Conventional Belt type(10 year life time)
SMRT PSD Driving Unit
Junction box
SPEAKER Door lamp
Locking device
No error, no wrong wiring by module harness typeJust connector to connector connection completes the installationPrevents wrong wiring by module harness job at the factory
BLDC mo-tor
REMOTE SWITCH
Power box
Floor LED guid-ance
Open / close confirmation
sensor
Obstacle sensor
Sensor on emer-gency door
Door con-trol unit
New Technology & Fastly Installed PSD
80Module harness type
Man-Days/station
2
SMRT PSD Module & platform Installation
Step 4Step 3Step 2Step 1
PSD on plat-form
Upper struc-ture
Finishing panel
Conveyanceby motor car
SMRT PSD construction steps(Modular method)
SMRT PSD Module & platform Installation
Modularized Structure
2,5
00
mm
4,800mm
SMRT PSD Installation drawing
SMRT PSD Arrangement drawing
Car 1 Car 3Car 2 Car 4 Car 7Car 5 Car 6 Car 8
Interfaces for SMRT PSD operation
Dwell Light
MARKER COIL
ODL
TWC Loop coil
TWC
L-CTC
ATO
AF
ODS [O: open, C:
clear]
Open Door Relay(ODR)
Train-to-Wayside Communication
DTB: Train Berthed
※ Open Door Sequence
PSD Station control system
PSD
RF Trainborne
RF wayside
SMRT PSD Obstacle Detection methods
1. Optical Detection method
2. Driving motor(BLDC; Brushless Direct Current) surge current detection method
SMRT PSD Monitoring & Control Network
1. NOT USE the “Total surveillance control equipment” at each station office2. BUT, TCP/IP(ethernet protocol) network must be connected to platform or driver control panel to be centrally con-
trolled by adding a new DATA COMMUNICATION MODEM(compact size). 3. Also, regional grouping(4~5 stations) control by one representative station office’s Total surveillance control equip-
ment is possible.
Central control room
Local maintenance of-fice
(Plat-form)
Station Office Equip-ment
Driver Control panel
Platform Control Panel
Newly developed modular method
UNIT assembly at the factory - Homogeneous quality - Cost reduction by line production
Conveyance by motor car & construction on the same day - No piling up of materials - No inconvenience to passengers - No hindrance to train operation
**per 1 station
Man-Hour Reducing PSD Retrofitting Method
SMRT can do and is constantly Evolving for the future!!!
www.smrt.co.kr
top related