Public Workshop #2
March 12, 2020
HART Tampa Arterial BRT Study
BRT Study Introduction
• Purpose: Identify a corridor, using some combination of Florida, Nebraska and/or Fowler avenues to connect Downtown Tampa to the USF Tampa Campus
2
Study Goals• Improve safety and transit operating
conditions
• Improve connectivity for east-west routes
• Improve local transit access for communities between USF and Downtown Tampa, including bicycle and pedestrian connectivity and signalized crossing improvements
3
Initial Alternatives & Screenings• Seventeen (17) alternatives
identified • Florida Ave to Fowler Ave• Nebraska Ave to Fowler Ave• Remaining use 1 of 15 cross-streets to
connect from Florida Ave to Nebraska Ave
• Conducted 2 screenings:• Fatal Flaw Analysis• Preliminary Alternatives Analysis
4
Removed due to overlap with MetroRapid
North/South
17 Initial Alternatives
Fatal Flaw Analysis
3 Preliminary Alternatives
Preliminary Alternatives Analysis
Recommended Initial Alignment
Waters AvenueLinebaugh Avenue
Palm Avenue
Initial BRT Alignment• Linebaugh Ave Alternative is
recommended• Provides the following benefits to
the study area:• A higher opportunity for infill and
redevelopment• Higher existing transit use and
more uses that are compatible with transit
• Higher degree of supporting land use
• A greater potential for transit travel time savings
5
Linebaugh Avenue:Total Alignment: ~12.09 miles
Dedicated Guideway: ~8.04 miles
66% Dedicated Guideway
Median Stations: 7
Curbside Stations: 26 (13 pairs)
Since December 2019…
•We’ve been refining the BRT alignment with a focus on:• Guideway options• Station locations• Operating plan
• Identifying supportive transit and non-motorized projects
6
Recommended BRT Alignment
7
Alignment: ~15.66 miles
Dedicated Guideway: ~11.77miles
71% Dedicated Guideway
Total Number of StationAreas: 19
• Median Stations: 9• Curbside Stations: 10 (9
pairs + 1)
Recommended BRT Guideways
8
Dedicated Bus Lane or Business Access Transit (BAT) Lane
Right Lane Mixed Traffic
Median Running Way (Bi-Directional or Two Lanes
Potential BRT Stations
9
Northern Portion of the Alignment: Linebaugh Ave to USF area
Potential BRT Stations
10
Central Portion of the Alignment: Linebaugh Ave to Hanna Ave
Potential BRT Stations
11
Central Portion of the Alignment: Hillsborough Ave to Floribraska Ave
Potential BRT Stations
12
Southern Portion of the Alignment: Floribraska Ave to Whiting St
Modern BRT Station Concept
13
Shelters with lighting
Pre-board ticketing machines
Security and lighting fixtures
Real-time/ accessible displays
Level boarding and detectable edges
Benches
Trash and recycling containersBicycle parking/ sharing
C
B
A
F
E
DH
G
B
C
A
B
C
D
E
F
G
H
Note: BRT station concept.Final station design to be determined.
Comparative Travel Times
Midpoint Travel Times
Supporting Transit ProjectsFor more detail, please see full size display boards.
Supporting Non-Motorized ProjectsFor more detail, please see full size display boards.
Supporting Non-Motorized ProjectsFor more detail, please see full size display boards.
Next Steps
18
Tasks associated with applying for a Federal Transit Administration Capital
Improvement Grant
Tasks associated with implementationof these projects
2019
Apply for FTA Capital Grant Pursue Supporting Projects Only
Phase 2Begins
Initial Public Workshop
Second Public Workshop
Jun
2020
Dec Mar
1 2
or
Phase 2Recommendation
Phase 1Begins
top related